Skip to content
PlanIndex Get alerts
Menu

Planning application

RR/2025/1676/P

Sunningdale, 22 Waites Lane, Fairlight, Hastings, East Sussex, TN35 4AX

Decided Rother Full Planning

Proposal

Erection of two bay vehicle shelter

As published by the council, reference RR/2025/1676/P

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by Rother

  2. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • THE OAKS, 33 Waites Lane, Fairlight, Hastings, East Sussex, TN35 4AX

    Proposed two storey side extension constructed using materials with similar appearance to the host property. Proposed extension to be set back from the principle elevation with a ridge height that would be no higher than the existing roof.

    24 Oct 2025 0m away Householder
  • RR/2025/1481/P Granted

    CROSSWAYS Smugglers Way, Fairlight, Hastings, East Sussex, TN35 4DG

    Infill extension with changes to existing fenestration and internal alterations.

    9 Aug 2025 276m away Full applications
  • PIXIE WOOD Farley Way, Fairlight, Hastings, East Sussex, TN35 4AS

    Reduce the branches of an oak tree by approx. 3m to boundary line.

    4 Feb 2026 304m away Trees
  • WOODS CORNER Farley Way, Fairlight, Hastings, East Sussex, TN35 4AS

    T1 - Silver Birch - Fell.

    14 Sep 2025 304m away Trees
  • TREETOPS Farley Way, Fairlight, Hastings, East Sussex, TN35 4AS

    T1, Conifer stumps, fell to ground level. T2, Three small Hazel coppices. Coppice 2\3 stems in each group and leave smaller ones to grow. T3, Hazel. Coppice. T4, Hazel. Coppice. T5, Hawthorn. Take down.

    21 Oct 2025 304m away Trees
  • RR/2025/1465/TN Granted

    Battery Hill - Opposite Waites Lane, Fairlight TN35 4AP

    Installation of Subtended Headend Sidepod onto existing BT cabinet.

    1 Aug 2025 452m away Telecoms

In Rother

  • RR/2025/1768/FULL Status unknown

    MEADOW COTTAGE Cackle Street, Brede, Rye, East Sussex, TN31 6DX

    Change of use of existing agricultural building to mixed garage/workshop, including storage for agricultural tools and maintenance equipment, along with proposed extension. (Part retrospective).

    11 Jun 2026 Full applications
  • RR/2026/0759/FULL Status unknown

    29, 31a & 31b Seabourne Road, Bexhill-on-sea, TN40 2SN

    Retrospective application for demolition of existing dwelling and construction of 3 No. detached family dwellings including gardens, parking and access to Seabourne Road

    5 Jun 2026 Full applications
  • RR/2026/0727/FULL Status unknown

    14a, 14 Fairmount Road, Bexhill, Bexhill-on-sea, East Sussex, TN40 2HN

    Single storey rear extension, decking area (with screening) and associated internal alterations to ground floor flat.

    3 Jun 2026 Full applications
  • RR/2026/0712/FULL Status unknown

    Barn And Land Adjoining Hill House Farm Crowhurst Lane, Crowhurst, TN33 9BU

    Proposed new vehicular access and track to serve existing storage barn (to replace existing entrance into site).

    2 Jun 2026 Full applications
  • RR/2026/0682/FULL Status unknown

    Browns Farmhouse Johns Cross Road, Robertsbridge, East Sussex, TN32 5JG

    Change of use from holiday let to annex. No works required.

    21 May 2026 Full applications