Planning application

68 Montgomerie Road Southsea PO5 1ED

Granted Portsmouth 25/00043/GPDC General Permitted Development

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single storey rear extension, extending 6m beyond the rear wall, with a height of 3m to the eaves and maximum height of 3m

As published by the council, reference 25/00043/GPDC

Application record

Reference
25/00043/GPDC
Type
General Permitted Development
Status
Awaiting decision
Decision
DC deemed consent
Received
29 Sep 2025
Validated
29 Sep 2025
Decided
19 Nov 2025
Ward
St Thomas
Postcode
PO5 1ED

Site history

Applications at this address on the Portsmouth register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 25/01506/FUL Awaiting decision

    68 Montgomerie Road Southsea PO5 1ED

    Change of use from house in multiple occupation (Class C4) to 8 person/8 bedroom house in multiple occupation (sui generis)

    Submitted 22 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 29 Sep 2025

    Received by Portsmouth

  2. 19 Nov 2025

    Decision issued: DC deemed consent

  3. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Applecore PDM Ltd Agent, registered in Southampton

Active · incorporated 2020 · Southampton

116 applications on PlanIndex · across 13 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Portsmouth granted permission on 19 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 68 Montgomerie Road Southsea PO5 1ED

    25/01506/FUL Submitted 22 Dec 2025 0m away

    83% historically approved · decision due ~17 Feb

    Change of use from house in multiple occupation (Class C4) to 8 person/8 bedroom house in multiple occupation (sui generis)

    Awaiting decision Full applications 6 docs
  • 36 Montgomerie Road Southsea PO5 1ED

    26/00326/FUL Submitted 17 Mar 2026 80m away

    83% historically approved · decision due ~12 May

    Change of use from house in multiple occupation (Class C4) to 7-bed/7-person house in multiple occupation (Sui Generis) and retention of rear dormer

    Awaiting decision Full applications Loft or dormer 10 docs
  • 128 St Andrews Road Southsea PO5 1EX

    25/01211/FUL Submitted 17 Oct 2025 90m away

    Construction of two storey dwellinghouse on land to rear of No.128 St Andrews Road following removal of existing garage

    Refused Full applications 11 docs
    Domestic
  • 128 St Andrews Road Southsea PO5 1EX

    25/00878/DOC Submitted 28 Jul 2025 95m away

    Application to discharge conditions 3 (Cycle Storage) of planning permission 25/00379/FUL

    Granted Conditions 2 docs
  • 128 St Andrews Road Southsea PO5 1EX

    26/00142/CPE Submitted 6 Feb 2026 97m away

    Application for Certificate of Lawful Development for existing use as house in multiple occupation (Class C4)

    Granted Lawful development 2 docs
  • Basement 79 Victoria Road North Southsea PO5 1PP

    26/00012/FUL Submitted 8 Jan 2026 134m away

    Conversion of basement level to form 1no. self-contained residential flat (Class C3), including installation of new windows to the front elevation either side of the existing external staircase leading to the basement entrance.

    Refused Full applications Windows or glazing 11 docs

In Portsmouth

  • 26/00237/PACOU Refused

    161 - 165 Highland Road Southsea PO4 9EY

    Application for prior approval (Schedule 2, Part 3, Class MA) for change of use of existing shop to 2no. flats

    27 Feb 2026 Prior approval
  • 26/00003/GPDC Granted

    135 Kirby Road Portsmouth PO2 0PX

    Construction of single storey rear extension, extending 6m beyond the rear wall, with a height of 3m to the eaves and maximum height of 3m

    4 Feb 2026 Prior approval
  • 26/00500/PN Awaiting decision

    20 Fratton Road Portsmouth PO1 5BX

    Application for prior approval (Schedule 2, Part 3, Class MA) for change of use of from Class E to 1 no. flat on first floor

    17 Apr 2026 Prior approval
  • 26/00013/GPDC Awaiting decision

    130 Falmouth Road Portsmouth PO6 4JT

    Construction of single storey rear extension, extending 4.2m beyond the rear wall, with a height of 2.5m to the eaves and maximum height of 3.5m

    16 Apr 2026 Prior approval
  • 26/00462/PN Awaiting decision

    Holiday Inn Express Portsmouth - North Eastern Road Portsmouth PO6 1UN

    Installation of 324 roof-mounted solar PV panels to a total system size of 146 kWp

    13 Apr 2026 Prior approval