Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Glasgow Road Paisley PA1 3QS

Granted Renfrewshire 21/1690/PP Planning Permission

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alteration to planning application 20/0281/PP to include rooflights to front and dormers with balcony to rear

As published by the council, reference 21/1690/PP

Application record

Reference
21/1690/PP
Type
Planning Permission
Status
Decided
Decision
Grant
Received
18 Nov 2021
Validated
7 Dec 2021
Decided
6 Apr 2023
Ward
3 - Paisley Northeast And Ralston
Parish
Paisley East And Whitehaugh Community Council
Decision by
Delegated
Postcode
PA1 3QS

Timeline

Dates from the published record

  1. 18 Nov 2021

    Received by Renfrewshire

  2. 7 Dec 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 Apr 2023

    Decision issued: Grant

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Glasgow Road Paisley PA1 3QS

    21/1691/LB Submitted 19 Nov 2021 1m away

    Alteration to previous application 20/0307/LB to include rooflights to front and dormers with balcony to rear

    Granted Heritage and listed buildings Loft or dormer 2 docs
  • 17 Glasgow Road Paisley PA1 3QS

    20/0307/LB Submitted 8 Jun 2020 5m away

    External and internal alterations to building

    Granted Heritage and listed buildings 2 docs
  • First Floor 1 The Robertson Centre 16 Glasgow Road Paisley PA1 3QF

    26/0265/PP Submitted 30 Mar 2026 81m away

    97% historically approved · decision due ~25 May

    Erection of fencing with associated access gates

    Awaiting decision Full applications 23 docs
  • Lagoon Leisure Centre 11 Christie Street Paisley PA1 1NB

    26/0427/PP Submitted 28 May 2026 96m away

    96% historically approved · decision due ~31 Jul

    External alterations to elevations of leisure centre building comprising of the installation of 2 no. louvre grills and 1 no. condensing unit

    Decided 11 docs
  • Flat 2/1 2 Christie Street Paisley PA1 1NB

    26/0525/LB Submitted 6 Jul 2026 96m away

    100% historically approved · decision due ~7 Sep

    Installation of replacement windows to flatted dwelling

    Decided Heritage and listed buildings Windows or glazing 6 docs
    Domestic
  • 27 Glasgow Road Paisley Renfrewshire PA1 3PA

    21/1251/PP Submitted 27 May 2021 117m away

    Change of use from Class 2 offices to two residential flats.

    Granted Full applications New dwelling 3 docs

In Renfrewshire

  • 26/0217/PP Granted

    Site 150 Metres North East Of Weels Farm Kaim Road Lochwinnoch

    Installation of 2 no. bio-mass boilers and associated buffer tank and wood chip storage with feed to boiler housed inside building and associated external flues and chip feed silo (in retrospect)

    16 Mar 2026 Full applications
  • 25/1024/PP Granted

    Paisley Grammar School Glasgow Road Paisley PA1 3RP

    Demolition of wings and rear buildings at Paisley Grammar School and erection of flatted development on vacated land, including conversion of original school to flats

    15 Dec 2025 Full applications
  • 26/0198/PP Granted

    Flat 0/1 And Flat 1/1 22 Knockhill Road Renfrew PA4 8EF

    Erection of two detached garages and formation of driveway to rear of flats (in part retrospect)

    6 Mar 2026 Full applications
  • 26/0415/PP Granted

    37 Thornly Park Avenue Paisley PA2 7SE

    Amendment to vehicular access for consented dwellinghouse under approved planning permission 24/0227/PP

    21 May 2026 Full applications
  • 25/0255/PP Refused

    9 Earl Haig Road Hillington Park Glasgow G52 4JU

    Erection of extension to industrial unit

    8 Apr 2025 Full applications