Planning application
Land Off Crompton Avenue Rochdale OL16 4PX
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Residential development comprising 18 dwellings (Use Class C3) with associated access, landscaping and infrastructure
As published by the council, reference 23/00425/FUL
Application record
- Reference
- 23/00425/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 26 Apr 2023
- Validated
- 31 May 2023
- Decided
- 7 Feb 2025
- Ward
- Balderstone and Kirkholt
- Parish
- Rochdale South Township
- Decision by
- Delegated Decision
- Postcode
- OL16 4PX
Timeline
Dates from the published record
-
26 Apr 2023
Received by Rochdale
-
31 May 2023
Validated
Checked as complete and ready for consideration.
-
7 Feb 2025
Decision issued: Approve with Conditions
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cobham
506 applications on PlanIndex · across 114 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
121 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 CROMPTON AVENUE, ROCHDALE, OL16 4PB
Single storey side/rear wrap-around extension
Withdrawn Householder Extension 3 docsSmall domestic -
FIELDWAY, ROCHDALE, OL16 4PX
Single storey front extension, single storey rear extension, addition of render to rear elevation, alterations to fenestration, installation of external stair canopy and railing, installation of boundary treatment and associated works including landscaping
Granted Full applications Extension Windows or glazing 15 docsSmall domestic -
33-35 BROAD LANE, ROCHDALE, OL16 4PG
Listed building consent for various internal and external works including the replacement of the windows and rear doors, the replacement of internal doors, the addition of partition walls, the enlargement of a ground floor opening and various repair works.
Granted Heritage and listed buildings Windows or glazing 19 docs -
27, Broad Lane, Rochdale, OL16 4PG
Revision Of Application Number D37384 (Conservatory Extension To Side Of Dwelling And Single Storey Extension To Existing Detached Garage) To Include A Pitched Roof To Existing Garage
Granted Householder ExtensionSmall domestic -
18, Broad Lane, Rochdale, OL16 4PG
Application To Discharge Condition 9 Of Planning Permission D50775
Decided Conditions -
61 Broad Lane Rochdale OL16 4PL
Application for a certificate of lawfulness for proposed re-roofing of dwelling
Granted Heritage and listed buildings 8 docsDomestic
Other full applications applications
In Rochdale
-
PL/2026/0674 Awaiting decision
4 HONITON CLOSE, HEYWOOD, OL10 2PF
Change of use from a dwellinghouse (Use Class C3(a)) to a residential care home for up to three children/young person(s) (Use Class C2)
-
PL/2026/0676 Granted
565 BURY ROAD, ROCHDALE, OL11 4DQ
Shopfront alterations comprising a roller shutter, external cladding and parcel locker (retrospective)
-
PL/2026/0634 Granted
1A RAILWAY STREET, LITTLEBOROUGH, OL15 8AG
Change of use of dwellinghouse and ancillary storage buildings to provide additional floor space for existing nursery including alterations and additions to fenestration (part retrospective)
-
PL/2026/0242 Granted
FIELDWAY, ROCHDALE, OL16 4PX
Single storey front extension, single storey rear extension, addition of render to rear elevation, alterations to fenestration, installation of external stair canopy and railing, installation of boundary treatment and associated works including landscaping
-
PL/2026/0537 Granted
Unit 7 Crown Business Park, Cowm Top Lane, Rochdale, OL11 2PU
Construction of an Energy Storage System (known as a Battery Box)