Planning application
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to vary condition 01 (minor changes to footprint and elevations of building 4) imposed by RB2014/1045 Application to vary condition 02 (minor changes to the footprint and elevations and the installation of a conveyor belt between buildings 1 and 11) imposed by RB2013/1331 Installation of a biomass energy development incorporating a 350,000tpa wood pellet manufacturing process and an associated biomass combined heat and power (CHP) plant
As published by the council, reference RB2015/0064
Application record
- Reference
- RB2015/0064
- Type
- Full
- Status
- Dec
- Decision
- GRANTED CONDITIONALLY
- Received
- 19 Jan 2015
- Validated
- 20 Jan 2015
- Decided
- 25 Feb 2015
- Ward
- Boston Castle
- Decision by
- Committee
Site history
Applications at this address on the Rotherham register
This site has had 7 applications since 2015: 7 approved, 0 refused.
-
RB2015/1059 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Application to vary condition 02 (approved plans) imposed by RB2015/0064 (Application to vary condition 01 (minor changes to footprint and elevations of building 4) imposed by RB2014/1045 Application to vary condition 02 (minor changes to the footprint and elevations and the installation of a conveyor belt between buildings 1 and 11) imposed by RB2013/1331 Installation of a biomass energy development incorporating a 350,000tpa wood pellet manufacturing process and an associated biomass combined heat and power (CHP) plant)
-
RB2015/1048 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Non material amendment to application RB2015/0064 to include relocation of the Steam Turbine Building, Main Electrical Building, Ready to Fire Wood Storage Building, Receiving & Processing Building and also the Conveyor Structure that links the Ready to Fire Wood Storage Building to the Biomass Boiler Building
-
RB2015/0757 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Non material amendment to application RB2015/0064 to include relocation of the Boiler House, Flue Gas Treatment Buildings, FGT Tanks & Fly Ash Silo
-
RB2015/0091 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Non-material amendment to application RB2014/1045 to include a reduction in the footprint of the battery room annex to Building No.3
-
RB2015/0076 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Installation of water abstraction point and underground pipework
-
RB2015/0065 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Use of building to accommodate processes and facilities associated with the adjacent Biomass Energy Development (use class sui generis) and siting of new fuel storage tank and pipe bridge
Timeline
Dates from the published record
-
19 Jan 2015
Received by Rotherham
-
20 Jan 2015
Validated
Checked as complete and ready for consideration.
-
25 Feb 2015
Decision issued: GRANTED CONDITIONALLY
-
17 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
3 later applications on the register refer to this one:
-
RB2015/1059 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Application to vary condition 02 (approved plans) imposed by RB2015/0064 (Application to vary condition 01 (minor changes to footprint and elevations of building 4) imposed by RB2014/1045 Application to vary condition 02 (minor changes to the footprint and elevations and the installation of a conveyor belt between buildings 1 and 11) imposed by RB2013/1331 Installation of a biomass energy development incorporating a 350,000tpa wood pellet manufacturing process and an associated biomass combined heat and power (CHP) plant)
-
RB2015/1048 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Non material amendment to application RB2015/0064 to include relocation of the Steam Turbine Building, Main Electrical Building, Ready to Fire Wood Storage Building, Receiving & Processing Building and also the Conveyor Structure that links the Ready to Fire Wood Storage Building to the Biomass Boiler Building
-
RB2015/0757 Granted
Firth Rixson Ickles Works Sheffield Road Templeborough 9999
Non material amendment to application RB2015/0064 to include relocation of the Boiler House, Flue Gas Treatment Buildings, FGT Tanks & Fly Ash Silo
Documents
Plans, drawings, consultee responses and the officer's report
43 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Rotherham granted permission on 25 February 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Rotherham
-
RB2025/0945 Granted
Land between Barnsley Road and Pontefract Road Brampton Bierlow 9999
Application to vary numerous conditions to reflect amendments approved under S96a and to rationalise the conditions to take account of the passage of time since the original permission imposed by application RB2022/0295. This will include proposed amendments to condition 07 (pedestrian refuge)
-
RB2024/1621 Granted
land at Haugh Road Rawmarsh 9999
Erection of 13 dwellings and garages
-
RB2025/1060 Granted
underpass at Europa Link, Poplar Way, Highfield Spring and Brunel Way Catcliffe 9999
Installation of extension to the existing District Heating Network, including above and below ground pipework system, above ground structures, landscaping, and works
-
RB2025/0943 Granted
Waverley New Community off High Field Spring Catcliffe 9999
Application to vary condition 1(amendment to proposed finished floor levels & reduction in build heights) imposed by Planning Application RB2022/1510
-
RB2023/0720 Granted
WaverleyNew Community off High Field Spring Catcliffe 9999
Discharge of conditions 1, 2, 4-9, 11, 12(a), 14-16, 20-27 imposed by planning application RB2022/1275