Planning application
11 Glen Brae Bridge Of Weir PA11 3BH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of lawfulness of proposed development for installation of veranda to rear of dwellinghouse
As published by the council, reference 26/0610/CL
Application record
- Reference
- 26/0610/CL
- Status
- Awaiting decision
- Received
- 6 Aug 2026
- Validated
- 27 Aug 2026
- Ward
- 11 - Bishopton, Bridge Of Weir And Langbank
- Decision by
- Delegated
- Postcode
- PA11 3BH
Timeline
Dates from the published record
-
6 Aug 2026
Received by Renfrewshire
-
27 Aug 2026
Validated
Checked as complete and ready for consideration.
-
3 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Renfrewshire took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Renfrewshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Renfrewshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Ardenvohr Fetlar Road Bridge Of Weir Renfrewshire PA11 3AX
Erection of 5 no. detached dwellinghouses and associated works.
Withdrawn Full applications 96 docs -
48B Prieston Road Bridge Of Weir PA11 3AW
Crown reduction to 1x Lime and 1x Sycamore
Granted Trees 8 docs -
BANK OF SCOTLAND 61 Main Street Bridge Of Weir PA11 3ED
Display of externally illuminated fascia sign and internally illuminated projecting sign (in retrospect)
Granted Advertising 8 docs -
Barnacarry Gryffe Road Bridge Of Weir Renfrewshire PA11 3AL
Alteration to rear of dwellinghouse to include installation of rooflight and glazed doors and window alterations
Granted Full applications Loft or dormer Windows or glazing 2 docsDomestic -
Land North West Of Glenling Maxwell Place Bridge Of Weir
Erection of 4 dwellinghouses with associated works and infrastructure
Granted Outline 2 docsSeveral homes -
Gryffe Inn Main Street Bridge Of Weir PA11 3NR
External alterations to public house including replacement signage, painting of building and installation of replacement windows
Withdrawn Heritage and listed buildings Windows or glazing 5 docs