Skip to content
PlanIndex Get alerts
Menu

Planning application

South Parade Pier South Parade Southsea PO4 0SW

Granted Portsmouth 25/00908/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Raising and resurfacing of the existing promenade adjacent to pier and resurfacing under the pier and canopy (at existing levels), construction of adjacent vertical flood defence walls and associated works and widening of the beach

As published by the council, reference 25/00908/LBC

Application record

Reference
25/00908/LBC
Type
Listed Building Consent
Status
Awaiting decision
Decision
Approve
Received
1 Aug 2025
Validated
6 Aug 2025
Decided
14 Nov 2025
Decision by
Committee Decision
Postcode
PO4 0SW

Site history

Applications at this address on the Portsmouth register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 25/01224/DOC Awaiting decision

    South Parade Pier South Parade Southsea PO4 0SW

    Application to discharge condition 8 (RGB Pixel LED Lighting) of planning permission 21/01077/ADV

    Submitted 20 Oct 2025 Conditions
  • 25/01220/DOC Granted

    South Parade Pier South Parade Southsea PO4 0SW

    Application to discharge condition 3 (RGB Pixel LED Lighting for Pier Signage) of planning permission 21/01052/LBC

    Decided 9 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 1 Aug 2025

    Received by Portsmouth

  2. 6 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 14 Nov 2025

    Decision issued: Approve

  4. 25 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Portsmouth granted permission on 14 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Portsmouth

  • 26/00228/LBC Granted

    West Chapel Kingston Cemetery St Marys Road Portsmouth

    Repairs to disused chapel, including roof slating, artificial lead flashing detailing, flat roofing, reconstruction of unstable flint and brick walls, replacement of defective timbers to roof and floor construction, replacement rainwater goods, repointing, stone repair and replacement, decorations, render, repairs and protection to parquet floor, replacement glass and lead light repairs, replacement window mesh, replacement defective ironmongery, replacement internal door, repairs to existing doors, and sundry other repairs.

    26 Feb 2026 Heritage and listed buildings
  • 26/00476/LBC Awaiting decision

    116 - 118 Commercial Road Portsmouth PO1 1EP

    Replacement of principal entrance door

    14 Apr 2026 Heritage and listed buildings
  • 26/00461/LBC Awaiting decision

    36 Kent Road Southsea PO5 3ES

    The proposal is to remove a dated PVC 1960s extension (circa. 8m2) to the rear of a Grade II listed Victorian building and replace with a timber verandah and door set, creating balcony space and improving the aesthetic from the rear of the property.

    13 Apr 2026 Heritage and listed buildings
  • 25/01272/LBC Refused

    Great Salterns Mansion Eastern Road Portsmouth PO3 6QB

    External alterations including construction of panel sign

    3 Nov 2025 Heritage and listed buildings
  • 25/01306/LBC Granted

    Admiralty House Hm Dockyard Queen Street Portsmouth PO1 3PZ

    Repairs to stone balustrade

    6 Nov 2025 Heritage and listed buildings