Skip to content
PlanIndex Get alerts
Menu

Planning application

3A Marshall's Lane Paisley PA1 1UU

Granted Renfrewshire 24/0624/PP Planning Permission (Local)

Works: New dwelling

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External alterations to serviced apartments

As published by the council, reference 24/0624/PP

Application record

Reference
24/0624/PP
Type
Planning Permission (Local)
Status
Decided
Decision
Grant Subject to Conditions
Received
3 Sep 2024
Validated
3 Sep 2024
Decided
24 Oct 2024
Ward
5 - Paisley East And Central
Parish
Paisley West And Central Community Council
Decision by
Delegated
Postcode
PA1 1UU

Timeline

Dates from the published record

  1. 3 Sep 2024

    Received by Renfrewshire

  2. 24 Oct 2024

    Decision issued: Grant Subject to Conditions

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Nottingham

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 33 Causeyside Street And 5-9 Orchard Street Paisley PA1 1UL

    22/0489/PP Submitted 7 Jul 2022 30m away

    Refurbishment and alteration of residential tenements including change of use of ground floor retail units to flatted accommodation, external alterations comprising stone repair, infill, and indent, roof repair and renewal, and installation of replacement windows and doors, and erection of boundary wall, gate and fence and formation of hard standing, landscaping and bin stores to rear

    Granted Full applications Extension Roofing +1 53 docs
    Small domestic
  • 33 Causeyside Street Paisley PA1 1UL

    22/0803/LB Submitted 29 Nov 2022 45m away

    Refurbishment and alteration of residential tenements including change of use of ground floor retail units to flatted accommodation, external alterations comprising stone repair, infill, and indent, roof repair and renewal, and installation of replacement windows and doors.

    Granted Heritage and listed buildings Extension Roofing +1 2 docs
  • 18 Bridge Street Paisley PA1 1FA

    26/0390/PP Submitted 12 May 2026 70m away

    96% historically approved · decision due ~7 Aug

    Installation of external awning and formation of external seating associated with restaurant

    Decided 6 docs
  • 23 Causeyside Street Paisley PA1 1UH

    22/0332/PP Submitted 11 May 2022 98m away

    Change of use of bookmakers (Class 1A) to hot food takeaway (sui generis) and installation of extract grill

    Granted Full applications 2 docs
  • 24 Causeyside Street Paisley PA1 1UN

    26/0242/PP Submitted 25 Mar 2026 108m away

    Change of use of former retail shop to hot food carry out and sit in premises together with external flue

    Granted Full applications 18 docs
  • Unit 35c Paisley Centre Causeyside Street Paisley PA1 1UN

    26/0528/AD Submitted 6 Jul 2026 113m away

    96% historically approved · decision due ~31 Aug

    Display of 1 x externally illuminated fascia sign 1x digital screen including vinyl window and door signs.

    Decided Windows or glazing 8 docs

In Renfrewshire

  • 26/0217/PP Granted

    Site 150 Metres North East Of Weels Farm Kaim Road Lochwinnoch

    Installation of 2 no. bio-mass boilers and associated buffer tank and wood chip storage with feed to boiler housed inside building and associated external flues and chip feed silo (in retrospect)

    16 Mar 2026 Full applications
  • 25/1024/PP Granted

    Paisley Grammar School Glasgow Road Paisley PA1 3RP

    Demolition of wings and rear buildings at Paisley Grammar School and erection of flatted development on vacated land, including conversion of original school to flats

    15 Dec 2025 Full applications
  • 26/0198/PP Granted

    Flat 0/1 And Flat 1/1 22 Knockhill Road Renfrew PA4 8EF

    Erection of two detached garages and formation of driveway to rear of flats (in part retrospect)

    6 Mar 2026 Full applications
  • 26/0415/PP Granted

    37 Thornly Park Avenue Paisley PA2 7SE

    Amendment to vehicular access for consented dwellinghouse under approved planning permission 24/0227/PP

    21 May 2026 Full applications
  • 25/0255/PP Refused

    9 Earl Haig Road Hillington Park Glasgow G52 4JU

    Erection of extension to industrial unit

    8 Apr 2025 Full applications