Skip to content
PlanIndex Get alerts
Menu

Planning application

59 Staddon Park Road Plymouth PL9 9HL

Granted Plymouth 23/00220/FUL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Side basement extension with decking over

As published by the council, reference 23/00220/FUL

Application record

Reference
23/00220/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
13 Feb 2023
Validated
20 Feb 2023
Decided
3 Apr 2023
Ward
PLYMSTOCK RADFORD
Decision by
Delegated Decision
Postcode
PL9 9HL

Timeline

Dates from the published record

  1. 13 Feb 2023

    Received by Plymouth

  2. 20 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 3 Apr 2023

    Decision issued: Grant Conditionally

  4. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

6 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 57 Underlane Plymstock Plymouth PL9 9LA

    19/00177/FUL Submitted 8 Feb 2019 131m away

    Two-storey rear extension including a raised balcony

    Granted Full applications Extension 10 docs
  • 63 Underlane Plymstock Plymouth PL9 9LA

    21/01018/FUL Submitted 1 Jun 2021 139m away

    Single storey rear extension with retained replacement raised patio/terrace area inc. demolition of existing rear extension (re-submission of 21/00137/FUL)

    Granted Full applications Extension Demolition 13 docs
    Small domestic
  • 49 Underlane Plymstock Plymouth PL9 9LA

    21/00601/FUL Submitted 30 Mar 2021 150m away

    Rear infill extension, new terrace and additional storey to existing bungalow and rear balcony.

    Granted Full applications Extension 14 docs
  • 31 Staddon Park Road Plymouth PL9 9HL

    19/01009/FUL Submitted 21 Jun 2019 163m away

    Rear extension and demolish garage to form side porch.

    Granted Full applications Extension Demolition 24 docs
    Small domestic
  • 75 Underlane Plymstock Plymouth PL9 9LA

    19/00305/FUL Submitted 28 Feb 2019 166m away

    Side dormer

    Granted Full applications Loft or dormer 6 docs
  • 77 Underlane Plymstock Plymouth PL9 9LA

    20/00307/FUL Submitted 25 Feb 2020 200m away

    Raise roof height, front porch, two-storey rear extension with balcony and raised decking (amendments to approval 18/02146/FUL to remove gable roof)

    Granted Full applications Extension 11 docs
    Small domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications