Planning application
The Rhos Farm Kinnerton Presteigne Powys LD8 2PD
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Full: Erection of single storey side extension for disabled adaptions (SO 26 SE)
As published by the council, reference P/2008/0426
Application record
- Reference
- P/2008/0426
- Type
- Full application
- Status
- Permitted
- Decision
- Consent
- Received
- 1 Apr 2008
- Validated
- 1 Apr 2008
- Decided
- 23 Jun 2008
- Parish
- Old Radnor Community
- Decision by
- Delegated
- Postcode
- LD8 2PD
Timeline
Dates from the published record
-
1 Apr 2008
Received by Powys
-
23 Jun 2008
Decision issued: Consent
-
28 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a surveying firm registered in Abergavenny
2 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Railsgate Fields, Kinnerton, Presteigne
Erection of tractor/implement shed SO 26 SE
Granted Full applicationsSmall domestic -
Whimble Nursery Kinnerton Presteigne LD8 2PD
Full: Erection of a utility building to provide an information point and office studio
Granted Full applications -
Newcastle Court Evancoyd Presteigne Powys LD8 2PA
Listed Building Consent: Repair and renovation of building. Re-render externally, remove modern conservatory and install window, repair all windows, remove areas of dry rot, renew studding to external wall and re-plaster. Renew internal joinery to match existing, new fireplaces to match those shown in 1905 photograph, remove modern infilling to Tudor Arch and replace with new door and screens to match existing window style and other internal and external alterations
Withdrawn Heritage and listed buildings Extension Windows or glazing
Other full applications applications
In Powys
-
25/1761/FUL Granted
Ty Capel, Pennant, Llanbrynmair, SY19 7BL
Change of use of land to domestic curtilage, erection of an ancillary storage building and access track
-
P/26/0063/FUL Granted
PARC YR ESGOB, LLANWNOG, CAERSWS, SY17 5NY
Erection of a dry manure storage building and associated works
-
P/26/0416/FUL Granted
THE WAEN FARM, FELINDRE, KNIGHTON, LD7 1YT
Extension to an existing agricultural building
-
P/26/0275/FUL Granted
YSTRADGNLAIS RUGBY FOOTBALL CLUB, YNYSCEDWYN ROAD, YSTRADGYNLAIS, SWANSEA, SA9 1BH
Installation of 1 no. EV charger and feeder pillar
-
P/26/0893/FUL Awaiting decision
LLWYNMADOC FARM, ABERMULE, MONTGOMERY, SY15 6JW
Erection of manure storage building