Archive · Ribble Valley · 2024
Planning applications in Ribble Valley, August 2024
Page 2 of 2, newest first. Back to the first page for August 2024.
Applications, August 2024
Newest first ยท page 2 of 2
-
36719 Granted
3 Higher Hodder Cottages Chipping Road Chaigley BB7 3LP
Retention of retaining wall and proposed earthworks to rear garden
-
36715 Granted
Gypsy Cottage Alston Lane Alston Longridge PR3 3BN
Certificate of Lawfulness for retention of unauthorised extension in breach of condition 2 imposed under application 3/2011/0457 and unauthorised change of use of agricultural land to residential use.
-
36709 Granted
Longridge Recreation Ground Kestor Lane Longridge
Proposed development of wheeled sports facility (pump track) with associated drainage.
-
36710 Granted
Ravenscourt Neville Street Longridge PR3 3FD
Approval of details reserved by conditions 11 (Construction Traffic Management Plan), 12 (Details of site access and off-site works) and 18 (Surface Water Drainage Scheme) of planning permission 3/2023/0956.
-
36712 Granted
Land adjacent to Pewter House Farm Commons Lane Balderstone BB2 7LN
Prior notification for construction of agricultural storage building 30.48m long, 15.24m wide, 3.66m high to eaves, 5.69m high to ridge.
-
36713 Refused
Sykes Barn Longsight Road Copster Green BB1 9ER
Proposed conversion of barn to 3no. four-bedroom, three-storey dwellings with external terraces to rear and conversion of outbuilding to garaging with parking spaces and associated landscaping.
-
36702 Granted
Ground Floor/Basement Flat 36 York Street Clitheroe BB7 2DL
Listed Building Consent for replacement window to front, replacement of plaster and installation of ventilation system.
-
36705 Granted
9 New Row Cottages Knowle Green Preston PR3 2YS
Proposed installation of air source heat pump to rear.
-
36704 Granted
Smalley Fold Farm Commons Lane Balderstone BB2 7LP
Proposed building to cover existing muck midden.
-
36706 Refused
Bramley Farm House Clerk Hill Road Sabden BB7 9FQ
Proposed demolition of existing detached garage and garden office. Construction of detached two-storey building to side with glazed link to farmhouse and single-storey extension to rear of farmhouse.
- Page 1
- Page 2
Other months in 2024
- January 2024 5
- February 2024 9
- March 2024 6
- April 2024 8
- May 2024 22
- June 2024 31
- July 2024 48
- August 2024 60
- September 2024 69
- October 2024 70
- November 2024 47
- December 2024 17