Skip to content
PlanIndex Get alerts
Menu

Planning application

Building MO42, Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

Granted Plymouth 26/00459/FUL Full Application

Works: Roofing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Roof replacement with upgraded insulation, new staircase, fenced compound, and improved access and safety features.

As published by the council, reference 26/00459/FUL

Application record

Reference
26/00459/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
27 Mar 2026
Validated
10 Apr 2026
Decided
8 Jul 2026
Ward
DEVONPORT
Decision by
Delegated Decision
Postcode
PL1 4SG

Site history

Applications at this address on the Plymouth register

This site has had 3 applications since 2026: 2 approved, 0 refused.

  • 26/01270/CDMLB Awaiting decision

    Building MO42, Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Discharge Condition 3 (External Staircase, Security Fence and Gate) and Condition 5 (Roof Safety Measures) of application: 26/00460/LBC.

    Submitted 11 Sep 2026
  • 26/00460/LBC Granted

    Building MO42, Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG

    Roof replacement with upgraded insulation, new staircase, fenced compound, and improved access and safety features.

    Decided 8 Jul 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 27 Mar 2026

    Received by Plymouth

  2. 10 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jul 2026

    Decision issued: Grant Conditionally

  4. 26 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 26/00460/LBC (Decided)

Who's behind it

Company information only, from the register and Companies House

King Welsh LTD Agent, registered in Plymouth

Active · incorporated 2016 · Plymouth

31 applications on PlanIndex · across 6 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

  • FULL GRANT DECISION NOTICE Decision Outcome · 08 Jul 2026
  • OFFICER REPORT Decision Outcome · 08 Jul 2026
  • DESIGN AND ACCESS STATEMENT REV A Supporting Information · 16 Jun 2026
  • HERITAGE STATEMENT REV A Supporting Information · 16 Jun 2026
  • PROPOSED GROUND FLOOR Drawings and Images · 16 Jun 2026
  • EXTENSION OF TIME Decision Outcome · 12 Jun 2026
  • EXTENSION OF TIME Decision Outcome · 05 Jun 2026
  • EXTENSION OF TIME Decision Outcome · 21 May 2026
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 30 Apr 2026
  • NATURAL INFRASTRUCTURE Consultee Comment · 24 Apr 2026
  • OFFICE FOR NUCLEAR REGULATION Public Comment · 20 Apr 2026
  • SITE NOTICE GENERAL Decision Outcome · 13 Apr 2026
  • CROWN STATEMENT Supporting Information · 13 Apr 2026
  • CLIMATE EMERGENCY COMPLIANCE FORM Supporting Information · 10 Apr 2026
  • WILDLIFE TRIGGER TABLE Supporting Information · 10 Apr 2026
  • SUSTAINABILITY STATEMENT Supporting Information · 10 Apr 2026
  • APPLICATION FORM Application · 27 Mar 2026
  • LOCATION PLAN Drawings and Images · 27 Mar 2026
  • CIL FORM Application · 27 Mar 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Supporting Information · 27 Mar 2026
  • SUPERSEDED HERITAGE STATEMENT Supporting Information · 27 Mar 2026
  • EXISTING GROUND FLOOR PLAN Drawings and Images · 27 Mar 2026
  • EXISTING ROOF PLAN Drawings and Images · 27 Mar 2026
  • EXISTING EAST AND WEST ELEVATIONS Drawings and Images · 27 Mar 2026
  • EXISTING NORTH AND SOUTH ELEVATIONS Drawings and Images · 27 Mar 2026
  • SUPERSEDED PROPOSED GROUND FLOOR Drawings and Images · 27 Mar 2026
  • PROPOSED ROOF PLAN Drawings and Images · 27 Mar 2026
  • PROPOSED EAST AND WEST ELEVATIONS Drawings and Images · 27 Mar 2026
  • PROPOSED NORTH AND SOUTH ELEVATIONS Drawings and Images · 27 Mar 2026
  • WILDLIFE STATEMENT Supporting Information · 27 Mar 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 8 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Plymouth

  • 26/00826/FUL Decided

    50 New George Street Plymouth PL1 1RR

    Alterations to shopfront and installation of roller shutter door

    10 Jun 2026 Full applications
  • 26/01285/FUL Awaiting decision

    63 Haddington Road Plymouth PL2 1RW

    Change of use from offices (Class E) to house in multiple occupation (Sui Generis), together with external alterations

    14 Sep 2026 Full applications
  • 26/01263/FUL Awaiting decision

    73 St Georges Avenue Plymouth PL2 3PW

    Proposed single storey rear/side extension

    10 Sep 2026 Full applications
  • 26/01259/FUL Awaiting decision

    338 Bodmin Road Plymouth PL5 4AX

    First floor side extension and detached garage

    10 Sep 2026 Full applications
  • 25/01534/FUL Decided

    36 Torr Lane Plymouth PL3 5NZ

    Single storey rear extension and extension of side/rear garage with associated steps (part retrospective)

    24 Nov 2025 Full applications