Skip to content
PlanIndex Get alerts
Menu

Postcode district

Planning applications in PA33

Page 2 of 2, newest first. Back to the PA33 overview.

Applications in PA33

Newest first · page 2 of 2

  • 24/01952/PP Granted

    Land West Of Allt Mhoillie B8077 Lochawe Argyll And Bute

    Formation of alternative agricultural access

    Submitted 28 Oct 2024 Full applications
  • 24/01921/PP Withdrawn

    Plot 4 Land South West Of Macaulay's Cottage Kilchrenan Argyll And Bute

    Erection of temporary accommodation/annex building

    Submitted 23 Oct 2024 Full applications
  • 24/01880/NMA Granted

    Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    Non material amendment to planning permission 22/00782/PP (To construct and operate a 132/275 kilovolt (kV) GIS substation and associated infrastructure. The finished platform level for the substation has been reduced from 209.00 m A.O.D. to 208.00 m A.O.D. and the external dimensions of the 2 main substation buildings have been reduced in size.

    Submitted 15 Oct 2024 Amendments
  • 24/01853/FDP Decided

    Eredine Woodland East Lochaweside Argyll And Bute

    Amendment to land management plan

    Submitted 9 Oct 2024 Outline
  • 24/01706/R62HRA Granted

    Falls Of Cruachan Railway Station Lochawe Dalmally Argyll And Bute PA33 1AN

    Long term resilience of soil slope

    Submitted 29 Aug 2024
  • 24/01595/PARAIL Withdrawn

    Falls Of Cruachan Railway Station Lochawe Dalmally Argyll And Bute PA33 1AN

    Long term resilience of soil slope

    Submitted 29 Aug 2024 Prior approval
  • 24/01525/FELLIC Decided

    Ardbrecknish Forest Ardbrecknish Argyll And Bute

    Felling Licence

    Submitted 19 Aug 2024 Outline
  • 24/00260/PP Granted

    Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    Section 42 application for the removal of condition 11 relative to planning permission reference 22/00782/PP (To construct and operate a 132/275 kilovolt (kV) GIS substation and associated infrastructure that will connect the existing 132 kV overhead line (OHL) from Taynuilt to Inveraray to a proposed 275 kV OHL to Dalmally. The works will comprise cut and fill to tie the platform into the existing ground level, landscaping, Sustainable Drainage Systems (SuDS) basins, new permanent access and upgrades to existing tracks)

    Submitted 12 Feb 2024 Full applications
  • 23/02375/PP Withdrawn

    Land North East Of Sonachan Cottages Portsonachan Argyll And Bute

    Erection of 3 dwellinghouses and installation of sewage treatment plants

    Submitted 13 Dec 2023 Full applications
  • 23/00436/CLAWU Granted

    Salmon's Leap Eredine Dalmally Argyll And Bute PA33 1BP

    Certificate of Lawfulness (Existing) for the continued use of jetty

    Submitted 3 Mar 2023 Amendments
  • 23/00324/PNWAY Granted

    Inverliever Forest Dalavich Argyll And Bute

    Formation of forest tracks

    Submitted 20 Feb 2023
  • 23/00325/PNWAY Granted

    Inverliever Forest Dalavich Argyll And Bute

    Formation of forest track

    Submitted 20 Feb 2023
  • 23/00090/LIB Granted

    Cruachan Power Station Lochawe Dalmally Argyll And Bute PA33 1AN

    Alterations to turbine hall (subterranean level) relating to the replacement of Units 3 and 4

    Submitted 24 Jan 2023 Heritage and listed buildings
  • 22/02598/LIB Granted

    Cruachan Power Station Lochawe Dalmally Argyll And Bute PA33 1AN

    Proposed alterations to hydro-electric power station turbine hall including formation of two new access tunnels, connecting the existing turbine hall and access tunnel to the proposed new turbine hall and access tunnel at Cruachan 2

    Submitted 21 Dec 2022 Heritage and listed buildings
  • 21/01750/PNRAIL Decided

    Land At Succoth Forest Dalmally Argyll And Bute

    Replacement of existing culvert beneath the railway, including new headwalls, new handrails, new brick and precast concrete slab cascade, new timber fencing and installation of structure ID plates.

    Submitted 13 Aug 2021
  • 21/01751/PNRAIL Decided

    Land West Of Brackley Dalmally Argyll And Bute PA33 1AX

    Replacement of existing culvert beneath the railway, including new headwalls, new handrails, new brick and precast concrete slab cascade, new timber fencing and installation of structure ID plates.

    Submitted 13 Aug 2021
  • 21/01749/PNRAIL Decided

    Land North Of Succoth Lodge Dalmally Argyll And Bute

    Replacement of existing culvert, including new headwalls, new handrails, new brick and precast concrete slab cascade, new timber fencing and installation structure ID plates

    Submitted 13 Aug 2021
  • 21/01595/FDP Decided

    Land North West Of Dalmally Upper Telecommunications Mast Dalmally Argyll And Bute

    Forest design plan

    Submitted 29 Jul 2021 Outline
  • 21/01594/FDP Decided

    Dychliemore Forest Dalmally Argyll And Bute

    Long term forest plan

    Submitted 27 Jul 2021 Outline
  • 21/01295/PNFOR Granted

    Succoth Forest Dalmally Argyll And Bute

    Formation of forest track

    Submitted 21 Jun 2021
  • 21/00144/LIB Granted

    St Conans Church And Adjacent Parking Area Lochawe Dalmally Argyll And Bute PA33 1AH

    Conversion of redundant tower to accommodate accessible toilets, installation of sewage treatment plant and improvements to parking

    Submitted 27 Jan 2021 Heritage and listed buildings
  • 21/00142/PP Granted

    St Conans Church And Adjacent Parking Area Lochawe Dalmally Argyll And Bute PA33 1AH

    Conversion of redundant tower to accommodate accessible toilets, installation of sewage treatment plant and improvements to parking

    Submitted 27 Jan 2021 Full applications
  • 19/02216/PNFOR Granted

    Land North West Of Kilmaha Inverliever Forest Dalavich Argyll And Bute

    Formation of forest access track

    Submitted 22 Oct 2019
  • 19/02217/PNFOR Granted

    Inverliever Forest Dalavich Argyll And Bute

    Formation of forest track (460m in length)

    Submitted 22 Oct 2019
  • 19/02218/PNFOR Granted

    Inverliever Forest Dalavich Argyll And Bute

    Formation of ATV track (500 metres in length)

    Submitted 22 Oct 2019