Skip to content
PlanIndex Get alerts
Menu

Planning application

Burton House Llandegley Llandrindod Wells Powys LD1 5UF

Granted Powys P/2008/0332 Listed Building Consent

Works: Extension

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

LBC: Remove rear lean-to extension and reduce wall to level of retaining wall to Churchyard and cap with cock and end stonework; install mechanical extract fans to South and West elevations; reinstate chimney to East gable at ridge; lower external ground levels to East and North elevations; build up walls to East elevations in stone to match existing and roof with welsh slate; provide new doors to East and North elevations and other internal and external alterationsSO 16 SW

As published by the council, reference P/2008/0332

Application record

Reference
P/2008/0332
Type
Listed Building Consent
Status
Permitted
Decision
Consent
Received
10 Mar 2008
Validated
10 Mar 2008
Decided
1 Sep 2008
Parish
Penybont Community
Decision by
Delegated
Postcode
LD1 5UF

Timeline

Dates from the published record

  1. 10 Mar 2008

    Received by Powys

  2. 1 Sep 2008

    Decision issued: Consent

  3. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

122 applications on PlanIndex · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Powys granted permission on 1 September 2008, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Powys

  • P/26/0880/LBC Awaiting decision

    MIN Y NANT, LLAWR-Y-GLYN, CAERSWS, SY17 5RH

    Installation of a stairlift together with shower room adaptations

    20 Aug 2026 Heritage and listed buildings
  • P/26/0876/LBC Awaiting decision

    Parc Gwyn, Glasbury, Hereford, Powys, HR3 5LL

    To dismantle and reconstruct chimney stack to address water ingress (external demolition in conservation area)

    20 Aug 2026 Heritage and listed buildings
  • 25/0010/LBC Granted

    Poste House 32 High Street Presteigne Powys LD8 2BE

    Internal and external works to include, replacement windows and external ramp and steps (part-regularisation of works)

    2 Jan 2025 Heritage and listed buildings
  • P/26/0077/LBC Granted

    THE HAIM, LLANDRINIO, LLANYMYNECH, SY22 6SQ

    Re-routing of an existing surface water drainage run to a new soakaway, together with the stitching and repair of an existing crack in the wall

    1 Apr 2026 Heritage and listed buildings
  • P/26/0374/LBC Granted

    Tu Hwnt I Gain, Llansantffraid-Ym-Mechain, Powys, SY22 6XR

    Adding oak weatherboarding to east outer gable

    26 Mar 2026 Heritage and listed buildings