Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01603/MOR

New Continental Hotel Millbay Road Plymouth PL1 3LD

Decided Plymouth Minor Pre Application Enquiry

Proposal

Pre-application to re-order parts of the lower floors to create additional rooms, removal of external rear staircase, and installation of wheelchair lift

As published by the council, reference 25/01603/MOR

Timeline

Dates from the published record

  1. 8 Dec 2025

    Received by Plymouth

  2. 15 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Mar 2026

    Decision issued: Closed Development Enquiry

  4. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 23/00159/ADV Granted

    Located On The Central Reserve Of The Crescent (B3240) After Union Street Plymouth

    Proposed Free-Standing Advertising Information Unit featuring 2x internally illuminated digital displays (H 1635mm x W 924mm) to replace existing Free-Standing Advertising Information Unit featuring 2x internally illuminated 6-sheet displays.

    6 Feb 2023 73m away Advertising
  • 26/00497/CDM Awaiting decision

    Ocean Crescent Plymouth PL1 3FG

    Condition Discharge: Conditions 3 (Construction Traffic Management Plan), 5 (Render Colour) & 6 (Cladding Details) of application 25/00896/FUL

    2 Apr 2026 87m away Conditions
  • 26/00416/FUL Granted

    St Andrews Church Of England Primary School Citadel Road Plymouth PL1 3AY

    New low-level path finding PIR external lighting.

    20 Mar 2026 100m away Full applications
  • 25/01036/MOR Decided

    Duke Of Cornwall Hotel 13 Millbay Road Plymouth PL1 3LG

    Pre-application for replacement of external fire escapes and refurbishment of rear elevation facade

    4 Aug 2025 104m away Outline
  • 25/01515/FUL Granted

    Duke Of Cornwall Hotel 13 Millbay Road Plymouth PL1 3LG

    Removal and replacement of existing enclosed fire escape staircase and associated structures, various alterations and repairs to the roof, render, rainwater goods and windows and associated works

    19 Nov 2025 105m away Full applications
  • 25/01516/LBC Granted

    Duke Of Cornwall Hotel 13 Millbay Road Plymouth PL1 3LG

    Removal and replacement of existing enclosed fire escape staircase and associated structures, various alterations and repairs to the roof, render, rainwater goods and windows, internal alterations and associated works

    19 Nov 2025 105m away Heritage and listed buildings

In Plymouth

  • 26/01044/PRDE Awaiting decision

    58 Fletemoor Road Plymouth PL5 1UQ

    Demolition and construction of single storey rear extension

    24 Jul 2026 Outline
  • 26/01031/PRDE Awaiting decision

    15 Overton Gardens Plymouth PL3 5BX

    Single storey rear extension

    21 Jul 2026 Outline
  • 26/01020/MOR Awaiting decision

    16B Mount Street Greenbank Plymouth PL4 8NZ

    Conversion of two bed flat (C3) to three bedroom HMO (C4)

    20 Jul 2026 Outline
  • 26/01017/PRUS Awaiting decision

    68 Beaumont Road Plymouth PL4 9BP

    Use of existing dwellinghouse (Class C3) as supported living accomodation (Class C3(b)) for up to 6no. residents

    20 Jul 2026 Outline
  • 26/01024/PIP Awaiting decision

    Land At St Aubyn Road Plymouth PL1 4AE

    Permission in Principle for the erection of a three-storey building comprising 3 self-contained flats.

    20 Jul 2026 Outline