Planning application
06/2025/1226
29, Bairstow Street, Preston, PR1 3TN
Proposal
Change of use of 3no. flats (Class C3) and a 2no. bed house in multiple occupation (Class C4) to an 8no. bed house in multiple occupation (Sui Generis) including alterations to existing window opening to form a door at the rear
As published by the council, reference 06/2025/1226
Timeline
Dates from the published record
-
1 Dec 2025
Received by Preston
-
12 Feb 2026
Decision issued: Approval with conditions
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
06/2026/0369 Status unknown
29, Bairstow Street, Preston, PR1 3TN
Amendment to planning permission 06/2025/1226 to alter the internal layout
-
06/2025/1180 Granted
43, Chaddock Street, Preston, PR1 3TL
Listed building consent for the replacement of all external timber doors with like-for-like units
-
06/2025/1179 Granted
43, Chaddock Street, Preston, PR1 3TL
Replacement of all external timber doors with like-for-like units
-
06/2026/0250 Status unknown
Harris Institue, Avenham Lane, Preston, PR1 3SS
Discharge of condition 7 (Methodology) attached to Listed Building Consent 06/2024/0490
-
06/2025/0864 Decided
Harris Institute, Avenham Lane, Preston, PR1 3SS
Discharge of condition no.7 (Exterior and interior conservation and intervention methodology) and no.8 (Traffic management plan) attached to planning permission 06/2024/0489
-
06/2025/0814 Decided
Harris Institute, Avenham Lane, Preston, PR1 3SS
Discharge of condition no.7 (Conservation and Intervention Methodology) attached to Listed Building Consent 06/2024/0490
Other full applications applications
In Preston
-
06/2026/0414 Status unknown
Church Hill House, Durton Lane, Preston, PR3 5LD
1no. self-build dwelling and detached garage following demolition of existing dwelling
-
06/2026/0123 Withdrawn
51-52, Friargate, Preston, PR1 2AT
Change of use of first floor from storage and second floor from staff accommodation to 11no. bed house in multiple occupation (Sui Generis) (Part Retrospective)
-
06/2026/0490 Status unknown
10 Mosslea Drive, Preston, PR3 5AZ
First floor/two storey side extension
-
06/2026/0062 Granted
138, Lockside Road, Preston, PR2 2EF
Single storey store and shower room side extension (following demolition/removal of existing shed)
-
06/2026/0203 Granted
Moss Acre, 404, Tag Lane, Preston, PR2 7AB
Single storey rear extension