Skip to content
PlanIndex Get alerts
Menu

Planning application

The Vine Arddleen Llanymynech Powys SY22 6RU

Granted Powys 21/2343/FUL Full planning permission

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Formation of hardcore over storage area (retrospective) together with erection of a 2.4 metre high security perimeter fence with gates and the construction of 8No. bollard lights at a maximum height of 800mm and improvements to existing access.

As published by the council, reference 21/2343/FUL

Application record

Reference
21/2343/FUL
Type
Full planning permission
Status
Decision Made
Decision
Approve
Received
22 Dec 2021
Validated
13 Jan 2022
Decided
17 May 2023
Ward
Llandrinio ED
Parish
Llandrinio And Arddleen Community
Decision by
Planning Committee
Postcode
SY22 6RU

Site history

Applications at this address on the Powys register

This site has had 2 applications since 2009: 1 approved, 0 refused.

  • P/2009/0686 Withdrawn

    The Vine Arddleen Llanymynech Powys SY22 6RU

    Change of use of agricultural land for storage of touring caravans and associated landscaping

    Decided 11 Aug 2009 Full applications

Timeline

Dates from the published record

  1. 22 Dec 2021

    Received by Powys

  2. 13 Jan 2022

    Validated

    Checked as complete and ready for consideration.

  3. 17 May 2023

    Decision issued: Approve

  4. 18 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Gwynfor Humphreys & Co Agent

261 applications on PlanIndex · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Powys granted permission on 17 May 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Powys

  • 26/0359/FUL Granted

    Holly Bank, Guilsfield, Welshpool, Powys, SY21 9JA

    Erection of a slurry tower and associated works

    23 Mar 2026 Full applications
  • P/26/0610/FUL Granted

    TREBOETH, BLEDDFA, KNIGHTON, LD7 1PA

    Erection of an agricultural building and associated works - grid ref 320776 269918

    22 Jun 2026 Full applications
  • P/26/0176/FUL Granted

    TALL BIRCHES, NEWCHURCH, KINGTON, HEREFORD, HR3 6JJ

    Change of use from existing agricultural farm track and access to a track and access in mixed residential and agricultural use, together with retention of the granular hard surfacing of a section of access trackway connecting the previously approved and constructed track to the field boundary, along with the carrying out of improvements to that part of the driveway that connects the applicants driveway and land parcel to the metalled edge of the adjoining BOAT

    15 Apr 2026 Full applications
  • P/26/0405/FUL Granted

    COMMUNICATION MAST, LLANBISTER, LLANDRINDOD WELLS, LLANDRINDOD WELLS, LD1 6TH

    The proposed upgrade of an existing base station comprising the removal of a 15m monopole and installation of a 20m lattice mast, supporting 3 no antennas and 1 no 600mm dish together with ancillary development thereto.

    9 Jun 2026 Full applications
  • P/26/0003/FUL Granted

    TY CERRIG, MEIFOD, SY22 6YG

    Erection of a covered manure store

    20 Apr 2026 Full applications