Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Staddon Park Road Plymouth PL9 9HL

Granted Plymouth 20/00954/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension with balcony (amendment to application 18/01418/FUL)

As published by the council, reference 20/00954/FUL

Application record

Reference
20/00954/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
6 Jul 2020
Validated
7 Jul 2020
Decided
13 Aug 2020
Ward
PLYMSTOCK RADFORD
Decision by
Delegated Decision
Postcode
PL9 9HL

Timeline

Dates from the published record

  1. 6 Jul 2020

    Received by Plymouth

  2. 7 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2020

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Yelverton

180 applications on PlanIndex · across 2 councils · 93% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14 Staddon Park Road Plymouth PL9 9HG

    24/01156/FUL Submitted 6 Sep 2024 66m away

    Removal of single storey rear extension and construction of new two storey rear extension and associated roof works to create loft conversion including raised ridge height and two side dormers. Extension to front elevation with new side entrance and steps.

    Withdrawn Full applications Extension Loft or dormer +1 13 docs
    Small domestic
  • 14 Staddon Park Road Plymouth PL9 9HG

    19/00465/FUL Submitted 22 Mar 2019 69m away

    Rear extension, porch and loft conversion including a raised ridge line (Part-retrospective)

    Withdrawn Full applications Extension Loft or dormer 11 docs
    Small domestic
  • 14 Staddon Park Road Plymouth PL9 9HG

    24/01231/HHR Submitted 23 Sep 2024 70m away

    Pre-application advice on application 24/01156/FUL

    Decided Householder 2 docs
    Domestic
  • 31 Staddon Park Road Plymouth PL9 9HL

    19/01009/FUL Submitted 21 Jun 2019 74m away

    Rear extension and demolish garage to form side porch.

    Granted Full applications Extension Demolition 24 docs
    Small domestic
  • 5 Staddon Park Road Plymouth PL9 9HL

    18/01517/FUL Submitted 31 Aug 2018 75m away

    Single storey rear extension

    Granted Full applications Extension 16 docs
    Small domestic
  • 9 Orchardton Terrace Plymouth PL9 9HR

    26/00887/PRDE Submitted 22 Jun 2026 181m away

    93% historically approved · decision due ~2 Sep

    Rear dormer

    Decided Loft or dormer 8 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications