Planning application
4 Honcray Plymouth PL9 7RP
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Rear dormer
As published by the council, reference 22/02128/FUL
Application record
- Reference
- 22/02128/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 28 Dec 2022
- Validated
- 5 Jan 2023
- Decided
- 9 Feb 2023
- Ward
- PLYMSTOCK RADFORD
- Decision by
- Delegated Decision
- Postcode
- PL9 7RP
Timeline
Dates from the published record
-
28 Dec 2022
Received by Plymouth
-
5 Jan 2023
Validated
Checked as complete and ready for consideration.
-
9 Feb 2023
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
22 applications on PlanIndex · across 3 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Kintra Honcray Plymouth PL9 7RP
Rear extension and demolition of existing extension
Granted Full applications Extension Demolition 14 docs -
Scott Cottage Millway Place Plymouth PL9 7RQ
Non-Material Amendment: To alter internal room allocations for application 18/00746/FUL
Decided Amendments 4 docs -
Scott Cottage Millway Place Plymouth PL9 7RQ
Conversion of property into 2 dwellings, internal alterations, demolition of rear extensions and formation of two off-road car parking spaces
Granted Full applications Extension Demolition 12 docsSeveral homes -
Longlands, Longlands Road Plymouth PL9 7RW
Extension of garage to form residential annexe with potential for future holiday let use (resubmission of 22/01693/FUL)
Granted Full applications Extension 17 docs -
14 Longfield Villas Plymouth PL9 7RS
93% historically approved · decision due ~8 Oct
Variation of Condition 1 (Approved Plans) of application 26/00429/FUL to add high window to the rear elevation wall
Awaiting decision Windows or glazing 4 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging