Skip to content
PlanIndex Get alerts
Menu

Planning application

Land off B6478 Wigglesworth Road Slaidburn

Granted Ribble Valley 38242 Applications for full consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Formation of a stone access track and improvements to an existing access.

As published by the council, reference 38242

Application record

Reference
38242
Type
Applications for full consent
Status
Decided - Final Decision
Decision
APPROVED WITH CONDITIONS
Received
26 Feb 2026
Validated
26 Mar 2026
Decided
21 Aug 2026

Timeline

Dates from the published record

  1. 26 Feb 2026

    Received by Ribble Valley

  2. 26 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. 21 Aug 2026

    Decision issued: APPROVED WITH CONDITIONS

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Ribble Valley granted permission on 21 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 2 Chapel Street Slaidburn BB7 3ES

    32443 Submitted 17 Nov 2020 309m away

    Addition of two roof lights on east elevation.

    Granted Full applications Loft or dormer 7 docs
  • 24 Chapel Street Slaidburn BB7 3ES

    38464 Submitted 13 May 2026 314m away

    Listed Building Consent for proposed alterations and repairs, including replacements windows, lintels and thermal upgrade of existing walls and roof.

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • Hark to Bounty Hotel Townend Slaidburn BB7 3EP

    37315 Submitted 14 Mar 2025 423m away

    100% historically approved · decision due ~2 Jun

    Row of 11 conifers to be removed in the rear garden of hotel, stumps to be removed and replaced with a beech hedge.

    Awaiting decision Trees 3 docs
  • Brennands Endowed Primary School Church Street Slaidburn BB7 3ER

    34876 Submitted 3 Nov 2022 453m away

    Application for listed building consent to refurbish existing single-glazed metal and timber windows located within the existing main building to the front and rear elevations with new double glazed timber and PVCu windows, excluding the 1960's extension located to the rear.

    Granted Heritage and listed buildings Extension Windows or glazing 9 docs

In Ribble Valley

  • 38330 Granted

    Fooden Hall Farm Gisburn Road Bolton by Bowland BB7 4LS

    Conversion of existing disused twin barns to 2 dwellings, including removal of derelict farmyard buildings and landscape restoration.

    30 Mar 2026 Full applications
  • 37195 Granted

    Land at The Eagle at Barrow Clitheroe Road Whalley BB7 9AQ

    Proposed hotel development comprising two-storey building (use class C1) with associated parking and landscaping, bin store, air conditioning units and new pedestrian access.

    4 Feb 2025 Full applications
  • 38564 Granted

    16 Warren Fold Hurst Green BB7 9QS

    Proposed demolition of existing conservatory, erection of two-storey rear extension, new entrance porch and installation of rooflights.

    25 Jun 2026 Full applications
  • 38586 Granted

    2A Monks Drive Longridge PR3 3FR

    Proposed change of use from dwelling house (Class C3) to residential childrens home (Class C2) for one child aged 4-18.

    2 Jul 2026 Full applications
  • 37821 Granted

    41 St Marys Drive Langho BB6 8DL

    Proposed side extension with front and rear dormer roof extensions.

    15 Sep 2025 Full applications