Planning application
1 Cartside Avenue Inchinnan Renfrew PA4 9RU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of solar panels on roof plane
As published by the council, reference 22/0638/PP
Application record
- Reference
- 22/0638/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Grant
- Received
- 7 Sep 2022
- Validated
- 17 Oct 2022
- Decided
- 9 Feb 2023
- Ward
- 12 - Erskine And Inchinnan
- Parish
- Inchinnan Community Council
- Decision by
- Delegated
- Postcode
- PA4 9RU
Timeline
Dates from the published record
-
7 Sep 2022
Received by Renfrewshire
-
17 Oct 2022
Validated
Checked as complete and ready for consideration.
-
9 Feb 2023
Decision issued: Grant
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Hamilton
3 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
AULDS 1 Brownsfield Avenue Inchinnan Renfrew PA4 9RZ
Siting of container for use as hot food takeaway
Granted Full applications 2 docs -
AULDS 1 Brownsfield Avenue Inchinnan Renfrew PA4 9RZ
Placement and configuring of containerised storage within yard consisting of six connected shipping containers
Granted Full applications 7 docs -
The Black Cart Barnsford Road Inchinnan Renfrew PA4 9LZ
Discharge of condition 2 (landscaping) of planning application 23/0486/PP for the erection of detached double garage/store to front of dwellinghouse.
Granted ConditionsDomestic -
THERMO FISHER SCIENTIFIC 3 Fountain Drive Inchinnan Renfrew PA4 9RF
Formation of car park
Granted Full applications 2 docs -
1 Newmains Avenue Inchinnan Renfrew PA4 9RR
Erection of waste treatment plant building
Granted Full applications 2 docs -
5 Newmains Avenue Inchinnan Renfrew PA4 9RR
Erection of new external covered walkway with associated external security turnstiles alongside alterations to existing external exit ramp and footpaths and kerbs within car park
Granted Full applications 18 docs
Other full applications applications
In Renfrewshire
-
26/0217/PP Granted
Site 150 Metres North East Of Weels Farm Kaim Road Lochwinnoch
Installation of 2 no. bio-mass boilers and associated buffer tank and wood chip storage with feed to boiler housed inside building and associated external flues and chip feed silo (in retrospect)
-
25/1024/PP Granted
Paisley Grammar School Glasgow Road Paisley PA1 3RP
Demolition of wings and rear buildings at Paisley Grammar School and erection of flatted development on vacated land, including conversion of original school to flats
-
26/0198/PP Granted
Flat 0/1 And Flat 1/1 22 Knockhill Road Renfrew PA4 8EF
Erection of two detached garages and formation of driveway to rear of flats (in part retrospect)
-
26/0415/PP Granted
37 Thornly Park Avenue Paisley PA2 7SE
Amendment to vehicular access for consented dwellinghouse under approved planning permission 24/0227/PP
-
25/0255/PP Refused
9 Earl Haig Road Hillington Park Glasgow G52 4JU
Erection of extension to industrial unit