Planning application

23 Saunders Walk Plymouth PL6 6PA

Granted Plymouth 24/00968/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey front extension for residential annex

As published by the council, reference 24/00968/FUL

Application record

Reference
24/00968/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
30 Jul 2024
Validated
31 Jul 2024
Decided
24 Oct 2024
Ward
SOUTHWAY
Decision by
Delegated Decision
Postcode
PL6 6PA

Timeline

Dates from the published record

  1. 30 Jul 2024

    Received by Plymouth

  2. 31 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Oct 2024

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Plymouth

48 applications on PlanIndex · across 2 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Amber Close Plymouth PL6 6FN

    25/01116/HHR Submitted 22 Aug 2025 145m away

    Pre-application for proposed loft conversion with dormer

    Decided Householder Loft or dormer 7 docs
    Domestic
  • 14 Cheshire Drive Plymouth PL6 6SQ

    26/01063/TCO Submitted 28 Jul 2026 162m away

    93% historically approved · decision due ~25 Sep

    Prune Oak tree

    Awaiting decision Trees
  • 9 Cheshire Drive Plymouth PL6 6SQ

    24/01555/PRDE Submitted 25 Nov 2024 170m away

    Proposed use as a therapeutic childrens home (Class C2)

    Decided Outline 13 docs
  • Cheshire Drive Plymouth PL6 6SQ

    20/00402/TPO Submitted 11 Mar 2020 184m away

    Oak (T1) - prune to reduce two limbs:- First branch at approximately 7m reduce back to tear - in accordance with submitted photos. Second over extending side branch at approximately 9m reduce by 2m back to appropriate growth point - in accordance with photos submitted.

    Granted Trees 5 docs
  • Former Tamerton Vale School Plymouth PL6 6PE

    17/02401/AMD Submitted 12 Dec 2017 187m away

    Non-material Minor Amendment: Plots 23 and 24 front elevations to be finished with Audura sand cement render painted polar white (excluding garages) for application 16/01291/S73

    Decided Amendments 3 docs
  • Former Tamerton Vale School Plymouth PL6 6PE

    18/01001/AMD Submitted 6 Jun 2018 187m away

    Non-material Amendment: Addition of gates to the rear gardens of plots 66, 67, and 73 for application 16/01291/S73

    Decided Amendments 3 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications