Skip to content
PlanIndex Get alerts
Menu

Planning application

1A, Dover Road, London, E12 5DZ

Awaiting decision Redbridge 1998/26 Householder

Works: Extension Roofing Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Double storey front bay window extension. Single storey replacement side link extension. Single storey rear extension with a rear patio. New pitched roof over existing rear flat roof extension. Replace windows and doors and alterations to external facade / cladding. Replacement roof finishes and rainwater goods. (Summary).

As published by the council, reference 1998/26

Application record

Reference
1998/26
Type
Householder
Status
Under assessment
Received
28 Jul 2026
Validated
4 Aug 2026
Ward
Wanstead Park
Postcode
E12 5DZ

Timeline

Dates from the published record

  1. 28 Jul 2026

    Received by Redbridge

  2. 4 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Redbridge took a median of 37 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Redbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

In Redbridge

  • 1764/26 Granted

    42, Chiltern Way, Woodford Green, IG8 0RQ

    Detached rear outbuilding. (Summary).

    3 Jul 2026 Householder
  • 2025/26 Granted

    16, GLENTHORNE GARDENS, BARKINGSIDE, ILFORD, IG6 1LB

    Detached rear outbuilding. (Summary).

    31 Jul 2026 Householder
  • 2921/25 Refused

    29, Tennyson Avenue, Wanstead, London, E11 2QN

    Single storey rear extension with steps leading into the garden. Alterations to fenestrations. (Summary).

    13 Oct 2025 Householder
  • 2297/26 Awaiting decision

    56, Billet Road, CHADWELL HEATH, Romford, RM6 5SU

    Part first floor front / side extension. One front rooflight. (Summary).

    1 Sep 2026 Householder
  • 2282/26 Awaiting decision

    9, Broadwalk, SOUTH WOODFORD, London, E18 2DJ

    Two storey side extension. Two storey front extension to create bay windows. Single storey rear extension. Extension to existing rear dormer incorporating Juliette balcony. Alterations to fenestrations. (summary)

    1 Sep 2026 Householder