Skip to content
PlanIndex Get alerts
Menu

Planning application

Grass Verge Of Ham Drive Ham Drive Pennycross Plymouth PL2 3RL

Granted Plymouth 23/00141/16 GPDO PT16

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The proposal relates to the installation of up to a 20m high slim-line monopole, supporting 6no. antennas, 1no. wraparound equipment cabinet at the base of the monopole, 2no. equipment cabinets, 1no. electric meter cabinet, and ancillary development thereto.

As published by the council, reference 23/00141/16

Application record

Reference
23/00141/16
Type
GPDO PT16
Status
Decided
Decision
Granted As published: Prior Approval Required & Given
Received
2 Feb 2023
Validated
2 Feb 2023
Decided
28 Mar 2023
Ward
HAM
Decision by
Delegated Decision
Postcode
PL2 3RL

Timeline

Dates from the published record

  1. 2 Feb 2023

    Received by Plymouth

  2. 28 Mar 2023

    Decision issued: Prior Approval Required & Given

  3. 31 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Clarke Telecom Ltd Agent, a telecoms contractor registered in Leeds

Active · incorporated 2011 · Leeds

495 applications on PlanIndex · across 128 councils · 81% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

CK Hutchinson Networks (UK) Ltd Applicant

28 applications on PlanIndex · across 13 councils · 54% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

47 documents on file for this application

  • PT16 PRIOR APPROVAL REQUIRED & GIVEN Decision Outcome · 28 Mar 2023
  • OFFICER REPORT Decision Outcome · 28 Mar 2023
  • PENNYCROSS' GOVERNING BODY - MR STUART TULLOCH Public Comment · 07 Mar 2023
  • A WALTERS Public Comment · 27 Feb 2023
  • CALUM PILLAGE Public Comment · 27 Feb 2023
  • MATTHEW SEDDON Public Comment · 27 Feb 2023
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 23 Feb 2023
  • PUBLIC PROTECTION Consultee Comment · 23 Feb 2023
  • MR BRIAN WATMORE Public Comment · 21 Feb 2023
  • MR ANDREW MUTCH Public Comment · 19 Feb 2023
  • DESIGNING OUT CRIME Consultee Comment · 17 Feb 2023
  • MR ALAN PARR Public Comment · 16 Feb 2023
  • KATY MORGAN Public Comment · 15 Feb 2023
  • MR ANDREW WALTERS Public Comment · 15 Feb 2023
  • A RAYFIELD Public Comment · 14 Feb 2023
  • LOUIZE SMALL Public Comment · 13 Feb 2023
  • CLLR CHAZ SINGH Public Comment · 13 Feb 2023
  • JANE SHERRARD-SMITH Public Comment · 13 Feb 2023
  • MRS JOANNE ANSARI Public Comment · 13 Feb 2023
  • MR IVOR TRELOAR Public Comment · 13 Feb 2023
  • CLLR STEPHEN HULME Public Comment · 13 Feb 2023
  • MRS TERESA BAKER Public Comment · 12 Feb 2023
  • MRS KELLY ARSCOTT Public Comment · 12 Feb 2023
  • MR SIMON BADMAN-RICHARDS Public Comment · 11 Feb 2023
  • MR MICHAEL CAPELING Public Comment · 11 Feb 2023
  • MR SEAN GRINYER Public Comment · 11 Feb 2023
  • MRS ANNE PROCTOR Public Comment · 09 Feb 2023
  • HIGHWAY AUTHORITY Consultee Comment · 07 Feb 2023
  • KATE PRETTYJOHNS Public Comment · 05 Feb 2023
  • MR DAVID CURNO Public Comment · 04 Feb 2023
  • SITE NOTICE GPD Decision Outcome · 03 Feb 2023
  • APPLICATION FORM REDACTED Application · 02 Feb 2023
  • ALLAYING HEALTH CONCERNS REGARDING 5G AND EXPOSURE TO RADIO WAVES Supporting Information · 02 Feb 2023
  • COLLABORATING FOR DIGITAL CONNECTIVITY Supporting Information · 02 Feb 2023
  • 5G, EMF EXPOSURE AND SAFETY Supporting Information · 02 Feb 2023
  • PLANNING STATEMENT Supporting Information · 02 Feb 2023
  • COUNCILOR GUIDE TO DIGITAL CONNECTIVITY Supporting Information · 02 Feb 2023
  • CLARIFICATION OF THE DECLARATION Supporting Information · 02 Feb 2023
  • HM GOVERNMENT OFCOM 5G GUIDE Supporting Information · 02 Feb 2023
  • SUPPLEMENTARY INFORMATION Supporting Information · 02 Feb 2023
  • LOCAL AUTHORITY TOOLKIT Supporting Information · 02 Feb 2023
  • MOBILE UK HEALTH FACT SHEET Supporting Information · 02 Feb 2023
  • 002 SITE LOCATION PLAN Drawings and Images · 02 Feb 2023
  • H3G DENSIFICATION STREETWORKS Drawings and Images · 02 Feb 2023
  • H3G DENSIFICATION STREETWORKS Drawings and Images · 02 Feb 2023
  • H3G DENSIFICATION STREETWORKS Drawings and Images · 02 Feb 2023
  • H3G DENSIFICATION STREETWORKS Drawings and Images · 02 Feb 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Plymouth granted permission on 28 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 8 Twickenham Street Plymouth PL2 3FA

    20/00884/FUL Submitted 24 Jun 2020 100 yards away

    Part garage conversion

    Granted Full applications 16 docs
  • 187 Ham Drive Plymouth PL2 3RR

    24/01475/PRDE Submitted 7 Nov 2024 100 yards away

    Single storey side extension

    Granted Outline Extension 6 docs
    Small domestic
  • 225 Ham Drive Plymouth PL2 3NF

    24/01139/FUL Submitted 4 Sep 2024 100 yards away

    Dormer window to front elevation

    Granted Full applications Loft or dormer Windows or glazing 18 docs
  • 29 Melrose Avenue Plymouth PL2 3RG

    19/01034/EXUS Submitted 25 Jun 2019 150 yards away

    Establish existing use as Hot-Food Takeaway (Class A5)

    Granted Amendments 34 docs
  • 28 Millennium Street Plymouth PL2 3EE

    25/01159/FUL Submitted 3 Sep 2025 150 yards away

    Installation of a conservatory at rear of property

    Granted Full applications Extension 20 docs
  • 8 Springhill Green Plymouth PL2 3RP

    24/00823/HHR Submitted 26 Jun 2024 150 yards away

    Pre-application for an outbuilding and retaining wall (retrospective)

    Decided Householder 1 doc
    Small domestic

In Plymouth

  • 26/01236/MOR Awaiting decision

    33 - 37 New George Street Plymouth PL1 1RA

    Pre-application for new residential entrance to upper floors

    Received 4 Sep, published by the council 9 Sep 2026 Outline
  • 26/01205/MOR Awaiting decision

    54 Stuart Road Plymouth PL3 4EE

    Pre-application for extension of a bed and breakfast building to increase bedroom numbers

    Received 28 Aug, published by the council 1 Sep 2026 Outline
  • 25/01068/MOR Withdrawn

    Land Off Tothill Road Plymouth

    Pre-application for hybrid development comprising a full application for the creation of 8 Padel Courts with parking and other associated ancillary infrastructure and facilities, and outline consent for the use of the residual land holding for co-living for up to 29 units including communal on-site facilities with access only

    Received 12 Aug, published by the council 26 Jul 2026 Outline
  • 26/00540/MOR Decided

    Denmark, Horsham Lane Tamerton Foliot Plymouth PL5 4NP

    Pre-application for the erection of a single dwelling

    Received 15 Apr, published by the council 26 Jul 2026 Outline
  • 26/01146/PRDE Awaiting decision

    Ham Drive Nursery School Ham Drive Plymouth PL2 2NJ

    The proposal comprises the construction of a single-storey extension to the existing Ham Drive Nursery School building to provide additional teaching/play space, a sleep room, kitchen/baby change area, store and entrance lobby. The extension will be constructed in the position and to the dimensions shown on the submitted proposed plans and elevations. No new vehicular or pedestrian access is proposed and no new street is to be laid out. No new means of enclosure are proposed. Existing external access arrangements will remain unchanged. Localised hardstanding and external surfaces disturbed by the construction works will be reinstated or made good on completion. No significant new areas of hardstanding are proposed beyond those necessary immediately around the extension and for making good to existing surfaces. Foul drainage from the proposed kitchen sink and baby-change handwash basin will be connected into the existing drainage system, with the exact connection point to be verified on site. Surface water from the new pitched roof will be collected by gutters and rainwater downpipes and discharged to the existing surface water drainage system or other suitable existing drainage arrangement, subject to confirmation on site. The precise siting, footprint, dimensions, internal layout and external elevations of the proposed extension are shown on the submitted drawings.

    Received 13 Aug, published by the council 20 Aug 2026 Outline