Planning application
65-71 Cornwall Street Plymouth PL1 1RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of 1st and 2nd floors to 95-bed hotel (Class C1)
As published by the council, reference 19/01789/FUL
Application record
- Reference
- 19/01789/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant conditionally subject to S106
- Received
- 8 Nov 2019
- Validated
- 29 Nov 2019
- Decided
- 19 Oct 2020
- Ward
- ST PETER AND THE WATERFRONT
- Decision by
- Delegated Decision
- Postcode
- PL1 1RR
Timeline
Dates from the published record
-
8 Nov 2019
Received by Plymouth
-
29 Nov 2019
Validated
Checked as complete and ready for consideration.
-
19 Oct 2020
Decision issued: Grant conditionally subject to S106
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Hoddesdon
53 applications on PlanIndex · across 18 councils · 78% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
66 - 68 New George Street Plymouth PL1 1RR
Change of use of part of ground floor to car parking area and associated building alterations (retrospective)
Granted Full applications 27 docs -
50 New George Street Plymouth PL1 1RR
97% historically approved · decision due ~5 Aug
Two new fascia signs and two new projecting signs
Awaiting decision Advertising 17 docs -
50 New George Street Plymouth PL1 1RR
93% historically approved · decision due ~12 Aug
Alterations to shopfront and installation of roller shutter door
Awaiting decision Full applications Windows or glazing 20 docs -
66 - 68 New George Street Plymouth PL1 1RR
93% historically approved · decision due ~27 Oct
Reserved Matters application for approval of appearance, landscaping, and layout further to outline consent 23/00447/OUT for the erection of one additional floor for use as an Aparthotel (Class C1) and discharge of conditions 5 (Low Carbon Development Measures) and 6 (Biodiversity Net Gain) of 23/00447/OUT
Awaiting decision Reserved matters 36 docs -
To The Front Of 64-68 New George Street Plymouth
Proposed Free-Standing Advertising Information Unit featuring 2x internally illuminated digital displays (H 1635mm x W 924mm) to replace existing Free-Standing Advertising Information Unit featuring 2x internally illuminated 6-sheet displays.
Granted Advertising 14 docs -
To The Front Of 73-75 New George Street, Outside WH Smith Plymouth
Proposed free-standing advertising information unit featuring 2x internally illuminated digital displays (H 1635mm x W 924mm) to replace existing free-standing advertising information unit featuring 2x internally illuminated 6-sheet displays.
Granted Advertising 15 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01214/FUL Awaiting decision
10 Clifton Place Plymouth PL4 8HX
Change of use from a dwellinghouse (Class C3) to a residential Institution (Class C2)
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works