Planning application
Prestabuan Barn, Newbridge-On-Wye, Powys
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Listed Building Consent for alteration of roof (timber barn) from thatch to slate
As published by the council, reference B/0006/0360
Application record
- Reference
- B/0006/0360
- Type
- Heritage
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 25 Oct 2006
- Validated
- 3 Nov 2006
- Decided
- 15 Mar 2019
- Parish
- Llanwrthwl Community
Timeline
Dates from the published record
-
25 Oct 2006
Received by Powys
-
3 Nov 2006
Validated
Checked as complete and ready for consideration.
-
15 Mar 2019
Decision issued: Withdrawn
-
21 Sep 2026
Added to PlanIndex
What withdrawal means
The applicant withdrew this application before Powys decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Powys
-
P/26/0921/LBC Awaiting decision
Platform 2, Newtown Railway Station, Newtown, SY16 1BP
Listed building consent for the installation of a wall-mounted digital display screen
-
P/26/0880/LBC Awaiting decision
MIN Y NANT, LLAWR-Y-GLYN, CAERSWS, SY17 5RH
Installation of a stairlift together with shower room adaptations
-
P/26/0876/LBC Awaiting decision
Parc Gwyn, Glasbury, Hereford, Powys, HR3 5LL
To dismantle and reconstruct chimney stack to address water ingress (external demolition in conservation area)
-
25/0010/LBC Granted
Poste House 32 High Street Presteigne Powys LD8 2BE
Internal and external works to include, replacement windows and external ramp and steps (part-regularisation of works)
-
P/26/0077/LBC Granted
THE HAIM, LLANDRINIO, LLANYMYNECH, SY22 6SQ
Re-routing of an existing surface water drainage run to a new soakaway, together with the stitching and repair of an existing crack in the wall