Skip to content
PlanIndex Get alerts
Menu

Planning application

142 Lake View Close Plymouth PL5 4LX

Granted Plymouth 20/00092/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension.

As published by the council, reference 20/00092/FUL

Application record

Reference
20/00092/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
22 Jan 2020
Validated
5 Feb 2020
Decided
24 Mar 2020
Ward
BUDSHEAD
Decision by
Delegated Decision
Postcode
PL5 4LX

Timeline

Dates from the published record

  1. 22 Jan 2020

    Received by Plymouth

  2. 5 Feb 2020

    Validated

    Checked as complete and ready for consideration.

  3. 24 Mar 2020

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 32 Tamerton Close Plymouth PL5 4JX

    20/00839/TPO Submitted 16 Jun 2020 89m away

    T1, T2 and T3 Ash - remove due to presence of Ash die back and decay in stem of T3. 1x Sycamore - Coppice to benefit Oak

    Granted Trees 5 docs
  • 84 Lake View Drive Plymouth PL5 4JZ

    18/01082/FUL Submitted 19 Jun 2018 93m away

    Convert garage to studio and rear and side extension.

    Granted Full applications Extension 11 docs
  • 57 And 59 Lake View Close Plymouth PL5 4LT

    19/00320/FUL Submitted 4 Mar 2019 130m away

    Hardstandings

    Granted Full applications 23 docs
  • 24 Tamerton Close Plymouth PL5 4JX

    21/00666/FUL Submitted 9 Apr 2021 138m away

    Part first-floor and single storey side extension with internal alterations.

    Granted Full applications Extension 11 docs
    Small domestic
  • 28 Lake View Close Plymouth PL5 4LX

    20/00583/FUL Submitted 22 Apr 2020 159m away

    Two-storey side extension, ground floor front extension, loft conversion and rear dormer

    Granted Full applications Extension Loft or dormer 20 docs
  • 68 Lake View Close Plymouth PL5 4LX

    20/00105/GP1 Submitted 23 Jan 2020 178m away

    A single-storey rear extension which extends beyond the rear wall of the original dwellinghouse by 5.99m, has a maximum height of 3.99m to ridge and has an eaves height of 2.99m

    Granted Householder Extension 8 docs
    Small domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications