Planning application
St Marys Hospital Milton Road Portsmouth PO3 6AD
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Application to determine if prior approval is required (Schedule 2, Part 14, Class J) for the installation of solar panels to various roofs.
As published by the council, reference 25/01352/PA
Application record
- Reference
- 25/01352/PA
- Type
- Prior Approval
- Status
- Withdrawn
- Decision
- Application Withdrawn
- Received
- 19 Nov 2025
- Validated
- 18 Dec 2025
- Decided
- 30 Jan 2026
- Ward
- Milton
- Decision by
- Delegated
- Postcode
- PO3 6AD
Site history
Applications at this address on the Portsmouth register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
26/00105/FUL Granted
St Marys Hospital Milton Road Portsmouth PO3 6AD
Installation of Solar Panels arrays across the roofs of Blocks B, C, D, E, F (east) and electrical switchroom of St Mary's Community Health Campus
Timeline
Dates from the published record
-
19 Nov 2025
Received by Portsmouth
-
18 Dec 2025
Validated
Checked as complete and ready for consideration.
-
30 Jan 2026
Decision issued: Application Withdrawn
-
25 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
ZLC Energy Agent, registered in Liskeard
Active · incorporated 2012 · Liskeard
5 applications on PlanIndex · across 4 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Portsmouth decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
St Marys Hospital Milton Road Portsmouth PO3 6AD
Installation of Solar Panels arrays across the roofs of Blocks B, C, D, E, F (east) and electrical switchroom of St Mary's Community Health Campus
Granted Full applications 5 docs -
The Lodge 197 Milton Road Portsmouth PO4 8RS
Application to determine if prior approval is required for the demolition of Milton Lodge and attached office building
Granted Other Demolition 4 docs -
St Marys House St Marys Road Portsmouth
Part repair, part replacement of the roof, replacement of velux windows and associated works
Granted Heritage and listed buildings Loft or dormer Roofing +1 20 docs -
St Marys House St Marys Road Portsmouth
Part repair, part replacement of the roof, replacement of velux windows and associated works
Granted Full applications Loft or dormer Roofing +1 20 docs -
Small domestic
-
The Rodney Road Centre Rodney Road Southsea PO4 8SY
Application to seek approval of details reserved by condition 4 (Tree Protection) of planning permission 24/00260/FUL
Granted Conditions Trees 10 docs
Other prior approval applications
In Portsmouth
-
26/00237/PACOU Refused
161 - 165 Highland Road Southsea PO4 9EY
Application for prior approval (Schedule 2, Part 3, Class MA) for change of use of existing shop to 2no. flats
-
26/00003/GPDC Granted
135 Kirby Road Portsmouth PO2 0PX
Construction of single storey rear extension, extending 6m beyond the rear wall, with a height of 3m to the eaves and maximum height of 3m
-
26/00500/PN Awaiting decision
20 Fratton Road Portsmouth PO1 5BX
Application for prior approval (Schedule 2, Part 3, Class MA) for change of use of from Class E to 1 no. flat on first floor
-
26/00013/GPDC Awaiting decision
130 Falmouth Road Portsmouth PO6 4JT
Construction of single storey rear extension, extending 4.2m beyond the rear wall, with a height of 2.5m to the eaves and maximum height of 3.5m
-
26/00462/PN Awaiting decision
Holiday Inn Express Portsmouth - North Eastern Road Portsmouth PO6 1UN
Installation of 324 roof-mounted solar PV panels to a total system size of 146 kWp