Planning application
The Mount Llanymynech Powys SY22 6HA
Works: Demolition
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Conservation Area Consent for the demolition of outbuildings
As published by the council, reference P/2008/1101
Application record
- Reference
- P/2008/1101
- Type
- Conservation Area Consent
- Status
- Permitted
- Decision
- Granted As published: Consent
- Received
- 17 Jul 2008
- Validated
- 17 Jul 2008
- Decided
- 12 Sep 2008
- Parish
- Carreghofa Community
- Decision by
- Delegated
- Postcode
- SY22 6HA
Site history
Applications at this address on the Powys register
This site has had 3 applications since 2007: 1 approved, 1 refused.
-
P/2008/1080 Refused
The Mount Llanymynech Powys SY22 6HA
Erection of two ancillary buildings to existing dwelling and installation of a septic tank (resubmission)
-
M/2007/1116 Withdrawn
The Mount Llanymynech Powys SY22 6HA
Erection of two ancillary buildings to existing dwelling and installation of a septic tank
Timeline
Dates from the published record
-
17 Jul 2008
Received by Powys
-
12 Sep 2008
Decision issued: Consent
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Doug Hughes Architects Ltd Agent, an architecture practice
78 applications on PlanIndex · 75% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Powys granted permission on 12 September 2008, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Mount Llanymynech Powys SY22 6HA
Erection of two ancillary buildings to existing dwelling and installation of a septic tank (resubmission)
Refused Full applications 1 docDomestic -
The Mount Llanymynech Powys SY22 6HA
Erection of two ancillary buildings to existing dwelling and installation of a septic tank
Withdrawn Full applicationsDomestic -
2 The Gardd Llanymynech SY22 6EX
External and internal works to include refurbishment to doors and windows
Granted Heritage and listed buildings Windows or glazing 17 docs -
-
1 Ashfield Terrace Llanymynech Powys SY226EU
Change of use from doctor s surgery to residential use
Granted Full applications -
4 Orchard Green Llanymynech Powys SY22 6PJ
Erection of a single storey extension
Granted Full applications ExtensionSmall domestic
Other heritage and listed building applications
In Powys
-
P/26/0462/LBC Granted
Pont Ithel Bridge , Pontithel, Brecon, LD3 0SA
Repair works to bridge to include rebuild of a section of loss on upstream pier at foundation level
-
P/26/0187/LBC Granted
OLD POST OFFICE, GLADESTRY, KINGTON, HR5 3NR
Internal works including block up two doorways as well as disconnecting electrical and heating supply
-
P/26/0540/LBC Granted
SUTTON BARN, HIGH STREET, PRESTEIGNE, LD8 2BA
Form new internal door opening
-
P/26/1135/LBC Awaiting decision
NEUADD FACH, LLANFAREDD, BUILTH WELLS, LD2 3TE
Erection of a single storey rear extension, re-roofing, replacement joinery and associated internal and structural alterations
-
P/26/1014/LBC Awaiting decision
THE GRAPES INN, SALOP ROAD, WELSHPOOL, SY21 7EZ
Internal and external works to include replacement external door and x3 windows