Skip to content
PlanIndex Get alerts
Menu

Planning application

297 Outland Road Plymouth PL2 3SP

Granted Plymouth 24/01410/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of Conservatory into Single Storey Rear Extension & Garage Conversion

As published by the council, reference 24/01410/FUL

Application record

Reference
24/01410/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
24 Oct 2024
Validated
4 Nov 2024
Decided
20 Dec 2024
Ward
HAM
Decision by
Delegated Decision
Postcode
PL2 3SP

Timeline

Dates from the published record

  1. 24 Oct 2024

    Received by Plymouth

  2. 4 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 20 Dec 2024

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

87 applications on PlanIndex · across 54 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 St Erth Road Plymouth PL2 3SW

    22/01950/HHR Submitted 23 Nov 2022 99m away

    Pre-application for double garage with loft space on top for storage inc. demolition of existing single garage

    Decided Householder Demolition 2 docs
    Domestic
  • 2 St Erth Road Plymouth PL2 3SW

    19/00935/HHR Submitted 10 Jun 2019 100m away

    Pre-application for demolition of existing garage and construction of new double garage.

    Decided Householder Demolition 2 docs
    Domestic
  • Morrisons, 282 Outland Road Plymouth PL3 5UQ

    20/00149/ADV Submitted 30 Jan 2020 107m away

    Signage on all elevations of car windscreen repair pod

    Granted Advertising 11 docs
  • Morrisons, 282 Outland Road Plymouth PL3 5UQ

    20/00148/FUL Submitted 30 Jan 2020 107m away

    Car windscreen repair pod

    Refused Full applications 13 docs
  • 282 Outland Road Plymouth PL3 5UQ

    17/01665/ADV Submitted 10 Aug 2017 127m away

    Various illuminated and non-illuminated signage

    Granted Advertising 7 docs
  • 3 Treveneague Gardens Plymouth PL2 3ST

    18/00806/FUL Submitted 8 May 2018 132m away

    New single storey annex to side of existing dwelling house

    Granted Full applications 13 docs
    Small domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications