Postcode district
Planning applications in SE1
Page 50 of 69, newest first. Back to the SE1 overview.
Applications in SE1
Newest first · page 50 of 69
-
22/AP/0907 Granted
69 St Georges Road London Southwark SE1 6ER
Tree works: mature Maple tree in front garden - reduce crown by 33% and remove Ivy.
-
22/AP/0893 Decided
17 Bartholomew Street London Southwark SE1 4AJ
Non material amendment to planning permission ref.21/AP/2679 dated 22/09/2021 for (Minor material amendment to planning permission ref. 21/AP/0257 (Demolition of existing pergola and construction of an outbuilding for ancillary residential use and pergola). The amendment seeks to make further minor changes to the fenestration on the front elevation of the outbuilding to reduce the area of glazing.
-
22/AP/0914 Granted
Former Joseph Lancaster Nursery School Deverell Street London SE1 6AG
Details of Condition 27 (External lighting) as required by planning permission 17/AP/4661 dated 10/01/2019 for redevelopment of the site to provide 40 new affordable dwellings (all social rent) in new buildings up to eight storeys; demolition of nine single storey garages and one single storey storage building and provision of new car parking bays, community garden, landscaping, play space and associated works.
-
22/AP/0910 Granted
Petrol Filling Station 233 - 247 Old Kent Road London Southwark SE1 5LU
Details of Condition 23 (Surface Water Strategy) as required by planning permission dated 10/02/2021 [LBS Ref 20/AP/2792] for 'Variation of Condition 1 (Approved Plans) pursuant to 18/AP/0928 [Demolition of existing buildings and structures and erection of a new part 3, 4 and 5 storey building to provide three retail units (flexible A1/A2 use) at part ground floor and 24 residential units (C3 use) at part ground floor and on the upper floors, including the provision ofsecure cycle parking facilities, bin stores and communal amenity space (revised application). (11 x 2 bed private units 6 x 1 bed, 2 x 7 bed affordable units)] changes include:- Creation of Sprinkler Plant room (10sqm) through reduction ofcommercial floor space at ground floor level from 70.6sqm to 59.1sqm- Installation of x 1 door to rear elevation providing access to bikestorage at ground floor- Installation of x 2 doors to front elevation of electrical room at groundfloor- Removal of third floor private roof terrace of Flat 18- Installation of third floor recessed enclosed glazed balcony to Flat 18and Flat 19 along front elevations- Increase in height of lift overrun at roof level by 0.5m- Replacement of PV panels at roof level with mastic asphalt roofingand;- Associated works including internal reconfigurations of 23 Flats(increased GIA in 19 units, reduced GIA in 4 units)'.
-
22/AP/0906 Granted
Maltby Street Garages Land On St Saviour's Estate 70-72 Maltby Street London Southwark
Details of Condition 3 (CEMP) required by planning permission dated 17/12/2020 [LBS Ref 20/AP/1941] for 'Demolition of existing garages and pram sheds and the redevelopment of a new 5 storey residential building (Class C3) of 24 affordable homes comprising 8 x 1 bed flats, 6 x 2 bed flats, 8 x 3 bed flats/duplex and 2 x 4 bed duplexes. Plus associated landscaping works and 4no blue badge parking spaces'.
-
22/AP/0884 Granted
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London
Details of condition 10 (Archaeological Mitigation) required by planning permission 21/AP/1104 for Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.
-
22/AP/0887 Granted
52 Vogans Mill Wharf Mill Street London Southwark SE1 2BZ
Internal alterations and the removal of a modern lightweight stud partition Removal of lightweight partion.
-
22/AP/0873 Granted
4A Trinity Church Square London Southwark SE1 4HU
Removal of one internal wall
-
22/AP/0889 Granted
17- 21 Risborough Street London Southwark
Details of Condition 4 -Archaeological Watching Brief as required by planning permission 21/AP/1207 dated 18/1/2022 for redevelopment of the site to construct seven storey office building (Class E(g)) with roof terrace, plus basement with ancillary cycle parking, refuse storage, including plant facilities and installation of PV panels and green roof.
-
22/AP/0885 Granted
Petrol Filling Station 233 - 247 Old Kent Road London Southwark SE1 5LU
Details of Condition 12 (Piling Method Statement) as required by planning permission dated 10/02/2021 [LBS Ref 20/AP/2792] for 'Variation of Condition 1 (Approved Plans) pursuant to 18/AP/0928 [Demolition of existing buildings and structures and erection of a new part 3, 4 and 5 storey building to provide three retail units (flexible A1/A2 use) at part ground floor and 24 residential units (C3 use) at part ground floor and on the upper floors, including the provision ofsecure cycle parking facilities, bin stores and communal amenity space (revised application). (11 x 2 bed private units 6 x 1 bed, 2 x 7 bed affordable units)] changes include:- Creation of Sprinkler Plant room (10sqm) through reduction ofcommercial floor space at ground floor level from 70.6sqm to 59.1sqm- Installation of x 1 door to rear elevation providing access to bikestorage at ground floor- Installation of x 2 doors to front elevation of electrical room at groundfloor- Removal of third floor private roof terrace of Flat 18- Installation of third floor recessed enclosed glazed balcony to Flat 18and Flat 19 along front elevations- Increase in height of lift overrun at roof level by 0.5m- Replacement of PV panels at roof level with mastic asphalt roofingand;- Associated works including internal reconfigurations of 23 Flats(increased GIA in 19 units, reduced GIA in 4 units)'.
-
22/AP/0881 Refused
15 Colnbrook Street London Southwark SE1 6EZ
Construction of rear extension on outrigger
-
22/AP/0855 Granted
150-154 Borough High Street London Southwark
Details of condition 10 ARCHAEOLOGICAL EVALUATION as required by planning permission 19/AP/1173 dated 5/6/2020 for construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.
-
22/AP/0854 Granted
150-154 Borough High Street London Southwark
Details of condition 7 Archaeological Foundation Design as required by planning permission 21/AP/0960 dated 21/03/2022 for construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) onthe ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.
-
22/AP/0930 Decided
185 Park Street London Southwark
Discharge of Schedule 7, Clauses 1.1 and 1.2 'Car Club Scheme' of the Section 106 Agreement attached to planning permission 14/AP/3842 [Approval date: 12.02.2016] for:"Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas".
-
22/AP/0856 Granted
Guys Hospital Cancer Centre Great Maze Pond London Southwark SE1 9RT
Installation of three louvre panels at 11th floor to support the refurbishment of the Assisted Conception Unit.
-
22/AP/0863 Granted
185 Park Street London Southwark SE1 9BL
Details of Condition 24 (Signage Strategy) as required by planning permission dated 12/02/2016 [LBS Ref 14/AP/3842] for 'Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas'.
-
22/AP/0860 Granted
25 Gladstone Street London Southwark SE1 6EY
Retrospective listed building consent for extension to existing single storey rear outrigger. Reinstatement of internal non load bearing wall in ground floor reception and construction of wardrobe space in 1st floor bathroom accessed from the 1st floor bedroom via new door opening.
-
22/AP/0852 Granted
150-154 Borough High Street London Southwark
Details of condition 5a & 5b (Land Contamination) required by planning permission 21/AP/0960 Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
-
22/AP/0848 Granted
185 Park Street London Southwark
Details of Condition 28 (Service management plan), as required by planning permission 14/AP/3842 dated 12/02/2016 for Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas.
-
22/AP/0842 Granted
17- 21 Risborough Street London Southwark
Details of Condition 6 (Site Investigation and Contamination) pursuant to 21/AP/1207 [Redevelopment of the site to construct seven storey office building (Class E(g)) with roof terrace, plus basement with ancillary cycle parking, refuse storage, including plant facilities and installation of PV panels and green roof].
-
22/AP/0843 Withdrawn
185 Park Street London Southwark SE1 9BL
Details of Condition 25 (Noise Transfer) as required by planning permission dated 12/02/2016 ref. 14/AP/3842 for 'Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas'.
-
22/AP/0819 Awaiting decision
Blue Eyed Maid 173 Borough High Street London Southwark SE1 1HR
Details of Condition 3 - material samples samplepanels sample-boards of all external facing materials as required by planning permission dated 26/11/2021 [LBS Ref 19/AP/0084] for Retention of public house (Sui Generis use class) at the basement and ground floor, conversion of the upper floors to provide x1 two-bed flat and x2 one-bed flats (Use Class C3) (total: x3 residential units), including a second and third floor rear extension and minor alterations to existing window and door openings to side elevation, and provision of associated refuse facilities'.
-
22/AP/0840 Granted
185 Park Street London Southwark SE1 9BL
Details of Condition 26 (Plant Noise) as required by planning permission dated 12/02/2016 [LBS Ref 14/AP/3842] for 'Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas'.
-
22/AP/0841 Granted
185 Park Street London Southwark SE1 9BL
Details of Condition 27 (Electric Vehicle Charging Points) as required by planning permission ref. 14/AP/3842 dated 12/02/2016 for 'Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas.'
-
22/AP/0820 Granted
Africa House 66 Great Suffolk Street London Southwark SE1 0BL
Details of condition 6 (noise levels from mechanical plant equipment.) required by planning permission 17/AP/1793 Conversion of the basement, ground floor and first floor from Class B1 (Business) use to Class A1/A3/A4 (shop/restaurant and cafe/drinking establishment) use. Conversion of the second floor to multi-purpose cultural centre (Sui Generis) use. Conversion of the third floor from Class B1 (Business) use to multi-purpose cultural centre (Sui Generis) use. Conversion of the fourth floor from Class C3 (Residential) use to multi-purpose cultural centre (Sui Generis) use. External alterations including new rear terrace and balcony, first floor rear extension, new first floor front balcony, new roof plant, alterations to windows in the rear front and side elevations.
-
22/AP/0814 Granted
St Judes Southwark C Of E Primary School Colnbrook Street London Southwark SE1 6HA
Hornbeam (T1): 30% reduction, 2m off height 1.5m off radial spread, leaving 3.5m remaining height 2.5m remaining radial spread, lightly prune and thin removing any dead or diseased tissue.
-
22/AP/0823 Granted
Basement And Ground Floor 31 Union Street London Southwark SE1 1SD
Display of non illuminated fascia sign and internally illuminated projecting sign
-
22/AP/0783 Refused
1A Maidstone Buildings Mews 72-76 Borough High Street London Southwark SE1 1GD
Demolition and rebuild of first floor for Class E (office) use and the construction of a new two storey dwelling (second and third floors) on top with solar panels.
-
22/AP/0811 Granted
Bridge House 4 Borough High Street London Southwark
Details of condition 6 (Plant noise commissioning survey report attached) required by planning permission 18/AP/3294 Re-arrangement of office entrance and servicing at undercroft level, replacement of and extension of office top floor of building, to include plant and roof terrace (revised description)
-
22/AP/0800 Withdrawn
41 Maltby Street & 19 Millstream Road London Southwark SE1 3FF & SE1 3FH
Installation of cladding and fire barrier replacement works
-
22/AP/0802 Granted
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Partial discharge of Condition 8 (parts a and b only) 'Land Contamination' attached to planning permission 20/AP/1537 [dated 06.05.2021] for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
-
22/AP/0755 Granted
Capital House 42 Weston Street London Southwark
Details of Condition 10 - Water supply infrastructure - as as required by planning permission 18/AP/0900 dated 17/12/2020 for redevelopment of the site to include the demolition of Capital House and the erection of a 39-storey building (3 basement levels and ground with mezzanine and 38 storeys) of a maximum height of 137.9m (AOD) to provide up to 905 student accommodation units (Sui Generis use), flexible retail/café/office floorspace (Class A1/A3/B1), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.
-
22/AP/0727 Withdrawn
Ground Floor Fielden House 28 - 42 London Bridge Street London Southwark SE1 9SG
Non-material amendment to Planning consent 20/AP/1473 (which was an amendment to 18/AP/3540, 17/AP/4008 and 14/AP/1302). Minor material amendment to Planning consent 18/AP/3540 (which was an amendment to 17/AP/4008 and 14/AP/1302). The proposed amendments include: - amendments internally and externally to the retail accommodation and location/number of the short stay cycle spaces at the lower levels; - increase in the size of the mezzanine within the ground floor retail unit by 56 sq metres; - split in the retail units to provide two separate units; - removal of lift between the Level 2 and associated mezzanine; - provision of a new dedicated lift to access the mezzanine cycle store; - relocation of vehicle mitigation bollards on St Thomas Street and London Bridge Street to bring them within property title boundary; - minor amendments to the flank window of Mary Sheridan House, located to the west of the site beneath the new public stairs; -minor changes to the position of partitions within the amenity area on level 4; and, - amendments to the canopies and increase in planters atroof level (level 27). The proposed amendment relates to the installation of a permanent gas pedestal on Level 00.
-
22/AP/0721 Withdrawn
Unity Wharf 13 Mill Street London Southwark
Change of use from existing first, second and third 3rd floor Class E use to residential C3 to create 6 residential units and reconfiguration of existing ground floor to provide separate entrances for the Class E and residential areas, as well as secure bin and bike stores.
-
22/AP/0709 Refused
Arch 232 Bank End London Southwark SE1 9FJ
Use of area for external seating including installation of pergola, fixed table around column, fixed banquette and planters and the placing of loose furniture.
-
22/AP/0720 Granted
The George 40 Tower Bridge Road London Southwark SE1 4TR
Retention of of two externally illuminated fascia signs, one externally illuminated projecting sign and one externally illuminated corner sign.
-
22/AP/0671 Withdrawn
58 New Kent Road London Southwark SE1 6JT
Installation of mechanical extract and ventilation to retail restaurant
-
22/AP/0646 Granted
41-45 The Cut London Southwark SE1 8LF
Alterations to shopfront and display of advertisements: externally illuminated fascia sign; internally illuminated projecting sign and internally illuminated menu box.
-
22/AP/0647 Granted
41-45 The Cut London Southwark SE1 8LF
Display of advertisements: externally illuminated fascia sign; internally illuminated projecting sign and internally illuminated menu box.
-
22/AP/1005 Decided
135 Park Street And 4-8 Emerson Street London SE1 9EA
Discharge of Schedule 9, Clause 2.1 'CHP Energy Strategy' of the Section 106 Agreement attached to planning permission 19/AP/0240 [dated 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
-
22/AP/0604 Granted
Railway Arch 24, Adjacent To 49 Southwark Street London Southwark
Construction of arch infill (No. 24), part brick part glazing to enclose the south elevation.
-
22/AP/0575 Granted
Ground Floor 56 Stamford Street London Southwark SE1 9LX
Change of Use from Use Class E (A1) (Hairdresser salon) to Use Class Sui Generis (Tattoo studio) at basement level.
-
22/AP/0565 Granted
4A Dunton Road London Southwark SE1 5TJ
Construction of a dormer extension to front elevation of property.
-
22/AP/0657 Granted
28 Reverdy Road London Southwark SE1 5QE
Replacement of windows to front elevation with timber sash design.
-
22/AP/0509 Granted
135 Park Street And 4-8 Emerson Street London SE1 9EA
Details of Condition 8 'Programme of Archaeological Mitigation Works' attached to planning permission 19/AP/0240 [dated 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
-
22/AP/0508 Decided
135 Park Street And 4-8 Emerson Street London SE1 9EA
Non-material amendment to planning application 19/AP/0240 [dated 27.08.2020] for "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works". The amendment seeks the following:- Amended roof access strategy through introduction of direct lift access, an additional fire escape stair and provision of a lift lobby to the roof- Amended rooftop footprint layout to primarily provide additional plant space to allow for Air Source Heat Pump system- A 0.75m increase in height of the roof enclosure- A 0.95m increase in height to the top of the lift overrun- Revisions to rooftop plant room cladding material from metal louvres to a translucent/back painted glazed finish- Increase in the area of proposed green roof from 90 sqm to 105 sqm - Increase in the area of blue roof capacity from 600 sqm to 650 sqm- Amendments to the cladding through introduction of solid panels at levels 09-11- Amendments to internal core arrangement to amend lift layout and allow for new escape stair to matchroof level layout changes and comply with Fire Regulations- Revision to the structural frame from a steel frame to a concrete frame- A modified basement construction methodology through use of steel sheet piles for the perimeter wall in lieu of concrete secant piles- Amended basement layout to avoid existing underground services and consolidation and rationalisation of the plant to reflect reduced basement size, an increase in shower room and locker provision, relocation of the refuse store and repositioning of western basement perimeter wall
-
22/AP/0518 Granted
140-148 Borough High Street London Southwark SE1 1LB
Details of Condition 3 (Construction Environmental Management Plan), as required by planning permission 21/AP/1825 dated 19/01/2022 for - 'Construction of a single storey roof extension and ground to fourth floor rear extensions to provide additional office space (Use Class E) incorporating external terraces, recladding of front elevation, creation of plant enclosure at roof level and other associated works'.
-
22/AP/0511 Granted
67 St Georges Road London Southwark SE1 6ER
The introduction of new double glazed Crittal doors to the underside of the entrance steps at lower ground floor level and installation of 2no. conservation rooflights to the existing roof.
-
22/AP/0499 Granted
52 St Georges Wharf 6 Shad Thames London Southwark SE1 2YS
Listed building consent for minor alterations to internal layout of the flat.
-
22/AP/0519 Granted
140-148 Borough High Street London Southwark SE1 1LB
Details of Condition 4 (Archaeological Evaluation), as required by planning permission 21/AP/1825 dated 19/01/2022 for - 'Construction of a single storey roof extension and ground to fourth floor rear extensions to provide additional office space (Use Class E) incorporating external terraces, recladding of front elevation, creation of plant enclosure at roof level and other associated works'.