Planning application
112 Woodford Avenue Plymouth PL7 4QS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side extension and linked front porch area inc. removal of existing side garage and store
As published by the council, reference 20/00299/FUL
Application record
- Reference
- 20/00299/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 24 Feb 2020
- Validated
- 2 Mar 2020
- Decided
- 24 Apr 2020
- Ward
- PLYMPTON ST MARY
- Decision by
- Delegated Decision
- Postcode
- PL7 4QS
Timeline
Dates from the published record
-
24 Feb 2020
Received by Plymouth
-
2 Mar 2020
Validated
Checked as complete and ready for consideration.
-
24 Apr 2020
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
104 Woodford Avenue Plymouth PL7 4QP
A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 3.3m, a maximum height of 4m, and eaves height of 2.6m
Granted Householder Extension 2 docsSmall domestic -
5 Cundy Close Plymouth PL7 4QH
Two storey side extension
Granted Full applications Extension 10 docs -
19 Tithe Road Plymouth PL7 4QQ
Retrospective application for First floor front extension
Granted Full applications Extension 8 docs -
11 Cundy Close Plymouth PL7 4QH
T1 (Oak): Reduce lower crown towards 97A Woodford Ave by 2-3m. Crown raise up to a height of 4m above ground level.
Granted Trees 2 docs -
40 Cundy Close Plymouth PL7 4QH
93% historically approved · decision due ~29 Sep
Single storey side and front extension
Awaiting decision Full applications Extension 14 docsSmall domestic -
44 Cundy Close Plymouth PL7 4QH
Non-material Amendment: Enlargement of gable window and relocation of bi-fold doors of application 22/01655/FUL
Decided Amendments Windows or glazing 3 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging