Planning application
Development At Evergreen Field Former 28 And 30, High Street, WANSTEAD, London
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions for approved permission 1759/23 (as amended by Non-Material Amendment 1759/23/07): Biodiversity Compensation & Enhancement Strategy (Condition 23) (summary)
As published by the council, reference 1759/23/11
Application record
- Reference
- 1759/23/11
- Type
- Discharge of Condition(s)
- Status
- Decided
- Decision
- Granted/Approved/Agreed
- Received
- 15 Aug 2025
- Validated
- 16 Aug 2025
- Decided
- 31 Oct 2025
- Ward
- Wanstead Village
- Decision by
- Delegated C/Signed G. Cooper
Timeline
Dates from the published record
-
15 Aug 2025
Received by Redbridge
-
16 Aug 2025
Validated
Checked as complete and ready for consideration.
-
31 Oct 2025
Decision issued: Granted/Approved/Agreed
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Development At Evergreen Field Former 28 And 30, High Street, London
Discharge of Conditions of approved permission 1759/23 (as amended by Non-Material Amendments 1759/23/07 and 1759/23/14): Facing Materials (Partial discharge of Condition 5 - Residential element only.) (summary)
Granted Conditions 5 docs -
Development At Evergreen Field Former 28 And 30, High Street, London
Non-material amendment to approved permission 1759/23 (as amended by non-material amendments 1759/23/07 and 1759/23/14): Revised Energy Report to reflect design development. (summary)
Granted Amendments 5 docs -
Development At Evergreen Field Former 28 And 30, High Street, WANSTEAD, London
Discharge of conditions for approved permission 1759/23 (as amended by Non-Material Amendment 1759/23/07): Ecological Enhancement Strategy (Condition 11) (summary)
Granted Conditions 5 docs -
Development At Evergreen Field Former 28 And 30, High Street, WANSTEAD, London
Discharge of conditions for approved permission 1759/23: Attenuation Volume (Condition 20). (Summary).
Granted Conditions 4 docs -
Development At Evergreen Field Former 28 And 30, High Street, London
Non-material amendment to approved permission 1759/23 (as amended by non-material amendments 1759/23/07 and 1759/23/14): Alterations to wording of Condition 8 (Secure by Design) to: 'The building shall obtain separate “Non-Residential (Nursery)” & “Residential” ‘Secured by Design’ Accreditation within 6 months of first occupation of the associated part of the building. The development shall only be carried out in accordance with the approved details and maintained thereafter'. (summary)
Granted Amendments 5 docs -
Development At Evergreen Field Former 28 And 30, High Street, WANSTEAD, London
Discharge of condition of approved permission 1759/23: Internal Sound and Vibration Transmission (Condition 27), Plant Noise Emissions (Condition 28). (Summary)
Granted Conditions 4 docs
Other conditions applications
In Redbridge
-
1955/24/08 Granted
Park School For Girls, 20-22, Park Avenue and 13 Granville Road, Ilford
Discharge of conditions for approved permission 1955/24: Soft Landscaping and Trees (Condition 12). (Summary).
-
0052/26/02 Awaiting decision
DEVELOPMENT AT HUNTER COURT AND HOMESDALE 5 TO 7, NEW WANSTEAD, LONDON
Discharge of conditions for approved permission 0052/26: Protection of trees (Condition 4); Construction Management & Logistics Plan (Condition 5); Construction Environmental Management Plan (Condition 6); Biodiversity Net Gain Plan (Condition 8). (Summary).
-
4462/20/03 Granted
Development Site Between 43 And 45 Clarence Avenue And Rear Of Montrose House 412 To 416, Eastern Avenue, Ilford
Discharge of condition of approved permission 4462/20:Pilling Method Statement (Condition 5), Cycle parking (Condition 17), Sound Insulation and Ventilation Strategy (Condition 29 - partial discharge for Phase 1 only). (Summary)(AMENDED)
-
3269/25/02 Awaiting decision
Development At 466 To 478, Cranbrook Road, Ilford
Discharge of Conditions of approved permission 3269/25: Noise Standards (Condition 2). (summary)
-
3746/23/03 Awaiting decision
Development At 48, Aldersbrook Road, Wanstead, London
Discharge of conditions of approved permission 3746/23: Materials (Condition 3). (summary)