Skip to content
PlanIndex Get alerts
Menu

Planning application

24/01132/FUL

103 Wolseley Road Plymouth PL2 3BL

Granted Plymouth Full Application

Proposal

Change of use from a hot food takeaway (Sui Generis) to a tattoo studio (Sui Generis).

As published by the council, reference 24/01132/FUL

Timeline

Dates from the published record

  1. 2 Sep 2024

    Received by Plymouth

  2. 18 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Nov 2024

    Decision issued: Grant Conditionally

  4. 31 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18/00739/11 Granted

    North Prospect Library Greatlands Place Plymouth PL2 3JG

    Application for prior approval for the demolition of former library building.

    26 Apr 2018 88m away Outline
  • 25/01529/MOR Decided

    22A Auckland Road Plymouth PL2 3BX

    Pre-application for amendments to 24/01461/FUL following updated topographical survey

    20 Nov 2025 95m away Outline
  • 25/01336/FUL Granted

    1 - 3 Allenby Road Plymouth PL2 3JH

    Demolition of 2 houses and garages. Development of 9 affordable dwellings.

    10 Oct 2025 155m away Full applications
  • 26/00199/TPO Granted

    Wolseley Close Plymouth PL2 3BY

    G001 - Crown raising is recommended to achieve a minimum 2 metres clearance from the neighbouring building. G002 - Ash x 2 - Crown raise giving up to 2 metres clearance from building.Reduce away from air con units giving 2 metres clearance. T003 - Elm - Remove tree to ground level. T004 - Honey locust - Remove deadwood.Crown raise roadside giving up to 5 metres clearance from highway T009 -European lime - Reduce canopy by 2 metres, current height of 19 metres and radius of 9 metres

    9 Feb 2026 175m away Trees
  • 24/00955/MOR Decided

    Pilgrim Church, St Levan Road Plymouth PL2 3AE

    Pre-application to add a cafe for use as a hot hub for the local community in times of need. We have existing facilities of halls and a kitchen, but wish to ensure that we comply with necessary rules

    25 Jul 2024 176m away Outline
  • 18/01283/GP1 Granted

    45 North Prospect Road Plymouth PL2 3HZ

    A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 4.5m, has a maximum height of 3.25m to ridge, and has an eaves height of 3.0m

    19 Jul 2018 195m away Householder

In Plymouth

  • 26/00322/FUL Refused

    21 Law Walk Plymouth PL6 6LY

    Domestic loft conversion with dormers

    4 Mar 2026 Full applications
  • 26/00786/FUL Granted

    73 Eggbuckland Road Plymouth PL3 5JR

    First floor garage extension to create games room

    4 Jun 2026 Full applications
  • 26/00529/FUL Granted

    58 Montacute Avenue Plymouth PL5 3PR

    Single storey front extension and hardstanding (part-retrospective)

    13 Apr 2026 Full applications
  • 26/00519/FUL Granted

    54 Elm Road Plymouth PL4 7BB

    Installation of EV charger to facilitate pavement channel charging

    10 Apr 2026 Full applications
  • 26/00758/FUL Granted

    45 Kingsley Road Plymouth PL4 6QP

    Installation of EV charger to facilitate pavement channel charging

    1 Jun 2026 Full applications