Planning application
Site Of The Former Chubb Fire Factory Maerdy Industrial Estate Ferndale
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Proposed construction of 32-bed care home with associated facilities, including office spaces, dining areas, kitchen, laundry, and other facilities, as well as associated works including landscaping, car parking, and sustainable drainage. (Remediation Strategy & Implementation Plan Received 26/06/26)
As published by the council, reference 25/0817/FUL
Application record
- Reference
- 25/0817/FUL
- Category
- Full applications
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 24 Jul 2025
- Validated
- 31 Jul 2025
- Decided
- 24 Aug 2026
- Ward
- Ferndale And Maerdy
- Decision by
- Planning and Development Committee
Timeline
Dates from the published record
-
24 Jul 2025
Received by Rhondda Cynon Taf
-
31 Jul 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
24 Aug 2026
Decision issued: Approve
Related applications
Cases linked to this one on the register
3 later applications on the register refer to this one:
-
26/0757/DIS Granted
Ysgol Gynradd Gymraeg Llyn Y Forwyn Maerdy Industrial Estate Ferndale CF43 4AB
Discharge of Condition 3 (Construction Method Statement) of planning permission 25/0817/FUL
-
26/0752/DIS Granted
Ysgol Gynradd Gymraeg Llyn Y Forwyn Maerdy Industrial Estate Ferndale CF43 4AB
Discharge of Condition 5 (Remediation Strategy & Implementation Plan) of planning permission 25/0817/FUL.
-
26/0732/DIS Granted
Ysgol Gynradd Gymraeg Llyn Y Forwyn Maerdy Industrial Estate Ferndale Rhondda Cynon Taf CF43 4AB
Discharge of Condition 4 Biodiversity Mitigation & Enhancement Strategy of application 25/0817/FUL.
Who's behind it
Company information only, from the register and Companies House
LRM Planning Ltd Agent, a planning consultancy registered in Cardiff
Active · incorporated 2013 · Cardiff
245 applications on PlanIndex · across 27 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
69 documents on file for this application
- PH FOLLOWING VERIFICATION REPORT
- REMEDIATION STRATEGY & IMPLEMENTATION PLAN
- NRW
- DWR CYMRU WELSH WATER
- PILING RISK ASSESSMENT
- PUBLIC HEALTH
- NRW
- NRW
- FLOOD RISK MANAGEMENT
- FRM
- PHP
- HYDRAULIC MODELLING REPORT
- FLOOD CONSEQUENCE ASSESSMENT
- ENGINEERING STRATEGY PLAN
- DRAINAGE STRATEGY PLAN
- FRA AND DRAINAGE STRATEGY NOTE
- REMEDIATION STRATEGY
- RESPONSE TO PH RE CONTAMINATION
- GROUND INVESTIGATION REPORT
- PUBLIC HEALTH - CONTAMINATION
- NRW
- REMEDIATION STRATEGY
- HENEB
- FRM
- PLANTING AND MANAGEMENT
- SITE PLAN
- SECTIONS
- NORTH AND EAST ELEVATIONS
- FRA AND DRAINAGE STRATEGY NOTE
- DRAINAGE STRATEGY PLAN
- TRANSPORT STATEMENT
- PUBLIC HEALTH
- ECOLOGY COMMENTS
- ECOLOGY COMMENTS
- HIGHWAYS
- WELSH WATER
- WELSH WATER
- WELSH WATER
- WELSH WATER
- SOUTH WALES POLICE
- HYDROGEOLOGICAL RISK ASSESSMENT
- NATURAL RESOURCES WALES
- NATIONAL GRID ELECTRICITY
- PROPOSED SITE PLAN
- APPLICATIONFORMREDACTED
- 7262-P-0201-P07 FIRST FLOOR PLAN
- 7262-P-0202-P05 ROOF PLAN
- 7262-P-0600-P02 SECTION 01
- 7262-P-0801-P02 3D WEST AND SOUTH ELEVATIONS
- 7262-P-102-P02 SITE LOCATION PLAN
- 7262-P-0200-P09 GROUND FLOOR PLAN
- 085975.000-CUR-00_XX-LR-G-001-V01 - RESPONSE TO CONTAMINATION
- 085975-CUR-XX-XX-T-G-0001-P02 GROUND INVESTIGATION REPORT
- 250710 PAC REPORT_PART1
- 250710 PAC REPORT_PART2
- 250723 LLYN Y FORWYN COVER LETTER
- 250723 LLYN Y FORWYN DAS
- ARBTS_1914.5_FERNDALE_TREEREPORT
- C2237 - FRA AND DRAINAGE STRATEGY NOTE
- C2237_C-SK01 DRAINAGE STRATEGY PLAN_REVD
- C2237_C-SK03 ENGINEERING STRATEGY PLAN_REVB
- C24053.TP01.ISS5 TRAVEL PLAN
- C24053.TS01.ISS4 TRANSPORT STATEMENT
- E24125301 PEA REPORT REV C
- ESP.7422D.03 DESK STUDY ESP 2020_PART1
- ESP.7422D.03 DESK STUDY ESP 2020_PART2
- 25.7356_ENS1_REV3 NOISE IMPACT ASSESSMSENT
- 644.01C GREEN INFRASTRUCTURE STATEMENT AND LANDSCAPE STRATEGY
- 644.02B PLANTING AND MANAGEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Rhondda Cynon Taf granted permission on 24 August 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Rhondda Cynon Taf
-
26/0906/FUL Awaiting decision
6 Woodlands Cwm Alarch Close Glenboi Mountain Ash Rhondda Cynon Taf CF45 3DT
Installation of an Air to Water heat pump, to replace a gas boiler for water & central heating
-
26/0907/FUL Awaiting decision
Mid Glamorgan Service Station, New Cardiff Road, Aberdare, CF44 0AG
THE INSTALLATION OF AN ATM & ASSOCIATED SIGNAGE (retrospective)
-
26/0904/FUL Awaiting decision
Coppins 3 Y Parc Groes-faen Pontyclun Rhondda Cynon Taf CF72 8NP
First Floor Extension Over Garage.
-
26/0905/FUL Awaiting decision
7 Meadow Close Mountain Ash Rhondda Cynon Taf CF45 3DN
Proposed single storey rear extension and division of an existing dwelling into two separate dwellings.
-
26/0886/FUL Awaiting decision
7 Harcourt Road Mountain Ash Rhondda Cynon Taf CF45 3PY
First storey rear extension.