Planning application

Dell Childrens Centre 375 Blandford Road Plymouth PL3 6JD

Decided Plymouth 25/01549/11 GPDO PT11

Works: Demolition

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Prior approval for demolition of Dell Children's Centre and all associated structures within the site boundary.

As published by the council, reference 25/01549/11

Application record

Reference
25/01549/11
Type
GPDO PT11
Status
Decided
Received
25 Nov 2025
Validated
25 Nov 2025
Decided
13 Jan 2026
Ward
EFFORD AND LIPSON
Postcode
PL3 6JD

Site history

Applications at this address on the Plymouth register

This site has had 3 applications since 2024: 0 approved, 1 refused.

  • 26/01183/FUL Awaiting decision

    Dell Childrens Centre, 375 Blandford Road Plymouth PL3 6JD

    Three storey residential building comprising 18 affordable flats with associated vehicular and pedestrian access, car parking, cycle and refuse storage, communal amenity space and associated works

    Submitted 24 Aug 2026 Full applications
  • 24/01646/11 Refused

    Dell Childrens Centre 375 Blandford Road Plymouth PL3 6JD

    Prior approval for demolition of DELL Childrens Centre and all associated structures within the site boundary

    Decided 27 Jan 2025 Outline

Timeline

Dates from the published record

  1. 25 Nov 2025

    Received by Plymouth

  2. 13 Jan 2026

    Decision issued

  3. 26 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Gilpin Demolition Group Ltd Agent, registered in Exeter

Active · incorporated 2011 · Exeter

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Plymouth City Council Applicant

196 applications on PlanIndex · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

  • PT11 PRIOR APPROVAL REQUIRED & GIVEN Decision Outcome · 13 Jan 2026
  • OFFICER REPORT Decision Outcome · 13 Jan 2026
  • TREE PROTECTION PLAN Drawings and Images · 12 Jan 2026
  • EXTENSION OF TIME Decision Outcome · 22 Dec 2025
  • DEMOLITION - ENVIRONMENTAL MANAGEMENT PLAN Supporting Information · 19 Dec 2025
  • BAT EMERGENCE SURVEYS Supporting Information · 19 Dec 2025
  • TREE APPRAISAL PLAN 1 OF 1 Drawings and Images · 19 Dec 2025
  • PRELIMINARY ECOLOGICAL APPRAISAL Supporting Information · 19 Dec 2025
  • ARBORICULTURAL APPRAISAL Supporting Information · 19 Dec 2025
  • BASELINE BIODIVERSITY NET GAIN STRATEGY Supporting Information · 19 Dec 2025
  • REPORT - DELL CHILDRENS CENTRE Supporting Information · 19 Dec 2025
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 17 Dec 2025
  • PUBLIC PROTECTION Consultee Comment · 15 Dec 2025
  • HIGHWAY AUTHORITY Consultee Comment · 15 Dec 2025
  • SOUTH WEST WATER Consultee Comment · 12 Dec 2025
  • APPLICATION FORM Application · 25 Nov 2025
  • COVER LETTER Supporting Information · 25 Nov 2025
  • DEMOLITION ENVIRONMENTAL MANAGEMENT PLAN Supporting Information · 25 Nov 2025
  • HSE NOTIFICATION Supporting Information · 25 Nov 2025
  • LOCATION PLAN Drawings and Images · 25 Nov 2025
  • DEMOLITION PLAN METHOD STATEMENT Supporting Information · 25 Nov 2025
  • CONSTRUCTION PHASE PLAN Supporting Information · 25 Nov 2025
  • SITE SPECIFIC RISK ASSESSMENT Supporting Information · 25 Nov 2025
  • ECOLOGICAL SURVEY Supporting Information · 25 Nov 2025
  • EVIDENCE OF DISPLAYED NOTICE 28112025 Photos · 25 Nov 2025
  • SITE NOTICE FOR PROPOSED DEMOLITION Supporting Information · 25 Nov 2025

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Plymouth has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 375 Blandford Road Plymouth PL3 6JD

    26/00253/MJR Submitted 19 Feb 2026 50 yards away

    Pre-application for a three-storey residential building containing 18 flats

    Decided Outline New dwelling 42 docs
    Major scheme
  • Dell Childrens Centre 375 Blandford Road Plymouth PL3 6JD

    24/01646/11 Submitted 16 Dec 2024 50 yards away

    Prior approval for demolition of DELL Childrens Centre and all associated structures within the site boundary

    Refused Outline Demolition 11 docs
  • 28 Medway Place Plymouth PL3 6HB

    26/01463/TPO Submitted 21 Oct 2026 100 yards away

    90% historically approved · decision due ~16 Dec

    T1 - Reduce overhanging branches to crown width of 6m. T2 - Fell. T3 - Removal of limbs marked in photo and one limb growing on the South side to crown width of 9m.

    Awaiting decision Trees
  • 28 Medway Place Plymouth PL3 6HB

    25/01404/TPO Submitted 22 Oct 2025 150 yards away

    1. Edler Tree Fell 2. Beech Tree, to remove 6/7 small branches no thicker than 3/4 inches up to the trunk to the main fork of the tree. Tree height around 24 metres. Remove 3 limbs by 5 metres down to a natural growing point, All three limbs no more than 6 inches in diameter back to fence line.

    Refused Trees 5 docs
    Small domestic
  • 40 Medway Place Plymouth PL3 6HB

    20/00876/TPO Submitted 22 Jun 2020 150 yards away

    T4 and T5 Beech - reduce crowns by 2-3m to natural growth points. T4 closest to house reduce lower overhanging branches back to boundary line to natural growth points (amendment agreed with applicant 14/9/20).

    Granted Trees 6 docs
  • 32 Stott Close Plymouth PL3 6HA

    18/01868/TPO Submitted 30 Oct 2018 150 yards away

    1x Sycamore: Fell Coppice self-seeded growth <300mm diameter growing within 1m of wall. Remove partially failed tree resting on the wall of 22 Medway Place. Clear BT lines and crown lift trees within marked area to achieve highway clearance.

    Granted Trees 5 docs

In Plymouth

  • 26/01236/MOR Awaiting decision

    33 - 37 New George Street Plymouth PL1 1RA

    Pre-application for new residential entrance to upper floors

    Received 4 Sep, published by the council 9 Sep 2026 Outline
  • 26/01205/MOR Awaiting decision

    54 Stuart Road Plymouth PL3 4EE

    Pre-application for extension of a bed and breakfast building to increase bedroom numbers

    Received 28 Aug, published by the council 1 Sep 2026 Outline
  • 25/01068/MOR Withdrawn

    Land Off Tothill Road Plymouth

    Pre-application for hybrid development comprising a full application for the creation of 8 Padel Courts with parking and other associated ancillary infrastructure and facilities, and outline consent for the use of the residual land holding for co-living for up to 29 units including communal on-site facilities with access only

    Received 12 Aug, published by the council 26 Jul 2026 Outline
  • 26/00540/MOR Decided

    Denmark, Horsham Lane Tamerton Foliot Plymouth PL5 4NP

    Pre-application for the erection of a single dwelling

    Received 15 Apr, published by the council 26 Jul 2026 Outline
  • 26/01146/PRDE Awaiting decision

    Ham Drive Nursery School Ham Drive Plymouth PL2 2NJ

    The proposal comprises the construction of a single-storey extension to the existing Ham Drive Nursery School building to provide additional teaching/play space, a sleep room, kitchen/baby change area, store and entrance lobby. The extension will be constructed in the position and to the dimensions shown on the submitted proposed plans and elevations. No new vehicular or pedestrian access is proposed and no new street is to be laid out. No new means of enclosure are proposed. Existing external access arrangements will remain unchanged. Localised hardstanding and external surfaces disturbed by the construction works will be reinstated or made good on completion. No significant new areas of hardstanding are proposed beyond those necessary immediately around the extension and for making good to existing surfaces. Foul drainage from the proposed kitchen sink and baby-change handwash basin will be connected into the existing drainage system, with the exact connection point to be verified on site. Surface water from the new pitched roof will be collected by gutters and rainwater downpipes and discharged to the existing surface water drainage system or other suitable existing drainage arrangement, subject to confirmation on site. The precise siting, footprint, dimensions, internal layout and external elevations of the proposed extension are shown on the submitted drawings.

    Received 13 Aug, published by the council 20 Aug 2026 Outline