Granted Plymouth 25/01267/S73 Removal or variation of a condition

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of Conditions 1 (Approved Plans), 3 (Employment Skills Plan), 8 (Street Details), 11 (Land Quality), 14 (Hard Landscaping), 15 (Boundary Treatment), 16 (Ventilation & Glazing Details), 17 (External Materials), 34 (Soft Landscaping) to vary design, tenure mix and amend triggers for information submission and partial discharge of Conditions 4 (Programme Of Archaeological Works), 5 (Access For Contractors), 7 (Construction Traffic Management Plan), 9 (Onsite Renewable Energy Generation), 10 (District Heating), 12 (Construction Environmental Management Plan), 14 (Hard Landscaping) , 15 (Boundary Treatment), 16 (Ventilation & Glazing Details), 17 (External Materials) in relation to phase one of application 22/02109/FUL

As published by the council, reference 25/01267/S73

Application record

Reference
25/01267/S73
Type
Removal or variation of a condition
Status
Decided
Decision
Granted As published: Grant conditionally subject to S106
Received
29 Sep 2025
Validated
7 Oct 2025
Decided
30 Jan 2026
Ward
ST PETER AND THE WATERFRONT
Decision by
Delegated Decision
Postcode
PL1 3LT

Site history

Applications at this address on the Plymouth register

This site has had 6 applications since 2025: 2 approved, 1 refused.

  • 26/01325/AMD Awaiting decision

    Land At Bath Street Plymouth PL1 3LT

    Non material amendment to Condition 1 (Approved Plans) of 25/01267/S73 to amend details (internal and external) of Blocks B1, C1 and C2 and House Types 1, 2 and 3 along with associated amendments.

    Submitted 22 Sep 2026 Amendments
  • 26/01229/CDM Decided

    Land At Bath Street Plymouth PL1 3LT

    Discharge of Condition 25 (Foul Sewerage and Surface Water Services) of Planning Permission Ref: 25/01267/S73

    Decided 28 Sep 2026
  • 26/01036/CDM Refused

    Land At Bath Street Plymouth PL1 3LT

    Discharge of Condition 25 (Foul Sewerage and Surface Water Services) of Planning Permission Ref: 25/01267/S73

    Decided 11 Aug 2026
  • 26/00181/AMD Decided

    Land At Bath Street Plymouth PL1 3LT

    Non-material amendment: Amendments to biodiversity calculations and requirements following amendments set out in 25/01267/S73 including variation of condition 1 (approved plans)

    Decided 3 Mar 2026 Amendments
  • 25/01504/CDM Granted

    Land At Bath Street Plymouth PL1 3LT

    Condition Discharge: Condition 6 (Highway Dilapidation Survey) and Condition 11 (Land Quality) Part 1 of application 22/02109/FUL

    Decided 23 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 29 Sep 2025

    Received by Plymouth

  2. 7 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jan 2026

    Decision issued: Grant conditionally subject to S106

  4. 26 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

4 later applications on the register refer to this one:

  • 26/01325/AMD Awaiting decision

    Land At Bath Street Plymouth PL1 3LT

    Non material amendment to Condition 1 (Approved Plans) of 25/01267/S73 to amend details (internal and external) of Blocks B1, C1 and C2 and House Types 1, 2 and 3 along with associated amendments.

    Submitted 22 Sep 2026 Amendments
  • 26/01229/CDM Decided

    Land At Bath Street Plymouth PL1 3LT

    Discharge of Condition 25 (Foul Sewerage and Surface Water Services) of Planning Permission Ref: 25/01267/S73

    Decided 28 Sep 2026
  • 26/01036/CDM Refused

    Land At Bath Street Plymouth PL1 3LT

    Discharge of Condition 25 (Foul Sewerage and Surface Water Services) of Planning Permission Ref: 25/01267/S73

    Decided 11 Aug 2026
  • 26/00181/AMD Decided

    Land At Bath Street Plymouth PL1 3LT

    Non-material amendment: Amendments to biodiversity calculations and requirements following amendments set out in 25/01267/S73 including variation of condition 1 (approved plans)

    Decided 3 Mar 2026 Amendments
  • Application: 22/02109/FUL (Decided)

Who's behind it

Company information only, from the register and Companies House

Classic Builders (South West) Ltd Agent, a construction firm registered in Plymouth

Active · incorporated 2003 · Plymouth

7 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

143 documents on file for this application

  • SECTION73 GRANT SUBJECT TO PS106 OBLI Decision Outcome · 30 Jan 2026
  • OFFICER REPORT Decision Outcome · 30 Jan 2026
  • DRAFT S106 AGREEMENT Supporting Information · 28 Jan 2026
  • EXTENSION OF TIME Decision Outcome · 23 Jan 2026
  • WALLS AND RAILINGS Drawings and Images · 21 Jan 2026
  • URBAN DESIGN Consultee Comment · 19 Jan 2026
  • URBAN DESIGN Consultee Comment · 19 Jan 2026
  • ARCHAEOLOGY REPORT Supporting Information · 16 Jan 2026
  • HISTORIC ENVIRONMENT Consultee Comment · 16 Jan 2026
  • SURFACE WATER DISCHARGE VIA PUMPING STATION Supporting Information · 15 Jan 2026
  • SOFT LANDSCAPE LAYOUT SHEET 5 OF 5 Drawings and Images · 14 Jan 2026
  • SOFT LANDSCAPE LAYOUT SHEET 4 OF 5 Drawings and Images · 14 Jan 2026
  • SOFT LANDSCAPE LAYOUT SHEET 3 OF 5 Drawings and Images · 14 Jan 2026
  • SOFT LANDSCAPE LAYOUT SHEET 2 OF 5 Drawings and Images · 14 Jan 2026
  • SOFT LANDSCAPE LAYOUT SHEET 1 OF 5 Drawings and Images · 14 Jan 2026
  • LANDSCAPE PLAN Drawings and Images · 14 Jan 2026
  • LANDSCAPE MASTERPLAN Drawings and Images · 14 Jan 2026
  • EXTENSION OF TIME Decision Outcome · 13 Jan 2026
  • HIGHWAY AUTHORITY Consultee Comment · 09 Jan 2026
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 06 Jan 2026
  • EMAIL CORRESPONDENCE Application · 24 Dec 2025
  • EMPLOYMENT AND SKILLS PLAN - KPIS Supporting Information · 23 Dec 2025
  • HIGHWAY AUTHORITY Consultee Comment · 18 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Supporting Information · 16 Dec 2025
  • PLANNING CONDITIONS DISCHARGE INFORMATION Supporting Information · 16 Dec 2025
  • PROPOSED SITE PLAN - GROUND LEVEL Drawings and Images · 16 Dec 2025
  • BATH STREET - PROPOSED MATERIALS Supporting Information · 12 Dec 2025
  • VISUALISATION 02 Drawings and Images · 12 Dec 2025
  • VISUALISATION 04 Drawings and Images · 12 Dec 2025
  • VISUALISATION 05 Drawings and Images · 12 Dec 2025
  • BUILDING SKILLS PLYMOUTH Consultee Comment · 10 Dec 2025
  • BATH STREET PV ESTIMATE OF KWP Supporting Information · 08 Dec 2025
  • SUMMARY INFORMATION REPORT C2 - FLAT C2 Supporting Information · 08 Dec 2025
  • SUMMARY INFORMATION REPORT C1 - MAS C1 Supporting Information · 08 Dec 2025
  • SUMMARY INFORMATION REPORT B2 HT03 Supporting Information · 08 Dec 2025
  • SECTION 73 - VIABILITY STATEMENT Supporting Information · 05 Dec 2025
  • VISUALISATION 01 Drawings and Images · 05 Dec 2025
  • VISUALISATION 03 Drawings and Images · 05 Dec 2025
  • DRAINAGE CEMP COMMENTS Supporting Information · 02 Dec 2025
  • HISTORIC ENVIRONMENT Consultee Comment · 25 Nov 2025
  • PUBLIC PROTECTION Consultee Comment · 21 Nov 2025
  • HOUSING DELIVERY Consultee Comment · 13 Nov 2025
  • HIGHWAY AUTHORITY Consultee Comment · 10 Nov 2025
  • LOW CARBON Consultee Comment · 10 Nov 2025
  • NATURAL INFRASTRUCTURE Consultee Comment · 07 Nov 2025
  • URBAN DESIGN Consultee Comment · 07 Nov 2025
  • HISTORIC ENGLAND Consultee Comment · 03 Nov 2025
  • RESPONSE IN RELATION TO AFFORDABLE HOUSING Supporting Information · 03 Nov 2025
  • PUBLIC PROTECTION Consultee Comment · 28 Oct 2025
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 27 Oct 2025
  • LANDSCAPE HARD DETAILS Drawings and Images · 16 Oct 2025
  • S106 FOR 22/02109/FUL Legal · 16 Oct 2025
  • HOUSING DELIVERY Consultee Comment · 09 Oct 2025
  • BLOCK B1 ELEVATIONS EAST/WEST Drawings and Images · 07 Oct 2025
  • BLOCK B1 ELEVATIONS EAST/WESTBLOCK B1 ELEVATIONS NORTH/SOUTH Drawings and Images · 07 Oct 2025
  • BLOCK C2 ? UPPER FLOOR PLANS Drawings and Images · 07 Oct 2025
  • SITE NOTICE GENERAL Decision Outcome · 07 Oct 2025
  • APPLICATION FORM Application · 29 Sep 2025
  • CONDITION 3. EMPLOYMENT SKILLS PLAN Supporting Information · 29 Sep 2025
  • CONSTRUCTION PROGRAMME Supporting Information · 29 Sep 2025
  • FOUL WATER BELOW GROUND DRAINAGE LAYOUT Drawings and Images · 29 Sep 2025
  • SURFACE WATER BELOW GROUND DRAINAGE LAYOUT Drawings and Images · 29 Sep 2025
  • DRAINAGE DETAILS SHEET 1 OF 4 Drawings and Images · 29 Sep 2025
  • DRAINAGE DETAILS SHEET 2 OF 4 Drawings and Images · 29 Sep 2025
  • DRAINAGE DETAILS SHEET 3 OF 4 Drawings and Images · 29 Sep 2025
  • DRAINAGE DETAILS SHEET 4 OF 4 Drawings and Images · 29 Sep 2025
  • CONSTRUCTION DETAILS Drawings and Images · 29 Sep 2025
  • PROPOSED LEVELS Drawings and Images · 29 Sep 2025
  • ENERGY STATEMENT Supporting Information · 29 Sep 2025
  • PROPOSED MATERIALS Supporting Information · 29 Sep 2025
  • PLANNING CONDITION DISCHARGE NOISE REPORT Supporting Information · 29 Sep 2025
  • BLOCK C1 - ELEVATION NORTH/SOUTH Drawings and Images · 29 Sep 2025
  • BLOCK C1 - ELEVATIONS EAST/WEST Drawings and Images · 29 Sep 2025
  • BLOCK C2 - ELEVATION NORTH/SOUTH Drawings and Images · 29 Sep 2025
  • BLOCK C2 - ELEVATION EAST/WEST Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 01 - ELEVATIONS 01 Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 01 - ELEVATIONS 02 Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 02 - ELEVATIONS Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 03 - ELEVATION 01 Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 03 - ELEVATIONS 02 Drawings and Images · 29 Sep 2025
  • BLOCK B1 - GROUND FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK B1 - UPPER FLOOR PLANS Drawings and Images · 29 Sep 2025
  • BLOCK B1 - ROOF PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C1 - GROUND FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C1 - FIRST FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C1 - SECOND FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C1 - THIRD FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C1 - ROOF PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C2 - GROUND FLOOR PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C2 - ROOF PLAN Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 01 - PLANS Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 02 - PLANS Drawings and Images · 29 Sep 2025
  • HOUSE TYPE 03 PLANS Drawings and Images · 29 Sep 2025
  • BLOCK B1 - TENURE PLANS Drawings and Images · 29 Sep 2025
  • BLOCK B2 - TENURE PLANS Drawings and Images · 29 Sep 2025
  • BLOCK C1 - TENURE PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C2 - TENURE PLANS Drawings and Images · 29 Sep 2025
  • BLOCK C3 - TENURE PLAN Drawings and Images · 29 Sep 2025
  • MIDDLE HOUSES - TENURE PLAN Drawings and Images · 29 Sep 2025
  • TENURE SITE PLAN - GROUND LEVEL Drawings and Images · 29 Sep 2025
  • TENURE SITE PLAN - FIRST LEVEL Drawings and Images · 29 Sep 2025
  • TENURE SITE PLAN - SECOND LEVEL Drawings and Images · 29 Sep 2025
  • TENURE SITE PLAN - THIRD LEVEL Drawings and Images · 29 Sep 2025
  • TENURE SITE PLAN - FOURTH LEVEL Drawings and Images · 29 Sep 2025
  • BLOCK B1 - ACCESSIBILITY PLANS Drawings and Images · 29 Sep 2025
  • BLOCK B2 - ACCESSIBILITY PLANS Drawings and Images · 29 Sep 2025
  • BLOCK C1 - ACCESSIBILITY PLAN Drawings and Images · 29 Sep 2025
  • BLOCK C2 - ACCESSIBILITY PLANS Drawings and Images · 29 Sep 2025
  • BLOCK C3 - ACCESSIBILITY PLAN Drawings and Images · 29 Sep 2025
  • MIDDLE HOUSES - ACCESSIBILITY PLAN Drawings and Images · 29 Sep 2025
  • ACCESSIBILITY SITE PLAN - GROUND LEVEL Drawings and Images · 29 Sep 2025
  • ACCESSIBILITY SITE PLAN - FIRST LEVEL Drawings and Images · 29 Sep 2025
  • ACCESSIBILITY SITE PLAN - SECOND LEVEL Drawings and Images · 29 Sep 2025
  • ACCESSIBILITY SITE PLAN - THIRD LEVEL Drawings and Images · 29 Sep 2025
  • ACCESSIBILITY SITE PLAN - FOURTH LEVEL Drawings and Images · 29 Sep 2025
  • SUBSTATION CONSTRUCTION DETAILS Drawings and Images · 29 Sep 2025
  • SURFACE WATER DISCHARGE OPTIONS - TECHNICAL NOTE Supporting Information · 29 Sep 2025
  • HISTORIC ENVIRONMENT IMPACT ASSESSMENT Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 1 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 2 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 3 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 4 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 5 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 6 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 7 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 8 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 9 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 10 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 11 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 12 Supporting Information · 29 Sep 2025
  • GROUND INVESTIGATION REPORT PART 13 Supporting Information · 29 Sep 2025
  • CIL FORM Application · 29 Sep 2025
  • DESIGN AND ACCESS STATEMENT Supporting Information · 29 Sep 2025
  • SITE PLAN - BLOCK PLANT ROOM LOCATIONS Drawings and Images · 29 Sep 2025
  • 5DHC NETWORK CONNECTION DESIGN AND STRATEGY Supporting Information · 29 Sep 2025
  • GROUND SOURCE HEATING AND DUCTING UTILITIES PLAN SHEET 1 Drawings and Images · 29 Sep 2025
  • GROUND SOURCE HEATING AND DUCTING UTILITIES PLAN SHEET 2 Drawings and Images · 29 Sep 2025
  • DAIKIN ALTHERMA 3BROCHURE Supporting Information · 29 Sep 2025
  • 5DHC HEAT NETWORK SYSTEM CONFIGURATIONS Drawings and Images · 29 Sep 2025
  • UNIT HEATING AND HOT WATER SCHEMATIC Drawings and Images · 29 Sep 2025
  • 5DHC HEAT NETWORK SITE CONNECTION INTERFACE Drawings and Images · 29 Sep 2025
  • GENERAL ARRANGEMENT DRAWING Drawings and Images · 29 Sep 2025
  • PLANNING STATEMENT Supporting Information · 29 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 30 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land At Bath Street Plymouth PL1 3LT

    25/01504/CDM Submitted 14 Nov 2025 50 yards away

    Condition Discharge: Condition 6 (Highway Dilapidation Survey) and Condition 11 (Land Quality) Part 1 of application 22/02109/FUL

    Granted Conditions 8 docs
  • Land At Bath Street Plymouth PL1 3LT

    26/00181/AMD Submitted 5 Feb 2026 50 yards away

    Non-material amendment: Amendments to biodiversity calculations and requirements following amendments set out in 25/01267/S73 including variation of condition 1 (approved plans)

    Decided Amendments 6 docs
  • 7-11 Bath Street Plymouth PL1 3LT

    19/00882/11 Submitted 30 May 2019 50 yards away

    Demolition of The Hub and associated outbuildings

    Granted Outline Demolition 14 docs
  • 1 - 5 Bath Street Plymouth PL1 3LT

    19/00739/ADV Submitted 8 May 2019 50 yards away

    Two hoarding advertisements on 10 to 25 Bath Street and the former Kier site on Martin Street. As part of the Millbay Boulevard development the proposal is to display advertising hoardings for the works on Bath Street. The site has been cleared for a proposed housing development.

    Granted Advertising 6 docs
  • Plymouth Pavilions Millbay Road Plymouth PL1 3LF

    18/02123/11 Submitted 20 Dec 2018 50 yards away

    Demolition of service ramp and the adjacent chiller compound

    Granted Outline Demolition 10 docs
  • Moxy Hotel, 14 Millbay Road Plymouth PL1 3LH

    24/01562/FUL Submitted 26 Nov 2024 100 yards away

    Alterations to car park layout/access, inc. access barrier, EV charging points and CCTV

    Granted Full applications 18 docs

In Plymouth

  • 26/01501/AMD Awaiting decision

    Land To West Of Bampton Road Plymouth PL6 8NT

    Non-material amendments for application 23/00886/FUL: Introduction of a 300mm step to the finished floor levels of Plots 1 and 2; alterations to the main site entrance; and bathroom window cills raised by 300mm for Plots 4-6

    Received 27 Oct, published by the council 2 Nov 2026 Amendments
  • 26/01452/AMD Awaiting decision

    1 Candlewick Lane Plymouth PL4 0FF

    Non Material Amendment to Vary Conditions 1 (Approved Plans) and 5 (Specified Use Restriction) of 23/01477/S73 to amend the approved ground floor layout and increase the Class E(b) floorspace from 46.5sqm to 80sqm.

    Received 19 Oct, published by the council 23 Oct 2026 Amendments
  • 26/01364/AMD Awaiting decision

    46 Southside Street Plymouth PL1 2LD

    Non-Material Amendment: Extension of approved rear extension roof to rear boundary wall for application 26/00491/FUL

    1 Oct 2026 Amendments
  • 26/01337/AMD Decided

    54 Widewell Road Plymouth PL6 7DW

    Non-material Amendment: Changing rear ground floor windows to bi-fold doors (amendment of application: 26/00344/FUL)

    24 Sep 2026 Amendments
  • 26/01325/AMD Awaiting decision

    Land At Bath Street Plymouth PL1 3LT

    Non material amendment to Condition 1 (Approved Plans) of 25/01267/S73 to amend details (internal and external) of Blocks B1, C1 and C2 and House Types 1, 2 and 3 along with associated amendments.

    Received 22 Sep, published by the council 24 Sep 2026 Amendments