21/03842/CND007 Granted
Fair Isle Clinic Fair Isle Road Kirkcaldy Fife KY2 6EE
In compliance with condition 7 for planning application 22/0342/FULL - Before any works start on site, detailed plans showing the location and specification of the new raised pedestrian crossing on Fair Isle Road (located approximately 15- 20 metres South of the centreline of the Lismore Avenue junction) shall be submitted for approval by Fife Council as Planning Authority. Once approved, the raised crossing and ancillary works shall be constructed in accordance with the current Fife Council Making Fife's Places Appendix G and the SCOTS National Roads Guide. These works along with the removal of the existing nib and speed cushions shall be completed and operational, prior to the occupation of the first dwelling.
-
21/03842/CND002 Granted
Fair Isle Clinic Fair Isle Road Kirkcaldy Fife KY2 6EE
Compliance with Condition 2 of Planning Permission 21/03842/FULL - NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. NO BUILDING SHALL BE OCCUPIED UNTIL remedial action at the site has been completed in accordance with the approved Remedial Action Statement. In the event that remedial action is unable to proceed in accordance with the approved Remedial Action Statement - or contamination not previously considered in either the Preliminary Risk Assessment or the Intrusive Investigation Report is identified or encountered on site - all development work on site (save for site investigation work) shall cease immediately and the planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development works shall not recommence until proposed revisions to the Remedial Action Statement have been submitted by the developer to and approved in writing by the planning authority. Remedial action at the site shall thereafter be completed in accordance with the approved revised Remedial Action Statement.
-
20/00972/NMV2 Granted
Victoria Hospital Hayfield Road Kirkcaldy Fife KY2 5AH
Erection of Orthopaedic Elective Care Centre with link bridge connection to existing buildings, including ancillary landscaping and parking (Non material variation for change of RAL for bridge to 20/00972/FULL)
-
20/01002/CND008 Granted
Fair Isle Family Nurture Centre 27 Appin Crescent Kirkcaldy Fife KY2 6EJ
Compliance with Condition 8 of Planning Permission 20/01002/FULL - Prior to the occupation of the nursery, revised plans detailing the design and layout of the proposed raised pedestrian crossing point on Appin Crescent shall be submitted for approval by Fife Council as Planning Authority. Once approved, the raised pedestrian crossing point shall be constructed in accordance with the current Fife Council Transportation Development Guidelines and shall be completed, prior to the nursery opening.
-
20/01002/CND001 Granted
Fair Isle Family Nurture Centre 27 Appin Crescent Kirkcaldy Fife KY2 6EJ
Compliance with Condition 1 of Planning Permission 20/01002/FULL - IN THE EVENT THAT CONTAMINATION NOT PREVIOUSLY IDENTIFIED by the developer prior to the grant of this planning permission is encountered during the development, all development works on site (save for site investigation works) shall cease immediately and the local planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development work on site shall not recommence until either (a) a Remedial Action Statement has been submitted by the developer to and approved in writing by the local planning authority or (b) the local planning authority has confirmed in writing that remedial measures are not required. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. Thereafter remedial action at the site shall be completed in accordance with the approved Remedial Action Statement. Following completion of any measures identified in the approved Remedial Action Statement, a Verification Report shall be submitted to the local planning authority. Unless otherwise agreed in writing with the local planning authority, no part of the site shall be brought into use until such time as the remedial measures for the whole site have been completed in accordance with the approved Remedial Action Statement and a Verification Report in respect of those remedial measures has been submitted by the developer to and approved in writing by the local planning authority.
-
20/01002/CND007 Granted
Fair Isle Family Nurture Centre 27 Appin Crescent Kirkcaldy Fife KY2 6EJ
Compliance with Condition 7 of Planning Permission 20/01002/FULL - Prior to the occupation of the nursery, a new wearing course (surface) shall be constructed over the full width of the Appin Crescent public footway along the total frontage of the application site, in accordance with the current Fife Council Transportation Development Guidelines. These works shall include the provision of a raised ramped vehicular crossing at the car park which gives priority to pedestrians.
-
22/02657/FULL Withdrawn
6 Blair Place Kirkcaldy Fife KY2 5SQ
Retrospective application for erection of pergola and zip wire raised platform and poles to rear of dwellinghouse
-
22/02383/FULL Granted
Windrush Balwearie Windygate Kirkcaldy Fife KY2 5UL
Installation of door and side screens to front and replacement window to side of detached garage to front of dwellinghouse
-
22/02323/FULL Granted
Land For Battery Storage Facility Gleniston Auchtertool Fife
Erection of battery storage facility with associated access, landscaping and earthworks
-
22/01302/PPP Refused
57 Chapel Road Kirkcaldy Fife KY2 6TT
Planning permission in principle for erection of dwellinghouse
-
22/01275/FULL Granted
34 Barnton Road Kirkcaldy Fife KY2 6XJ
Erection of domestic outbuilding and fence (part retrospective)
-
21/00462/CLP Granted
78 Dothan Road Kirkcaldy Fife KY2 6GZ
Certificate of Lawfulness - Proposed for conversion of garage to habitable room and amendment of door to window
-
21/00325/FULL Granted
41 Craigievar Gardens Kirkcaldy Fife KY2 5SD
Single storey extension to side of dwellinghouse
-
21/00282/FULL Granted
20 Ratho Place Kirkcaldy Fife KY2 6XL
Single storey extension to side of dwellinghouse
-
21/00134/FULL Granted
3 Muirfield Street Kirkcaldy Fife KY2 6SY
Single storey extension to side of dwellinghouse incorporating alterations to existing garage roof and replacement roof on existing conservatory
-
20/00882/NMV1 Withdrawn
Victoria Hospital Hayfield Road Kirkcaldy Fife KY2 5AH
Formation of car parks (Non Material Variation for alterations to layout of car parks to 20/00882/FULL)
-
20/03195/CLE Granted
Clandon House Cluny Kirkcaldy Fife KY2 6QS
Certificate of Lawfulness (Existing) for formation of agricultural access road
-
20/03125/ADV Granted
Frankie & Bennys 15 Fife Central Retail Park Chapel Park Kirkcaldy Fife KY2 6QL
Display of various illuminated and non-illuminated signage
-
20/02973/FULL Granted
1 Newbigging Auchtertool Kirkcaldy Fife KY2 5XJ
Single storey extension to front and formation of dormer extensions to rear of dwellinghouse