Planning application

Spread Eagle Hotel Mellor Lane Mellor BB2 7EG

Granted Ribble Valley 32694 Applications for full consent

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Extension and alterations including demolition of existing north side external wall of restaurant area and construction of a small extension to infill the corner of the restaurant. Alterations to the main entrance to improve customer entrance point and accessibility.

As published by the council, reference 32694

Application record

Reference
32694
Type
Applications for full consent
Status
Decided - Final Decision
Decision
APPROVED WITH CONDITIONS
Received
8 Feb 2021
Validated
19 Feb 2021
Decided
24 Mar 2021
Postcode
BB2 7EG

Timeline

Dates from the published record

  1. 8 Feb 2021

    Received by Ribble Valley

  2. 19 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 24 Mar 2021

    Decision issued: APPROVED WITH CONDITIONS

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Spread Eagle Hotel Mellor Lane Mellor BB2 7EG

    33234 Submitted 29 Jun 2021 0m away

    Discharge of Condition 3 (Materials) of planning application 3/2021/0135.

    Granted Conditions 4 docs
  • Froth Hall Mellor Lane Mellor Lancashire BB2 7EG

    32328 Submitted 9 Oct 2020 0m away

    Removal of condition 4 (Materials) of application 3/2007/0235

    Granted Amendments 3 docs
  • Holmfield Long Row Mellor BB2 7EF

    33190 Submitted 15 Jun 2021 157m away

    Certificate of Lawfulness for construction of two single storey rear extensions within parameters of permitted development rules.

    Withdrawn Lawful development Extension
    Small domestic
  • 2a Long Row Mellor BB2 7EF

    32296 Submitted 29 Sep 2020 157m away

    Rear two storey extension

    Refused Full applications Extension 7 docs
  • Holmfield Long Row Mellor BB2 7EF

    32898 Submitted 30 Mar 2021 157m away

    Proposed single storey side and rear extension and alterations to existing property.

    Refused Full applications Extension 10 docs
    Small domestic
  • The Croft Long Row Mellor BB2 7EE

    38513 Submitted 2 Jun 2026 225m away

    Certificate of Lawfulness for existing use of land as garden area.

    Granted Lawful development 6 docs

In Ribble Valley

  • 38602 Granted

    Forty Acre Farm Forty Acre Lane Longridge PR3 2TU

    Retrospective planning permission for proposed re-surfacing of existing hardstanding within farm yards

    9 Jul 2026 Full applications
  • 38585 Granted

    41 Dogwood Lane Barrow BB7 9GG

    Proposed part conversion of the integral garage to a habitable room and associated external alterations.

    1 Jul 2026 Full applications
  • 38300 Refused

    Land at Albany Drive Copster Green BB1 9EH

    Proposed erection of 26 affordable dwellings with associated access, gardens, parking and landscaping.

    18 Mar 2026 Full applications
  • 38534 Granted

    16 Hayhurst Road Whalley BB7 9RL

    Proposed single-storey side extension, alterations to the south and west elevations including the removal of timber boarding and new k-rend finish.

    12 Jun 2026 Full applications
  • 37989 Granted

    Bromiley Ribchester Road Clayton le Dale BB1 9EG

    Proposed demolition of a detached 4-bed dwelling and erection of one self-build detached four-bed dwelling.

    12 Nov 2025 Full applications