Applications in SE1
Newest first · page 57 of 69
-
21/AP/3331 Granted
Pedestrian Link Between The Churchyard And 151-157 Tower Bridge Road London SE1 3JE
Details of Condition 4 - full details of all proposed tree planting to replace the stem girth of those removed as a result of works required by planning permission dated 10/06/2020 [LBS Ref 19/AP/1957] for 'Creation of a new pedestrian link between the churchyard and the site at 151-157 Tower Bridge Road and partial demolition of the western end of the Grade II listed northern boundary wall within the St Mary Magdalen Churchyard'.
-
21/AP/3341 Decided
South Bank University 103 Borough Road London Southwark SE1 0AA
Non-material amendment to planning permission 18/AP/3616 [Approval date: 28.10.2019] for "Redevelopment of the London Road Building incorporating the Academy of Sport to provide refurbished and extended learning and teaching facilities, involving: - alterations to all facades; - addition of rooftop plant and other roof-level features; - rearrangement and increase of internal floorspace, made possible by the infilling of the existing voids on the uppermost floor of the building, including the relocation of the LSBU library into the London Road Building and the provision of a basement-level cycle store; - addition of a loading bay and bin store on Keyworth Street; and - hard and soft landscaping of the external areas".The non-material amendment consists of the omission of the consented loading bay on the west side of Keyworth Street, the omission of the existing traffic island on Keyworth Street, and changes to the consented footway arrangement along the west side Keyworth Street including the location of some consented short-stay cycle parking.
-
21/AP/3342 Granted
South Bank University 103 Borough Road London Southwark SE1 0AA
Details of Condition 7 'Hard and Soft Landscaping' as required by LBS application 18/AP/3616 [Approval date: 28/10/2019] for:"Redevelopment of the London Road Building incorporating the Academy of Sport to provide refurbished and extended learning and teaching facilities, involving: - alterations to all facades; - addition of rooftop plant and other roof-level features; - rearrangement and increase of internal floorspace, made possible by the infilling of the existing voids on the uppermost floor of the building, including the relocation of the LSBU library into the London Road Building and the provision of a basement-level cycle store; - addition of a loading bay and bin store on Keyworth Street, and; - hard and soft landscaping of the external areas"
-
21/AP/3337 Granted
272 St Jamess Road London Southwark
Details of Condition 38 - Secure by Design Certificate as required by LBS application 18/AP/0156 granted 02/03/2020 (Demolition of existing building and erection of a student accommodation building of up to nine storeys to comprise 250 student rooms and associated communal facilities).
-
21/AP/3323 Granted
1 Maltings Place 169 Tower Bridge Road London Southwark SE1 3JB
Exterior door replacement, change of internal ground floor door system to the building atrium and draught lobbying to the north and south atrium entrances
-
21/AP/3324 Granted
33 Alma Grove London Southwark SE1 5PY
Construction of a ground floor side and rear extension; and a first floor rear extension.
-
21/AP/3296 Granted
77-89 Alscot Road London Southwark SE1 3AW
Details of condition 18 'Refuse & Storage Collection' as required by planning permission 18/AP/2295 dated 15/10/2020 for (Redevelopment of site to provide student housing in a building ranging from 3- to 7-storeys (plus basement) and ancillary bin store, cycle store, laundry and office/reception, car parking, substation, associated landscaping, and alterations to the vehicle access. Removal of a street tree on Alscot Road and works to the highway).
-
21/AP/3291 Granted
London Family Tower 189 Tower Bridge Road London Southwark SE1 2UP
Proposed installation of a Euronet NCR Self Serv 26 ATM through the glazed window, to the right of the entrance doors as a through glass installation.
-
21/AP/3287 Granted
Land At Six Bridges Industrial Estate Marlborough Grove London Southwark SE1 5JT
Proposed additions to Existing Base Station installation.
-
21/AP/3340 Decided
133 Park Street And 105 Sumner Street London SE1 9EA And SE1 9HZ Southwark
Discharge of Schedule 3, Clause 7.1 'Travel Plan' of the Section 106 Agreement attached to planning permission 19/AP/5664 [Approval date: 18.08.2020], which itself is the most recent variation of original planning permission 16/AP/4569 [Approval date: 20.10.2017], for:"Minor material amendment to planning permission 16/AP/4569 for the demolition of existing buildings and redevelopment to provide two Class B1 office buildings of nine storeys and ten storeys plus plant. The development will include the creation of a new basement; new public realm; provision of a retail (Class A1/A3/A5) kiosk; hard and soft landscaping and other associated works. The proposed amendments include: - Reduction in the size of the basement; - Consolidation of basement to Block A; - Relocation of plant; - Provision of a cycle ramp; - Minor amendments to the massing of Block A and B; - Minor re-positioning of Block B; - Facade and design amendments to both Block A and B; - Increase of above ground floorspace of 1,130sqm (GIA)"
-
21/AP/3292 Granted
189 Tower Bridge Road London Southwark SE1 2UP
Internally illuminated ATM fascia sign.
-
21/AP/3271 Granted
136-142 New Kent Road London Southwark
Details of Condition 34 (Fire Statement), as required by planning permission 19/AP/7564 dated 02/09/2021 (Minor-material changes to planning permission 17/AP/3910 for: "Demolition of the existing building and construction of a part 13 storey/part 9 storey block fronting onto New Kent Road and a part 6 storey/part 4-storey block fronting onto Munton Road, to provide a mixed-use development, with basement, providing 81 residential units, 1361sqm of flexible business floor space/non-residential institution (Use Class B1/D1) and 448sqm of retail floor space (Use Class A1) with associated cycle parking, servicing, refuse and recycling, landscaping and private and communal residential amenity space").
-
21/AP/3343 Decided
Rich Industrial Estate Crimscott Street London SE1 5TE And Willow Walk London SE1
Discharge of Schedule 3, Paragraph 2.5 (Shared Ownership Wheelchair Adaptable Units) of the S106 Agreement relating to planning permission 15/AP/2474 (Demolition of four existing buildings and electricity substation and the development of a phased mixed-use scheme ranging from 3-9 storeys plus basements (maximum height 34.03m AOD) comprising a series of new buildings and retained/refurbished/extended buildings to provide a total of 19,468sqm (GIA) of commercial, retail, art gallery and storage floorspace (Use Classes A1, A2, A3, B1, B8 and D1) and 406 residential units (Use Class C3) plus associated highway and public realm works, landscaping, car and cycle parking, infrastructure works and associated works.)
-
21/AP/3279 Granted
Tower Wing Guys Hospital Great Maze Pond London Southwark SE1 9RT
Construction of a roof top plant platform and associated plant facilities, including the installation of 1x air handling unit and 1x GRP unit on the roof of Boiler House and 2x condenser units on the existing first floor gantry between Tower Wing and Southwark Wing, to support a new surgical admissions lounge.
-
21/AP/3263 Awaiting decision
87 Newington Causeway London Southwark SE1 6BD
Discharge of planning obligation Schedule 7 Paragrah 1.3 of the Section 106 Agreement - Public Realm 'as built' specification for planning permission 16/AP/3144 Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street
-
21/AP/3268 Awaiting decision
87 Newington Causeway London Southwark SE1 8DR
Discharge of planning obligation Schedule 8, para. 1.5 of the Section 106 - Final Construction Industry Employment and Training Report for planning permission ref. 16/AP/3144 (Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street).
-
21/AP/3267 Awaiting decision
87 Newington Causeway London Southwark SE1 8DR
Discharge of planning obligation Schedule 8, Para. 1.1 Skills and Employment Methodology for planning permission 16/AP/3144 Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street
-
21/AP/3264 Awaiting decision
87 Newington Causeway London Southwark SE1 8DR
Discharge of planning obligation Schedule 7, Paragraph 1-3 Public Realm specification (external Lighting and Security) for planning permission 16/AP/3144 Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street
-
21/AP/3246 Awaiting decision
2-10 Ossory Road London Southwark
Demolition of the existing building and construction of a part one, part ten and part eleven storey building comprising up to 421sqm of Class E floorspace at ground floor and up to 117 homes (Class C3). Provision of ancillary plant, amenity spaces, cycles and refuse stores.This application represents a departure from strategic policy 10 'Jobs and Businesses' of the Core Strategy (2011) and Saved Policy 1.2 'Strategic and Local Preferred Industrial Locations' of the Southwark Plan (2007) by virtue of proposing to introduce residential accommodation in a preferred industrial location.
-
21/AP/3415 Awaiting decision
1 Bank End (Site Including Railway Arches And Thames House Bounded By Stoney Street Clink Street And Park Street) SE1
Variation to the requirement in paragraph 4.2 and the definition of term 'Cultural Space' within the section 106 agreement relating to planning permission ref. 19/AP/1649 (itself a variation of condition 2 (approved plans) of planning permission 15/AP/3066 for 'Redevelopment of 1 Bank End, including reuse of railway arches and rebuilding and extension of the rear of Thames House, Park Street (behind retained facade); remodelling of Wine Wharf building on Stoney Street and development of a two storey building at 16 Park Street, all to provide a development reaching a maximum height of 6 storeys (maximum building height 27.419m AOD) comprising retail units (flexible class A1 shops, A3 cafes/restaurants and A4 drinking establishments use) at ground and first floor levels, a gallery (Class D1 use) at ground floor level, office floorspace (Class B1 use) at ground up to fifth floor level, a cinema (Class D2 use) at ground floor and basement level, associated cycle parking spaces at basement, associated refuse and recycling with new public access routes and public open space').The proposed variations seek to amend the provisions relating to the timing of the delivery of the cultural space to allow a proportion of the retail units to be occupied prior to the cultural space(s) being brought into use.
-
21/AP/3236 Granted
Unit 4A 24-28 Wilds Rents London Southwark
Change of use to an art painting studio Class E (g), together with 4no externally-mounted condenser units within louvred enclosure on western facade of property and alterations to roofing materials.
-
21/AP/3315 Awaiting decision
87 Newington Causeway London Southwark SE1 6BD
Discharge of Schedule 7, Paragraph 1. 6 (External Works) of the section 106 agreement relating to planning permission ref. 16/AP/3144 (Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty-three floors to accommodate a 140 room hotel (levels 1-11), 48 residential units (levels 12-24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street).
-
21/AP/3226 Granted
169 Borough High Street London Southwark SE1 1HR
The display of two non illuminated fascia signs.
-
21/AP/3215 Awaiting decision
136-142 New Kent Road London Southwark
Details of Condition 6 (Surface Water Drainage), as required by planning permission 19/AP/7564 (Minor-material changes to planning permission 17/AP/3910 [Approved: 19.12.2018] for: "Demolition of the existing building and construction of a part 13 storey/part 9 storey block fronting onto New Kent Road and a part 6 storey/part 4-storey block fronting onto Munton Road, to provide a mixed-use development, with basement, providing 81 residential units, 1361sqm of flexible business floor space/non-residential institution (Use Class B1/D1) and 448sqm of retail floor space (Use Class A1) with associated cycle parking, servicing, refuse and recycling, landscaping and private and communal residential amenity space"
-
21/AP/3232 Granted
Land Corner Of Old Kent Road And St James Road London Southwark
Details of Condition 7 - Arboricultural Method Statement required by planning permission dated 05/07/2021 [LBS Ref 21/AP/1918] for 'Non material amendment to condition 7 of planning permission 20/AP/0188 dated 4th March 2021 for 'Construction of two joined two storey buildings arranged in an L-shape following the street layout on the junction of Old Kent Road with St. James's Road. The use class will include B1, D1,D2 with ancillary use classes A1, A3, A4, A5'. The amendment is for an Arboricultural Method Statement showing trees T7 (Sycamore) and T9 (Tree of Heaven, invasive species) may be removed subject to mitigation planting within condition 8. Trees T1-T6 (Sycamore) on Old Kent Road and T8 (Cherry) on the site will be retained and protected during construction'.
-
21/AP/3216 Granted
Rose Court 2 Southwark Bridge Road London Southwark SE1 9HS
Details of Condition 18b Enhancing Archaeological Significance as required by planning permission 18AP3216 dated 23/03/2019 for refurbishment and extension of existing office building (Use Class B1) to provide a roof extension at levels 10 and 11, five floor extension to the front elevation at levels two to six, nine floor extension to the rear elevation at levels two to nine, terraces, new facades and associated works
-
21/AP/3214 Granted
136-142 New Kent Road London Southwark
Details of Condition 3 (Archaeological Evaluation), as required by planning permission 19/AP/7564 (Minor-material changes to planning permission 17/AP/3910 [Approved: 19.12.2018] for: "Demolition of the existing building and construction of a part 13 storey/part 9 storey block fronting onto New Kent Road and a part 6 storey/part 4-storey block fronting onto Munton Road, to provide a mixed-use development, with basement, providing 81 residential units, 1361sqm of flexible business floor space/non-residential institution (Use Class B1/D1) and 448sqm of retail floor space (Use Class A1) with associated cycle parking, servicing, refuse and recycling, landscaping and private and communal residential amenity space"
-
21/AP/3204 Granted
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Details of Condition 32 (Circular Economy Statement - East Site), as required by planning permission 21/AP/1104 (Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.)
-
21/AP/3208 Granted
Flat 4 River Court Upper Ground London Southwark SE1 9PE
Replacement of existing single glazed window with double glazed aluminium windows and lowering of the balcony floor.
-
21/AP/3311 Decided
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Discharge of Schedule 2, Part 9, Paragraphs 1.1-1.4 (Energy Strategy) (East Site), as required by planning permission 21/AP/1104 (Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.)
-
21/AP/3192 Granted
272 St Jamess Road London Southwark
Details of Condition 33 (Bird Boxes), as required by planning permission 18/AP/0156 (Demolition of existing building and erection of a student accommodation building of up to nine storeys (maximum height 30.815m AOD, 29.525m from ground), to comprise 250 student rooms and associated communal facilities, 73 sqm cafe/retail space (A1/A3 use class), hard and soft landscaping, 2 disabled parking spaces and cycle parking.)
-
21/AP/3187 Granted
135 Park Street London SE1 9EA And 4-8 Emerson Street London SE1
Details of Condition 6 'Archaeology Public Engagement Programme' as required by planning permission 19/AP/0240 [dated 27/08/2020] for redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works.
-
21/AP/3185 Granted
Fielden House 28 - 42 London Bridge Street London Southwark SE1 9SG
Details of Condition 24 (Secured by Design), as required by planning permission 20/AP/1473 (Minor material amendment to Planning consent 18/AP/3540 (which was an amendment to 17/AP/4008 and 14/AP/1302). The proposed amendments include: - amendments internally and externally to the retail accommodation and location/number of the short stay cycle spaces at the lower levels; - increase in the size of the mezzanine within the ground floor retail unit by 56 sq metres; - split in the retail units to provide two separate units; - removal of lift between the Level 2 and associated mezzanine; - provision of a new dedicated lift to access the mezzanine cycle store; - relocation of vehicle mitigation bollards on St Thomas Street and London Bridge Street to bring them within property title boundary; - minor amendments to the flank window of Mary Sheridan House, located to the west of the site beneath the new public stairs; - minor changes to the position of partitions within the amenity area on level 4; and, - amendments to the canopies and increase in planters at roof level (level 27).)
-
21/AP/3180 Granted
Rooftop Friars House 157-168 Blackfriars Road London Southwark
Prior approval notification for the upgrade of existing rooftop telecommunications equipment
-
21/AP/3174 Refused
Ground Floor 25 Short Street London Southwark SE1 8LJ
Removal of existing projecting signage and installation of a new double sided externally illuminated PVC projecting banner tied to CHS supports fixed to existing masonry wall with steel plates and resin anchors.
-
21/AP/3171 Granted
Lavington House 25 Lavington Street London Southwark SE1 0NZ
Details of Condition 5 Report of Archaeological Excavation Fieldwork as required by planning permission 20AP1009 dated 10/06/2021 for Redevelopment of the site including partial demolition of existing buildings and erection of two buildings including basement and above ground development of 10 and 15 storeys (in addition to plant) to provide office use (Class B1), retail use (Class A1), flexible retail and leisure (A1/A3, A3/A4, D2/A3/A4), landscaping, public realm, highway works, disabled car parking, cycle parking, plant and associated works.
-
21/AP/3184 Granted
21 Hoptons Gardens Hopton Street London Southwark SE1 9JJ
Re-roofing works: Removal of existing plain clay tile roof covering and replacement with either second hand salvaged or new plain clay tiles to match existing; replacement of any damaged ridge or hip tiles and renewal of leadwork.
-
21/AP/3153 Withdrawn
Patrick Court 92 Webber Street London Southwark
Replace combustible materials on the existing building's external walls with new non-combustible material to match the existing material and colours.
-
21/AP/3151 Granted
272 St Jamess Road London Southwark
Details of Condition 24 - Internal Noise as required by LBS application 18/AP/0156 granted 02/03/2020 (Demolition of existing building and erection of a student accommodation building of up to nine storeys to comprise 250 student rooms and associated communal facilities).
-
21/AP/3142 Granted
133 Park Street And 105 Sumner Street London SE1 9EA And SE1 9HZ Southwark
Full discharge of Condition 22 'External Lighting Scheme' as required by planning permission 19/AP/5664 [Approval date: 18.08.2020], which itself is the most recent variation of original planning permission 16/AP/4569 [Approval date: 20.10.2017], for:"Minor material amendment to planning permission 16/AP/4569 for the demolition of existing buildings and redevelopment to provide two Class B1 office buildings of nine storeys and ten storeys plus plant. The development will include the creation of a new basement; new public realm; provision of a retail (Class A1/A3/A5) kiosk; hard and soft landscaping and other associated works. The proposed amendments include: - Reduction in the size of the basement; - Consolidation of basement to Block A; - Relocation of plant; - Provision of a cycle ramp; - Minor amendments to the massing of Block A and B; - Minor re-positioning of Block B; - Facade and design amendments to both Block A and B; - Increase of above ground floorspace of 1,130sqm (GIA)"
-
21/AP/3150 Granted
Zeno House 19 Long Walk London Southwark
Prior approval notification for the construction of two additional storeys with the creation of two additional studio dwellings (Resubmission of 21/AP/1170)
-
21/AP/3127 Withdrawn
Flat 1 Vanilla And Sesame Court Curlew Street London Southwark SE1 2NN
Removal of all combustible materials contained in the external elements of the 7th floor and design. Supply and installation of an insulated external cladding system and panel dividers that match the appearance of the existing and meets European Classification
-
21/AP/3131 Awaiting decision
Clove Building 4 Maguire Street London Southwark
Construction of sixth floor and part-seventh floor extension providing office floor space (Use Class E), with landscaping, green roof and plant room at roof level including installation of sixth floor roof terrace and fifth floor infill extension with basement cycle parking, refuse storage and other associated works.
-
21/AP/3124 Granted
Flat 39 River Court Upper Ground London Southwark SE1 9PE
Replacement of the existing aluminium windows with double glazed grey aluminium units.
-
21/AP/3123 Granted
Conran Building 22 Shad Thames London Southwark SE1 2YU
Installation of a new glazed double entrance door to the western elevation of the existing building
-
21/AP/3122 Granted
Conran Building 22 Shad Thames London Southwark SE1 2YU
Installation of a new glazed double entrance door to the western elevation of the existing building (Associated LBC: 21/AP/3123)
-
21/AP/3121 Granted
Garages Cresey Estate Leroy Street London Southwark
Demolition of 20 garages, electrical intake cupboard and removal of eight parking spaces. Construction of 15 new social rented tenure homes as a mix of flats, maisonettes and houses; providing 4 x 1 bed, 7 x 2 bed and 4 x 3 bed dwellings.
-
21/AP/3097 Granted
Garages Between Astley House And Lackland House Rowcross Street London SE1 5HU
Construction of nine storey residential building providing 20 apartments (six x 1 bedroom flats, eight x 2 bedroom flats, four x 3 bedroom flats, one x 4 bedroom flat, one x 5 bedroom maisonette) with private amenity, cycle parking, refuse storage, associated landscaping including childrens play area, green roof and installation of PV panels.
-
21/AP/3101 Granted
B11 Lloyds Wharf 5-7 Mill Street London Southwark SE1 2BD
Replacement of 2no windows with modern timber-aluminium composite triple-glazed windows. In keeping with the original windows the replacements would be have white frames and white-frosted privacy-glass.
-
21/AP/3117 Awaiting decision
Conran Building 22 Shad Thames London Southwark SE1 2YU
Listed Building Consent for internal alterations to the building, including the replacement of partitions and doors, new floor finishes, partial infill of atrium, upgrading of services and lighting and other associated works