Postcode district
Planning applications in BT47
Page 14 of 16, newest first. Back to the BT47 overview.
Applications in BT47
Newest first · page 14 of 16
-
LA11/2023/1350/F Granted
Industrial yard East of 57 Clooney Road, L'Derry
Proposed single storey industrial storage building
-
LA11/2023/1353/F Granted
57 Primity Crescent, Newbuildings, L'Derry, BT47 2QZ
Proposed single storey rear extension to existing dwelling
-
LA11/2023/1335/F Granted
4 Spencer Road, Waterside, Derry, BT47 6AA
Retention of change of use from former bank to class C2; Guest house as per the Planning (use classes) Order (NI) 2015
-
LA11/2023/1328/F Awaiting decision
Adjacent to 105 Rossdowney Road, Londonderry, BT47 5SU
Proposed conversion of existing farm buildings into 8 No self storage units.
-
LA11/2023/1337/PAN Granted
Lands to the north and east/southeast of No. 23 Maydown Road, adjacent to Coolkeeragh ESB Power Station, Londonderry, BT47 6UJ
Proposed Battery Energy Storage System (BESS) Facility including electrical substation building, CCTV/lighting columns, security fencing, new access and ancillary site works.
-
LA01/2023/0138/F Granted
Dungiven Sports Centre 32 Curragh Road Dungiven
Alteration to 2 sides of perimeter fencing to 3G pitch only - Height increase from 3m to 6m (amended description)
-
LA01/2023/0161/RM Granted
Lands 20m S of 9 Shore Road Greysteel BT47 3XH
Proposed New Dwelling and Garage
-
LA11/2023/1314/DC Granted
Faughan Valley Woodland Lands 675m north-north-west of 90 Ardground Road Kilaloo Londonderry BT47 3TB
Discharge of Conditions: 2, 3 and 4 of LA11/2020/0296/F relating to a final Construction Method Statement/CEMP and SUDS.
-
LA11/2023/1297/F Granted
27 Rossdowney Park, Clooney, Londonderry, BT47 5NR
Retention of replacement steel structured domestic garage
-
LA11/2023/1308/F Granted
34 Foyle Crescent, Newbuildings, L'Derry, BT47 2QR
Proposed single storey side extension to existing dwelling
-
LA11/2023/1285/NMC Granted
Lands adjacent and to the West of the entrance to St. Columb's Road Waterside Derry BT47 6JY
The front entrance portico design has changed from pitched to flat roof. The rear elevation has had the proportions of the windows revised to be more in keeping with a traditional Gate Lodge design. The chimney redesigned to look more traditional.
-
LA11/2023/1276/F Granted
81 Woodside Heights, Derry, BT47 2LA
Proposed alterations, single storey kitchen extension to rear of existing dwelling
-
LA11/2023/1274/F Granted
2 Emerson Gardens, L'Derry
Single storey side extension to existing dwelling and level access ramp to front
-
LA11/2023/1268/F Granted
Nos. 6, 7, 8, 9, 10, 11, 12, 13, 18, 19, 20 Derryview Terrace, BT47 2 ER Nos. 3, 5, 7, 9 Dunfield Terrace, BT47 2ER Nos. 46, 48, 50, 52, 54, 56, 58, 60, 62, 64, 66, 68, 70, 72 Fountain Hill, BT47 2BU (30 No. dwellings)
Replacement of defective existing mono / hipped roofs to be replaced with new hip pitched / flat roofs to 30 No. N.I.H.E. dwellings
-
LA11/2023/1277/F Granted
23 Curlew Way, L'Derry, BT47 6LQ
Single storey rear extension
-
LA11/2023/1251/PAN Granted
Lands at Temple Road, Lisahally Located east of no. 28 Temple Road, South of building 10 & 11 Haw Road, and North of nos. 32-48. The Old Fort Lisahally Londonderry
Proposed hardstanding yard to provide an external storage area for Foyle Port (with associated works)
-
LA11/2023/1245/A Granted
Our Lady of Fatima Primary School Ervey Road, Tamnaherin, BT47 3AU
Total of 19 No. signs, including 15 post mounted in curtilage signage and 4 wall mounted signs, in aluminium with white reflective black plate and black text/arrows, includes one larger wall mounted powder coated aluminum sign
-
LA11/2023/1236/F Granted
17 Cherryburn Gardens, Londonderry, BT47 5PX
Proposed single storey Rear extension to dwelling
-
LA11/2023/1242/F Granted
7 Ivy Mead Close, Londonderry, BT47 3FL
Proposed attic conversion to existing dwelling
-
LA11/2023/1227/DC Granted
Brackfield Wood, Approx 150m south west of No. 250 Glenshane Road, BT47 3SN
Discharge of Condition: 6 of planning approval LA11/2019/0719/F relating to otters.
-
LA01/2023/0030/NMC Withdrawn
Faughanvale GAC Clooney Road Greysteel
Non Material Change - Proposed Sculpture within Faughanvale G.A.C grounds ref LA01/2021/1032/F
-
LA11/2023/1220/DC Granted
Ebrington Hotel Ebrington Square, Ebrington, Londonderry, BT47 6FA
Discharge of Condition No. 25 of planning permission LA11/2017/0862/F - Relating to roof finish
-
LA11/2023/1219/DC Granted
Ebrington Hotel (Buildings 67-69) Ebrington Square, Ebrington, Londonderry, BT47 6FA
Discharge of Condition No. 26 of planning permission LA11/2017/0862/F - Relating to external render
-
LA11/2023/1302/DC Granted
Lands opposite 52 Lismacarol Road / Glenshane Road, Crossballycormick, Londonderry
Discharge of condition No. 2 of planning permission A/2014/0495/F - Relating to removal of foundations
-
LA11/2023/1221/F Granted
41 Faughan Crescent, Londonderry, BT47 3LA
Proposed first floor rear extension and additional first floor gable window to dwelling
-
LA01/2023/0016/F Granted
21 HARVEST MEADOWS GREYSTEEL BT47 3FB
Proposed single storey flat roof extension to rear of existing dwelling.
-
LA11/2023/1203/DC Granted
40 Dungiven Road Clooney Londonderry BT47 6BW
Dischardge of Condition 5 realting to the CEMP for the Construction of new Youth Centre within the education authority grounds, demolition of the old Youth Centre building approved under LA11/2020/0849/F
-
LA01/2022/1591/F Granted
LANDS DIRECTLY WEST OF 25 ASHFORD PARK FEENY
PROPOSED 2 STOREY DETACHED DWELLING
-
LA11/2023/1198/DC Granted
Lands accessed from Fincairn Road & Glenshane Road directly East of Copperthorpe housing development and c.270 meters North of The Beeches, Drumahoe, Co. Derry
Discharge of condition No. 18 of planning permission LA11/2018/1131/RM - Relating to Archaeological Evaluation Report
-
LA11/2022/1189/F Granted
94 Stevenson Park, L'Derry, BT47 3QU
Single storey rear extension to dwelling
-
LA11/2023/0003/F Granted
Site 35 M. East of No. 9 Greenmount Gardens, Claudy, BT47 4HS
Erection of 4 dwellings, 2no detached and 1no pairs of semi detached dwellings with incurtilage car park spaces with on street car parking spaces (Change of house type from previously approved 2 no detached dwellings under planning approval A/2006/0175/F)
-
LA11/2023/0002/DC Granted
Brackfield Wood Woodland Trust 268 Glenshane Road Londonderry BT47 3SN
Discharge of Condition: 4 of LA11/2021/0175/F Condition 4: No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. These plans should contain all the appropriate environmental mitigation as within the CEMPS by Euro Services Contracts Ltd, dated April 2022 and as advised by NIEA NED in their response 03/10/2022. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.
-
LA11/2023/1177/F Granted
41 Lisaghmore Avenue, Londonderry, BT47 2JJ
First floor wet room extension
-
LA11/2022/1172/DC Granted
Oaks Wood, Woodland Trust, Glenshane Road BT47 3EW
Discharge of Condition: 2 & 3 of LA11/2022/0024/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. This should reflect all the mitigation, and avoidance measures to be employed as outlined in the outline Construction Environment Management Plan (April 2022) and include specific mitigation for the watercourse crossing. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing by the planning authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site. 3. A detailed Construction Method Statement, for works in, near or liable to affect any waterway as defined by the Water (Northern Ireland) Order 1999, must be submitted to NIEA Water Management Unit, at least 8 weeks prior to the commencement of the works or phase of works. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment.
-
LA11/2022/1171/DC Granted
Woodland Trust, Red Brae, Lands 675m NNW of 90 Ardground Road Kilalloo Londonderry BT47 3TB
Discharge of Condition: 2 of LA11/2021/0186/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil; e) Water Quality Monitoring Plan; f) Environmental Emergency Plan; g) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities. h) identify all potential risks to the adjacent watercourses and must incorporate all of the pollution prevention measures included in the Outline Construction Environmental Management Plan stamped 03/05/2022 and all details requested by NIEA NED in their consultation response dated 20/06/2022. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.
-
LA01/2022/1527/O Granted
ON STRAW ROAD ADJACENT AND TO REAR OF 286 DRUMRANE ROAD BURNFOOT DUNGIVEN CO LONDONDERRY
Proposed site for new dwelling (with ridge height maximum 6.8 metres above finished ground floor level) and detached garage
-
LA11/2022/1138/F Granted
20 Prehen Road, Londonderry, BT47 2NS
Proposed change of location for approved 2 storey music room & home studio to rear of dwelling - LA11/2022/0778/F
-
LA11/2022/1144/DC Granted
Brackfield Wood, Approx. 150m South West of No. 250 Glenshane Road, Londonderry, BT47 3SN
Discharge of Conditions: 4 and 5 of LA11/2019/0719/F 4. A Final Construction Environmental Management Plan must be submitted by the appointed contractor to the planning authority prior to work commencing. This shall reflect all the mitigation and avoidance measures detailed in the outline CEMP and the Preliminary Ecological Appraisal. The final CEMP should also confirm: - The timing of piling works to take account of the recommendation of NIEA NED. As timings of piling in relation to salmon run will depend on the location of the site within a catchment and the related salmon peak run timing through that area, this should be confirmed with Loughs Agency; - The type of scour protection and the method of installation to demonstrate that it prevents undercutting from river erosion processes; - a drainage plan to confirm the finalised site drainage and confirm if any SuDS is required. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details, unless otherwise agreed in writing with by the planning authority. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective mitigation ensuring there are no adverse impacts on the integrity of River Faughan and Tributaries SAC. 5. A detailed Construction Method Statement (CMS) must be submitted to NIEA Water Management Unit, at least eight weeks prior to the commencement of construction.The CMS should include all necessary pollution prevention measures to protect the water environment during the development of this proposal. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment. Faughan Valley Red Brae Trails and Timber Footbridge CEMP, October 2022 (CMS contained within)
-
LA11/2022/1137/DC Granted
Faughan Valley Woodland, Lands 675 M. N.N.W. of 90 Ardground Road, Kilaloo, Londonderry
Discharge of condition Nos. 2 and 4 of planning permission LA11/2020/0296/F - Relating to Construction Environmental Management Plan
-
LA11/2022/1153/F Granted
120 metres North of No. 1 Templetown Mews, Maydown, Londonderry, BT47 6GY
Proposed bus shelter
-
LA11/2022/1152/A Granted
120 metres North of No. 1 Templetown Mews, Maydown Londonderry BT47 6GY
Advertisement on side of Bus Shelter
-
LA11/2022/1156/F Granted
36 Alderbrook, Eglinton, BT47 3WG
Retention of single storey timber clad garden shed to provide garden storage and kids' playroom
-
LA11/2022/1142/PAN Granted
54, 56 & 58 Main Street & 645 Baranailt Road and associated lands to the rear, and lands to the rear of 637-645 Baranailt Road, Claudy Londonderry BT47 4HR
Replacement supermarket and offices, parking and fuel pump.
-
LA11/2022/1148/F Granted
14 Prehen Road, Derry, BT47 2NS
Single storey side extension, proposed glazed canopy & patio to existing single storey dwelling. All existing windows & doors to be replaced
-
LA01/2022/1499/RM Granted
18A - 21 BEECH ROAD DUNGIVEN LONDONDERRY BT47 4QB
TWO DETACHED HOUSES WITH DETACHED GARAGES ON A GAP SITE.
-
LA11/2022/1157/PAN Granted
Vacant lands on the former Ebrington Barracks site, located immediately East of building 80/81 and approx. 30 M. South East of Browning Drive, approx. 55 M. North of Ebrington Terrace and approx. 120 M. East of Ebrington Square, Limavady Road, Derry/Londonderry, BT47 6HN. Buildings 117/118 (and lands to the East) Limavady Road, Derry/Londonderry, BT47 6HN
Public Consultation at Parcel “D” and “Part Parcel E” Former Ebrington Barracks Proposed development of Parcel D (Outlined Red on Plan) of former Ebrington Barracks site comprising 4 multi storey buildings including:- • Building D1 - Grade A Commercial Office building to 3 upper floors over Mixed Use (Cafe / Restaurant & own door Offices) at ground floor (Gross Internal Area ((GIA)) c.5,500m2). • Building D2 - Basement/Multi-Storey Car Park (MSCP) [2a] with wrap around Creative / Commercial Uses [2b & 2c]:- D2a - MSCP: 1 full basement level with 3 levels above ground (c.435 car parking spaces); D2b - Studios: Small 'own door' Creative Units. Approximately 100m2 over ground floor and mezzanine levels (GIA c.650m2) ; D2c - Single Commercial Unit. Approximately 330m2 over 2 storeys (GIA c.650m2). • Building D3 - Mixed Use block: Creative / Commercial & Ancillary uses at ground floor with 2 storeys of Residential use above (10 dwellings per floor. GIA c.2,800m2). • Building D4 - Mixed Use block: Creative / Commercial & Ancillary uses at ground floor with 2 storeys of Residential use above (6 dwellings per floor. GIA c.2,000m2). Also providing new public square, public realm works and associated site, access and landscaping works. Updates to Ebrington Development Framework Masterplan outlining indicative proposals for part Parcel E of former Ebrington Barracks site comprising 3 multi storey buildings E1, E2 & E3 providing Creative Industries / Serviced Office Space over 3 blocks (GIA c.5,000m2). Public Consultation for Parcel “F” and part Parcel “E” Former Ebrington Barracks Public Consultation for Parcel F and part Parcel E (Outlined Green on Plan) of former Ebrington Barracks site to provide 4 multi storey buildings for Residential Use and a Mixed Use development as follows: • Building F1/117 - Residential Block (as per Planning Permission LA11/2020/0010/F & LBC LA11/2020/0034/LBC); • Buildings F2 & F3 - Residential Blocks (4/5 storeys in height); and • Building E4 - Creative Industries / Serviced Office Space (GIA c.1,200m2 over 2 storeys). Ancillary site works (including demolition of Building 118) and landscaping and car parking.
-
LA11/2022/1123/F Granted
31 Cambourne Park, Derry, BT47 5PH
Single storey ground floor rear extension
-
LA11/2022/1101/F Granted
149 The Old Fort Strathfoyle Derry BT47 6SS
Side and rear ground floor extension
-
LA01/2022/1452/O Granted
50m SW of 78 Coolagh Road Greysteel BT47 3EJ
Off site replacement dwelling and garage
-
LA11/2022/1078/LBC Granted
12 - 14 Bonds Hill Londonderry BT47 6DU
Replacement of existing UPvC secondary glazing. Repair of existing timber single glazed sliding sash windows. External redecoration to match existing. Repair to timber external doors, columns, heads and surrounds. Clean down roof covering, replace slipped / broken tiles & redress lead flashing. Replacement of aluminium rain water goods throughout. Replacement of soffit / fascia / barge boards to match existing