Planning application
26/00541/GPD
220 Ernesettle Lane Plymouth PL5 2EY
Proposal
Installation of Solar panels on DVSA MPTC building.
As published by the council, reference 26/00541/GPD
Timeline
Dates from the published record
-
15 Apr 2026
Received by Plymouth
-
4 Jun 2026
Decision issued: Prior Approval Required & Given
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/00100/FUL Granted
220 Ernesettle Lane Plymouth PL5 2EY
Installation of condenser unit within enclosure to the south elevation and temporary PAU accommodation.
-
26/00033/S73 Granted
Plymouth Enterprise Park Phase 1, Ernesettle Lane Plymouth PL5 2SA
Variation of conditions 2 (approved plans) and 8 (layout) of application 15/01002/FUL to substitute the approved layout plan with drawing 1493-07A and remove reference to the number of storage units, and removal of condition 7 (hours of use)
-
25/01520/CDM Decided
280 Ernesettle Lane Plymouth PL5 2SA
Condition Discharge: Condition 6 (MOD Safeguarding) of application 23/01132/FUL
-
26/00026/S73 Granted
289 Ernesettle Lane Plymouth PL5 2SA
Variation of conditions 2 (approved plans) and 4 (layout) of application 13/01266/FUL to substitute the approved layout plan with drawing 1493-06A and remove reference to the number of storage units, and removal of condition 3 (hours of use).
-
18/00765/S73 Granted
Former Toshiba Factory Site, Ernesettle Lane Plymouth PL5 2TS
Variation of condition 5 (hours of operation) of application 13/02406/FUL to allow operation any time outside of permitted hours on a maximum of 5 occasions per year (maximum duration of 30 minutes per occasion)
Other outline applications
In Plymouth
-
26/01044/PRDE Awaiting decision
58 Fletemoor Road Plymouth PL5 1UQ
Demolition and construction of single storey rear extension
-
26/01031/PRDE Awaiting decision
15 Overton Gardens Plymouth PL3 5BX
Single storey rear extension
-
26/01020/MOR Awaiting decision
16B Mount Street Greenbank Plymouth PL4 8NZ
Conversion of two bed flat (C3) to three bedroom HMO (C4)
-
26/01017/PRUS Awaiting decision
68 Beaumont Road Plymouth PL4 9BP
Use of existing dwellinghouse (Class C3) as supported living accomodation (Class C3(b)) for up to 6no. residents
-
26/01024/PIP Awaiting decision
Land At St Aubyn Road Plymouth PL1 4AE
Permission in Principle for the erection of a three-storey building comprising 3 self-contained flats.