Skip to content
PlanIndex Get alerts
Menu

Planning application

12 Culdrose Close Plymouth PL5 2BD

Awaiting decision Plymouth 26/01073/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

EV charging point (retrospective)

As published by the council, reference 26/01073/FUL

Application record

Reference
26/01073/FUL
Category
Full applications
Status
Awaiting decision
Received
29 Jul 2026
Validated
14 Aug 2026
Ward
HONICKNOWLE
Postcode
PL5 2BD

Timeline

Dates from the published record

  1. 29 Jul 2026

    Received by Plymouth

  2. 14 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Plymouth took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Plymouth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 40 Budshead Road Plymouth PL5 2RA

    25/01634/FUL Submitted 12 Dec 2025 351m away

    93% historically approved · decision due ~9 Jul

    Hardstanding and dropped kerb

    Decided Full applications
  • Uxbridge Drive Ernesettle Plymouth PL5 2SF

    23/00270/16 Submitted 22 Feb 2023 369m away

    Proposed 5G telecoms installation: H3G 15m street pole and additional equipment cabinets.

    Granted Outline 18 docs
  • 37 Uxbridge Drive Plymouth PL5 2SE

    19/00597/FUL Submitted 15 Apr 2019 370m away

    Construction of new workshop outbuilding with shower room and front porch extension.

    Granted Full applications Extension 11 docs
    Small domestic
  • 9 Biggin Hill Plymouth PL5 2RB

    25/01417/FUL Submitted 27 Oct 2025 399m away

    Creation of off-road parking area and associated works

    Refused Full applications 18 docs
  • 27 Jubilee Road Plymouth PL5 2PQ

    26/00419/FUL Submitted 20 Mar 2026 405m away

    Demolition of an existing rear tenement and construction of a new single storey rear extension.

    Granted Full applications Extension Demolition 22 docs
    Small domestic
  • 15 Jubilee Road Plymouth PL5 2PQ

    20/00588/FUL Submitted 23 Apr 2020 417m away

    Removal of defective detached single garage and construction of new two storey extension to side and rear elevation to form new single garage, utility and enlarged kitchen/diner to Ground floor with formation/redesign of three bedrooms at First Floor with an additional bedroom within roof space with rear dormer and balcony.

    Withdrawn Full applications Extension Loft or dormer 21 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications