Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0621/CPRO

18 Heol Miskin Pontyclun Rhondda Cynon Taf CF72 9AJ

Awaiting decision Rhondda Cynon Taf Cert of Lawful Use/Operation - Proposed

Proposal

Single storey rear extension replacing conservatory.

As published by the council, reference 26/0621/CPRO

Timeline

Dates from the published record

  1. 16 Jul 2026

    Received by Rhondda Cynon Taf

  2. 20 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rhondda Cynon Taf for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 26/0222/DIS Granted

    Ty Canol Clun Avenue Pontyclun CF72 9AG

    Submission of details required by condition 4 (acoustic report) of planning permission 25/1144/FUL

    12 Mar 2026 184m away Conditions
  • 25/1144/FUL Granted

    Ty Canol Clun Avenue Pontyclun CF72 9AG

    Installation of two external air-conditioning condenser units on the outside elevation of the building

    13 Nov 2025 185m away Full applications
  • 25/1176/ADV Granted

    Cowbridge Road Pontyclun CF72 9EA

    1 x wall-mounted digital display (to replace existing 2 x poster panels).

    20 Nov 2025 330m away Advertising
  • 26/0051/FUL Granted

    Flat 14C Cowbridge Road Pontyclun Rhondda Cynon Taf CF72 9ED

    Change of use of first floor office accomodation (Class B1) located above a ground floor retail unit, to a reformer Pilates studio (Class D2).

    25 Jan 2026 387m away Full applications
  • 26/0546/FUL Awaiting decision

    20 Rhyd-y-nant Pontyclun Rhondda Cynon Taf CF72 9HE

    Flat roof extension to front of former garage which is to be converted into a bedroom

    19 Jun 2026 449m away Full applications

In Rhondda Cynon Taf

  • 26/0614/CPRO Awaiting decision

    Tonypandy Health Centre Anderson Terrace Tonypandy Rhondda Cynon Taf CF40 2LE

    Installation of Solar Photovoltaic (PV) Panels.

    14 Jul 2026 Lawful development
  • 26/0424/CPRO Granted

    15 Tudor Way Llantwit Fardre Rhondda Cynon Taf CF38 2NG

    Provision of Single Storey Side Extension to Existing Property and alterations to rear elevation

    19 May 2026 Lawful development
  • 26/0437/CPRO Granted

    5 The Green Brynna Rhondda Cynon Taf CF72 9ZR

    Replacement of roof finish

    21 May 2026 Lawful development
  • 26/0437/FUL Granted

    5 The Green Brynna Rhondda Cynon Taf CF72 9ZR

    Replacement of roof finish

    21 May 2026 Lawful development
  • 26/0601/CPRO Awaiting decision

    Mountain Halls Forest Grove Treforest Pontypridd Rhondda Cynon Taf

    The proposal is to replace the existing flammable cladding (the timber effect panels) on the existing student accommodation with aluminium or rockpanel wood effect panels. The panels will be in a similar configuration (panel size) to the existing panels but will be A2 s1 d0 rated (non flammable). The colour will be as close a match as possible ? see attached drawing 1033-BPA-ED-ZZ-DG-AR-0004 Existing and Proposed Colour Samples. The height of the building will remain unchanged.

    9 Jul 2026 Lawful development