Skip to content
PlanIndex Get alerts
Menu

Planning application

Brampton The Ellis Church of England Primary School Brampton Road Wath-upon-Dearne 9999

Granted Rotherham RB2016/0503 Heritage

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed Building Consent for replacement windows & doors

As published by the council, reference RB2016/0503

Application record

Reference
RB2016/0503
Type
Heritage
Status
Dec
Decision
GRANTED CONDITIONALLY
Received
20 Apr 2016
Validated
26 Apr 2016
Decided
6 Jul 2016
Ward
Hoober
Decision by
Proposed to be Delegated

Site history

Applications at this address on the Rotherham register

This site has had 2 applications since 2016: 2 approved, 0 refused.

  • RB2016/1126 Granted

    Brampton The Ellis Church of England Primary School Brampton Road Wath-upon-Dearne 9999

    Discharge of condition 02 imposed by planning application RB2016/0503

    Decided 28 Oct 2016 Conditions

Timeline

Dates from the published record

  1. 20 Apr 2016

    Received by Rotherham

  2. 26 Apr 2016

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jul 2016

    Decision issued: GRANTED CONDITIONALLY

  4. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • RB2016/1126 Granted

    Brampton The Ellis Church of England Primary School Brampton Road Wath-upon-Dearne 9999

    Discharge of condition 02 imposed by planning application RB2016/0503

    Decided 28 Oct 2016 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Rotherham granted permission on 6 July 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Rotherham

  • RB2026/0098 Granted

    Oak Cottage Morthen Hall Lane Morthen

    Listed Building Consent for replacement of existing doors and windows, internal alterations to include removal/relocation of non-historic internal wall, and conversion of storeroom to en-suite bedroom

    22 Jan 2026 Heritage and listed buildings
  • RB2025/1247 Granted

    12 Wellgate Rotherham Town Centre

    Listed Building Consent for internal alterations of the first and second floors to provide 3No. flats

    16 Sep 2025 Heritage and listed buildings
  • RB2025/0920 Granted

    Wentworth Woodhouse Wentworth Park G82 Cortworth Lane Wentworth

    Listed Building Consent for the installation of improved track lighting and picture rails to the Whistlejacket, Van Dyck, Ante state rooms and Corridor

    3 Jul 2025 Heritage and listed buildings
  • RB2025/1027 Granted

    34 Turnerwood Lock via Little Lane Anston 0034

    Listed Building Consent for upgrade of SKADA unit with replacement solar unit housing

    29 Jul 2025 Heritage and listed buildings
  • RB2025/0871 Granted

    land off Moorgate Road Moorgate 9999

    Listed building consent for formation of opening in wall

    23 Jun 2025 Heritage and listed buildings