Skip to content
PlanIndex Get alerts
Menu

Planning application

22/02039/MOR

The Guildhall, Royal Parade Plymouth PL1 2BJ

Decided Plymouth Minor Pre Application Enquiry

Proposal

Pre-application to refurbish and re-imagine the Grade II listed building as a commercial standard multi-purpose events space, with aspirations to reduce running costs and where possible improve thermal efficiency and energy performance.

As published by the council, reference 22/02039/MOR

Timeline

Dates from the published record

  1. 9 Dec 2022

    Received by Plymouth

  2. 12 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 29 Mar 2023

    Decision issued: Closed Development Enquiry

  4. 31 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 25/01373/LBC Awaiting decision

    The Guildhall Royal Parade Plymouth PL1 2EL

    Various roof repairs and associated works (retrospective)

    17 Oct 2025 8m away Heritage and listed buildings
  • 26/00726/FUL Awaiting decision

    The Guildhall, Royal Parade Plymouth PL1 2BJ

    Installation of ramp and steps, window alterations, roof alterations and replacements, extraction ventilation, and various associated works

    22 May 2026 9m away Full applications
  • 26/00727/LBC Awaiting decision

    The Guildhall, Royal Parade Plymouth PL1 2BJ

    Installation of ramp and steps, window alterations, roof alterations and replacements, extraction ventilation, and various associated works

    22 May 2026 9m away Heritage and listed buildings
  • 26/00538/LBC Granted

    The Guildhall, Royal Parade Plymouth PL1 2BJ

    Removal of picture frame and installation of panelling infill to great hall internal wall

    15 Apr 2026 9m away Heritage and listed buildings
  • 25/01161/MOR Decided

    The Guildhall Royal Parade Plymouth PL1 2EL

    Pre-application for (1) Replacement Copper Roof, (2) Replacement covered fire escape from the Great Hall, (3) Improved access to the loft space - External staircase (4) Mahogany infill panel in Great Hall following the removal of a tapestry and its frame (5) Replacement doors and windows in the 'apartment' (6) Various external repairs recommended in Quadrennial Building Condition Survey

    4 Sep 2025 10m away Outline
  • 26/00537/LBC Awaiting decision

    The Guildhall Royal Parade Plymouth PL1 2EL

    Installation of demountable boards beneath hexagonal rooflights and associated works

    15 Apr 2026 12m away Heritage and listed buildings

In Plymouth

  • 26/01044/PRDE Awaiting decision

    58 Fletemoor Road Plymouth PL5 1UQ

    Demolition and construction of single storey rear extension

    24 Jul 2026 Outline
  • 26/01031/PRDE Awaiting decision

    15 Overton Gardens Plymouth PL3 5BX

    Single storey rear extension

    21 Jul 2026 Outline
  • 26/01020/MOR Awaiting decision

    16B Mount Street Greenbank Plymouth PL4 8NZ

    Conversion of two bed flat (C3) to three bedroom HMO (C4)

    20 Jul 2026 Outline
  • 26/01017/PRUS Awaiting decision

    68 Beaumont Road Plymouth PL4 9BP

    Use of existing dwellinghouse (Class C3) as supported living accomodation (Class C3(b)) for up to 6no. residents

    20 Jul 2026 Outline
  • 26/01024/PIP Awaiting decision

    Land At St Aubyn Road Plymouth PL1 4AE

    Permission in Principle for the erection of a three-storey building comprising 3 self-contained flats.

    20 Jul 2026 Outline