Planning application
HSBC 107 High Street Banstead Surrey SM7 2NR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of 1no external machine and installation of 1no new external machine. Modifications to existing aperture to be undertaken as necessary and all external finishes to be made good and to match existing. Removal of existing associated sign and installation of new external associated sign. As amended on 17/08/2022.
As published by the council, reference 22/01707/F
Application record
- Reference
- 22/01707/F
- Type
- Full planning
- Status
- Decided (Approved)
- Decision
- Approved with Conditions
- Received
- 3 Aug 2022
- Validated
- 3 Aug 2022
- Decided
- 28 Sep 2022
- Ward
- Banstead Village
- Decision by
- Head of Places and Planning
- Postcode
- SM7 2NR
Timeline
Dates from the published record
-
3 Aug 2022
Received by Reigate and Banstead
-
28 Sep 2022
Decision issued: Approved with Conditions
-
31 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
HSBC 107 High Street Banstead Surrey SM7 2NR
1no ATM customer information sign. As amended on 30/08/2022.
Granted Advertising 10 docs -
103B High Street Banstead Surrey SM7 2NL
Submission of energy and water efficiency statement details pursuant to Condition 7 of permission 20/02468/F. Extension to first floor office at rear to form a self contained unit of residential accommodation.
Granted Conditions Extension 5 docs -
103B High Street Banstead Surrey SM7 2NL
Submission of materials details pursuant to Condition 3 of permission 20/02468/F. Extension to first floor office at rear to form a self contained unit of residential accommodation.
Granted Conditions Extension 6 docs -
103B High Street Banstead Surrey SM7 2NL
Submission of storage of bins details pursuant to Condition 6 of permission 20/02468/F. Extension to first floor office at rear to form a self contained unit of residential accommodation.
Granted Conditions Extension 5 docs -
103B High Street Banstead Surrey SM7 2NL
Submission of energy and water efficiency information pursuant to condition 9 of permission 22/00939/F. Extension of first floor at rear to form 2 self-contained units of accommodation.
Granted Conditions Extension 5 docs -
103B High Street Banstead Surrey SM7 2NL
Submission of a construction management transport plan pursuant to condition 6 of permission 22/00939/F. Extension of first floor at rear to form 2 self-contained units of accommodation.
Granted Conditions Extension 5 docs
Other full applications applications
In Reigate and Banstead
-
26/01325/F Awaiting decision
Orchard Bungalow Beechen Lane Lower Kingswood Surrey KT20 6RY
Conversion of single residential dwelling house (bungalow) into two residential dwellings.
-
26/01399/F Awaiting decision
Flat 2 Whisperer Villa Yattendon Road Horley Surrey RH6 7BS
Loft Conversion.
-
26/01304/F Awaiting decision
Earlswood Scout Group HQ Earlswood Road Redhill Surrey RH1 6HE
Demolition of existing Scout Hall to provide a new purpose-built Scout Hall over 2 levels meeting accessibility requirements. Works include part demolition of extensions to the existing separate Art Matters hall and improvements to the main hall including accessible WC and access. External works include formalising existing parking and enhancing landscaping across the wider site.
-
26/00691/F Refused
BNP Care La Luz 4 High Street Tadworth Surrey KT20 5SD
Demolition of rear extensions, conservatory and partition walls at ground floor level. Construction of 2 single storey rear extensions and glass-roofed conservatory between. Construction of side extension at first floor level on southeast flank with new dormer window. Main roof extensions at rear and on southeast flank, each with new dormer windows. Alteration to fire escape staircase from first floor level. Installation of new lift serving all 3 floors. New rear terrace and ramp to garden. Soft landscaping to front parking area. As amended on 29/06/2026, 20/07/2026 and on 14/08/2026.
-
26/01301/F Awaiting decision
53 Partridge Mead Banstead Surrey SM7 1LW
Demolition of the existing detached garage and erection of one detached single-storey two-bedroom, three-person dwelling within the rear garden of No.53 together with associated access, widening of the existing vehicular crossover, provision of three off-street parking spaces, relocation of the principal entrance to the existing dwelling, private amenity space, cycle and refuse storage, landscaping and associated external works