Planning application
27, GLOUCESTER ROAD, WANSTEAD, LONDON, E11 2ED
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions of approved permission 1017/25: Protection of Trees (Condition 5). (summary)
As published by the council, reference 1017/25/01
Application record
- Reference
- 1017/25/01
- Type
- Discharge of Condition(s)
- Status
- Decided
- Decision
- Granted/Approved/Agreed
- Received
- 30 Sep 2025
- Validated
- 1 Oct 2025
- Decided
- 13 Nov 2025
- Ward
- Wanstead Village
- Decision by
- Delegated C/Signed C. Zhandire
- Postcode
- E11 2ED
Timeline
Dates from the published record
-
30 Sep 2025
Received by Redbridge
-
1 Oct 2025
Validated
Checked as complete and ready for consideration.
-
13 Nov 2025
Decision issued: Granted/Approved/Agreed
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
25, Gloucester Road, Wanstead, London, E11 2ED
T1 (Holly) - Crown reduction of no more than 30% (summary)
Granted Trees 3 docs -
19, Gloucester Road, Wanstead, London, E11 2ED
Loft conversion with rear dormer incorporating Juliette balcony. Hip to gable roof alterations. Three front roof lights. New window in gable end. (summary)
Granted Householder Loft or dormer Roofing +1 17 docsDomestic -
19, Gloucester Road, Wanstead, London, E11 2ED
Formation of means of access to a highway. Front driveway and soft landscaping. Single storey rear/side extension with a patio. Alterations to fenestrations. (Summary)
Refused Householder Extension 13 docsSmall domestic -
Development At 50, Buckingham Road, Wanstead, London
Removal of Condition 12 of approved planning permission 2044/20: Dropped kerb. (Summary).
Granted Amendments 4 docs -
Development At 50, Buckingham Road, WANSTEAD, London
79% historically approved · decision due ~6 Oct
Variation of Condition 2 and Removal of Condition 6 of approved permission 0452/25: Changes to approved design and developed footprint. Dwelling house is to be reduced in depth, shifting front elevation back; no changes to rear elevation or rear massing proposed. No new dropped kerb or alterations proposed. (summary)
Awaiting decision Amendments 10 docsSmall domestic -
15, Gloucester Road, Wanstead, London, E11 2ED
T1, T2, T3, T4, T5, T6 (Conifer) & T7 (Bay) - fell and replace. (Summary)
Granted Trees 5 docs
Other conditions applications
In Redbridge
-
1955/24/08 Granted
Park School For Girls, 20-22, Park Avenue and 13 Granville Road, Ilford
Discharge of conditions for approved permission 1955/24: Soft Landscaping and Trees (Condition 12). (Summary).
-
0052/26/02 Awaiting decision
DEVELOPMENT AT HUNTER COURT AND HOMESDALE 5 TO 7, NEW WANSTEAD, LONDON
Discharge of conditions for approved permission 0052/26: Protection of trees (Condition 4); Construction Management & Logistics Plan (Condition 5); Construction Environmental Management Plan (Condition 6); Biodiversity Net Gain Plan (Condition 8). (Summary).
-
4462/20/03 Granted
Development Site Between 43 And 45 Clarence Avenue And Rear Of Montrose House 412 To 416, Eastern Avenue, Ilford
Discharge of condition of approved permission 4462/20:Pilling Method Statement (Condition 5), Cycle parking (Condition 17), Sound Insulation and Ventilation Strategy (Condition 29 - partial discharge for Phase 1 only). (Summary)(AMENDED)
-
3269/25/02 Awaiting decision
Development At 466 To 478, Cranbrook Road, Ilford
Discharge of Conditions of approved permission 3269/25: Noise Standards (Condition 2). (summary)
-
3746/23/03 Awaiting decision
Development At 48, Aldersbrook Road, Wanstead, London
Discharge of conditions of approved permission 3746/23: Materials (Condition 3). (summary)