Planning application
91 Underlane Plymstock Plymouth PL9 9LB
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two-storey rear and side extension
As published by the council, reference 24/01085/FUL
Application record
- Reference
- 24/01085/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 20 Aug 2024
- Validated
- 20 Aug 2024
- Decided
- 26 Sep 2024
- Ward
- PLYMSTOCK RADFORD
- Decision by
- Delegated Decision
- Postcode
- PL9 9LB
Timeline
Dates from the published record
-
20 Aug 2024
Received by Plymouth
-
26 Sep 2024
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Plymouth
48 applications on PlanIndex · across 2 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
6 Burrow Hill Plymouth PL9 9LE
Two-storey side extension and single storey rear extension
Granted Full applications Extension 13 docsSmall domestic -
81 Underlane Plymstock Plymouth PL9 9LA
Extension to existing detached garage for use as storage
Granted Full applications Extension 12 docs -
79 Underlane Plymstock Plymouth PL9 9LA
Two storey rear and side extension and lower ground floor extension form 'granny annexe'
Granted Full applications Extension 11 docs -
7 Burrow Hill Plymouth PL9 9LF
Rear extension and side dormers including clear glazed opening windows to dormers
Granted Full applications Extension Loft or dormer +1 11 docs -
7 Burrow Hill Plymouth PL9 9LF
Pre-application for a rear extension and alteration to garage
Decided Householder Extension 6 docsDomestic -
7 Burrow Hill Plymouth PL9 9LF
Removal of store, side extension, rear extension with loft room over and pitched roof to existing east elevation
Granted Full applications Extension 14 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging