Skip to content
PlanIndex Get alerts
Menu

Planning application

36 College Avenue Plymouth PL4 7AN

Awaiting decision Plymouth 26/01027/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Remove existing garage and replacement covered carport

As published by the council, reference 26/01027/FUL

Application record

Reference
26/01027/FUL
Category
Full applications
Status
Awaiting decision
Received
21 Jul 2026
Validated
10 Aug 2026
Ward
COMPTON
Postcode
PL4 7AN

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Plymouth

  2. 10 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Plymouth took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Totton

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Plymouth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 28 College Avenue Plymouth PL4 7AN

    23/00016/FUL Submitted 5 Jan 2023 11m away

    Replacement enlarged rear balcony

    Granted Full applications 15 docs
  • 23 College Lane Plymouth PL4 7AW

    21/01258/MOR Submitted 5 Jul 2021 33m away

    Pre-application for Change of use and extension of building to create 4 bedroom HMO.

    Decided Outline Extension 6 docs
  • 15 Connaught Avenue Plymouth PL4 7BT

    26/00501/TCO Submitted 7 Apr 2026 47m away

    G1 Conifers-Fell

    Granted Trees 4 docs
  • 40 Mannamead Road Plymouth PL4 7AF

    21/01291/MOR Submitted 8 Jul 2021 60m away

    Pre-application for the conversion of property to up to 3no. dwellings (Class C3), with potential retention of office space at ground floor level

    Decided Outline 5 docs
    Several homes
  • 8 Western College Road Plymouth

    26/00244/PRUS Submitted 18 Feb 2026 64m away

    Proposed change of use from dwellinghouse (Class C3) to residential accommodation (Class C2) to provide supported accommodation for up to 4no. young people

    Decided Outline 9 docs
    Domestic
  • 42 Mannamead Road Plymouth PL4 7AF

    21/00788/AMD Submitted 27 Apr 2021 64m away

    Non material Amendment: Internal and window alterations for application 18/01461/FUL

    Decided Amendments Windows or glazing 5 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01214/FUL Awaiting decision

    10 Clifton Place Plymouth PL4 8HX

    Change of use from a dwellinghouse (Class C3) to a residential Institution (Class C2)

    31 Aug 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications